					Time / Date: 10/20/2025 12:02:32				 | 
					JSP ID: 4216				 | 
| 
					Scope of Work: Turn circuit 22 off in panel 311A then verify zero voltage in s1117				 | |
| 
					Work Order: 				 | 
					Building: 6				 | 
| 
					Person in Charge: Kevin hope				 | 
					Lead / Supervisor: Combs, Everett				 | 
| 
					Logged Email: khope@lbl.gov				 | 
					Division: ALS				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Chris Nelson 				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Hazardous Switching				 | 
					Panel / Equipment ID: 311a				 | 
| 
					System Information Review: Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Simple LOTO				 | |
| 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Tape off area suit up with appropriate fr clothing open door of panel 311a switch circuit breaker 22 to off position. Head over to s1117 to verify zero voltage | 
Control of Work Area
| 
					Minimum Approach Boundary: 102				 | 
| 
					Barricade Tape / Attendant: Warning - Orange				 | 
Shock Risk Assessment
| 
					System Voltage: 120/208 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: No				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 19.1 cal/cm2
				 | 
| 
					Arc Flash Boundary: 102”				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 4				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: 				 | 
| 
					Capacitor total stored energy (joules): 				 | 
| 
					Discharge wait time (minutes): 				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Behind s1122				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: L123				 | 
| 
					Fire Extinguisher Location: Panel 302a2a				 | 
| 
					Contact release method available and tested: Voltage gloves				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? None | 
Error Precursors
| 
					Task Demands: Repetitive actions or monotony				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: Complacency/overconfidence				 | 
| 
					Error Precursor Mitigations:  Stay present and focused | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov | 