					Time / Date: 10/24/2025 12:36:15				 | 
					JSP ID: 4240				 | 
| 
					Scope of Work: Reset breaker for car charger at building 90				 | |
| 
					Work Order: 461449				 | 
					Building: 90				 | 
| 
					Person in Charge: Shane Miller				 | 
					Lead / Supervisor: Secheck, Stephen				 | 
| 
					Logged Email: spmiller@lbl.gov				 | 
					Division: Facilities				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Armando Uribe				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: N/A				 | |
| 
					Switching: Non-Hazardous Switching				 | 
					Panel / Equipment ID: 659A ckt 34				 | 
| 
					System Information Review: Panel Schedules, Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Simple LOTO				 | |
| 
					Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Locate breaker at panel 659 ckt 34 dawn the proper PPE and reset tripped breaker ckt 34 Check for power at charger | 
Control of Work Area
| 
					Minimum Approach Boundary: 73"				 | 
| 
					Barricade Tape / Attendant: Attendant				 | 
Shock Risk Assessment
| 
					System Voltage: 120/208 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: No				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 12.8 cal/cm2 cal/cm2
				 | 
| 
					Arc Flash Boundary: 73"				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: Minimum PPE for Electrical Work				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: 				 | 
| 
					Capacitor total stored energy (joules): 				 | 
| 
					Discharge wait time (minutes): 				 | 
Emergency Response Plan
| 
					Nearest Landline Location: building 90 corridor				 | 
| 
					Emergency Number to Call: x6999				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: 90 corridor				 | 
| 
					Fire Extinguisher Location: 90 corridor				 | 
| 
					Contact release method available and tested: Voltage gloves				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? None | 
Error Precursors
| 
					Task Demands: 				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  none | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments, | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov | 