| 
					Time / Date: 10/29/2025 8:20:26				 | 
					JSP ID: 4253				 | 
| 
					Scope of Work: Megger and inspect ct-2				 | |
| 
					Work Order: 				 | 
					Building: 67A				 | 
| 
					Person in Charge: AndrewSouthward 				 | 
					Lead / Supervisor: Cameron, Benjamin				 | 
| 
					Logged Email: amaouthward@lbl.gov				 | 
					Division: Facilities				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Alma Armenta 				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Non-Hazardous Switching				 | 
					Panel / Equipment ID: 67A-CT2 				 | 
| 
					System Information Review: Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Simple LOTO				 | |
| 
					Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Establish simple LOTO at VFD, ZVV at disconnect, inspect motor, release LOTO and attempt to run | 
Control of Work Area
| 
					Minimum Approach Boundary: 42				 | 
| 
					Barricade Tape / Attendant: 				 | 
Shock Risk Assessment
| 
					System Voltage: 277/480 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: Yes				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 0.11 cal/cm2
				 | 
| 
					Arc Flash Boundary: 18”				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 1				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: Na 				 | 
| 
					Capacitor total stored energy (joules): Na 				 | 
| 
					Discharge wait time (minutes): Na 				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Cell phone 				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: On hand 				 | 
| 
					Fire Extinguisher Location: 72E				 | 
| 
					Contact release method available and tested: Voltage gloves				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Lookalike equipment, Noisy environment | 
Error Precursors
| 
					Task Demands: 				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  None | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov | 

