					Time / Date: 10/28/2025 9:42:46				 | 
					JSP ID: 4249				 | 
| 
					Scope of Work: To change 3-phase transformer taps, verify PFC connections and replace 3-phase input fuses if needed. 				 | |
| 
					Work Order: 				 | 
					Building: 88-Cave 4 Roof				 | 
| 
					Person in Charge: Patrick Coleman				 | 
					Lead / Supervisor: Other				 | 
| 
					Logged Email: pcoleman@lbl.gov				 | 
					Division: Other				 | 
| 
					QEW Level: QEW 1				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Shane Blim				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Non-Hazardous Switching				 | 
					Panel / Equipment ID: Magwatt M41/42 Power Supply.				 | 
| 
					System Information Review: Panel Schedules, Arc Flash Labels, LBL and vendor schematics.				 | |
| 
					Control of Hazardous Energy: Complex LOTO w/ RI				 | |
| 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. -Place new M41/42 power supply in LOTO. -Reposition the three XFMR tap cables to 4-5. -Remove the PFC cover and check all 3 input fuses to ensure they are still intact after the 3-phase circuit breaker located outside the building failed, and replace any fuses if blown. -Un-LOTO M41/42 power supply and take PF while at load. -Come out of LOTO and take PF measurement under load. | 
Control of Work Area
| 
					Minimum Approach Boundary: 42 inches				 | 
| 
					Barricade Tape / Attendant: Notice - Blue, Attendant				 | 
Shock Risk Assessment
| 
					System Voltage: 120 Vac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 3 inches				 | 
| 
					Will the hands enter the RAB: Yes				 | 
| 
					Voltage Glove Class: 00				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 0.17 cal/cm2
				 | 
| 
					Arc Flash Boundary: 5				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 1				 | 
| 
					Incident Energy Reduction Measures: 00				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: 679				 | 
| 
					Capacitor total stored energy (joules): 557				 | 
| 
					Discharge wait time (minutes): 1				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Control room				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: Control room , ground floor				 | 
| 
					Fire Extinguisher Location: Top of stairs				 | 
| 
					Contact release method available and tested: Voltage gloves				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Heavy traffic | 
Error Precursors
| 
					Task Demands: 				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: Unfamiliar with, or first time performing task				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  Work with those familiar, Use documentation, JSP. | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov | 