Time / Date: 1/9/2023 13:24:53
JSP ID: 423
Scope of Work: Check blower motor ,not running
Work Order: 307416
Building:
Person in Charge: Antonio collado
Lead / Supervisor: Delgado, Alex
Logged Email: Acollado@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Justin walker
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 193a1a/ 72c bl 012
System Information Review: Panel Schedules
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Loto out motor, zvv and check if failed

Control of Work Area

Minimum Approach Boundary: 44
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 3 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 4.96 cal/cm2
Arc Flash Boundary: 44
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: 131
Emergency Number to Call: 6999
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 67 3rd floor lobby
Fire Extinguisher Location: Near entance 1st floor
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Wet location

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Watch step and ladder when climbing or descending

PPE Inspections

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov