					Time / Date: 10/22/2025 12:56:34				 | 
					JSP ID: 4224				 | 
| 
					Scope of Work: Switch Main breaker on 306a4a 2.turn on disconnect hpa1 fed from 306a4a and check voltage 				 | |
| 
					Work Order: ALS u routine 				 | 
					Building: 6				 | 
| 
					Person in Charge: Kevin hope				 | 
					Lead / Supervisor: Combs, Everett				 | 
| 
					Logged Email: khope@lbl.gov				 | 
					Division: ALS				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Tim nguyen				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Hazardous Switching				 | 
					Panel / Equipment ID: 306a4a				 | 
| 
					System Information Review: Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)				 | |
| 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Fill out jsp put on proper ppe the switch main breaker on . Proceed to hpa1 disconnect turn to on position and check voltage | 
Control of Work Area
| 
					Minimum Approach Boundary: 75				 | 
| 
					Barricade Tape / Attendant: Warning - Orange				 | 
Shock Risk Assessment
| 
					System Voltage: 277/480 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: No				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 15.7 cal/cm2
				 | 
| 
					Arc Flash Boundary: 75”				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 4				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: 				 | 
| 
					Capacitor total stored energy (joules): 				 | 
| 
					Discharge wait time (minutes): 				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Booster pit				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: L123				 | 
| 
					Fire Extinguisher Location: Outside office door				 | 
| 
					Contact release method available and tested: Voltage gloves				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Fall hazard | 
Error Precursors
| 
					Task Demands: Interpretation requirements				 | 
| 
					Work Environment: Distractions/interruptions				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: Assumptions				 | 
| 
					Error Precursor Mitigations:  Ask questions to understand task clearly. Remain focused throughout the task. Assume nothing be sure of everything | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov | 