					JSP ID: 4258				 | 
| 
					Scope of Work: PM B74 AC 20				 | |
| 
					Work Order: 443420				 | 
					Building: B74				 | 
| 
					Person in Charge: Larry Antles				 | 
					Lead / Supervisor: Delgado, Alex				 | 
| 
					Logged Email: leantles@lbl.gov				 | 
					Division: Facilities				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Antonio Collado				 | |
| 
					List Other Participants: 				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Hazardous Switching				 | 
					Panel / Equipment ID: 47A3A/B74 AC 20 				 | 
| 
					System Information Review: Panel Schedules, Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Simple LOTO				 | |
| 
					Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. make contact with FAM, Fire Alarm, and FMCS LOTO ZVV equipment, pressure wash mist eliminators remove and replace filters check and tightened electrical | 
Control of Work Area
| 
					Minimum Approach Boundary: 43”				 | 
| 
					Barricade Tape / Attendant: Attendant				 | 
Shock Risk Assessment
| 
					System Voltage: 120/208 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: Yes				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 5.87 cal/cm2
				 | 
| 
					Arc Flash Boundary: 43”				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 2				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: N/a				 | 
| 
					Capacitor total stored energy (joules): n/a				 | 
| 
					Discharge wait time (minutes): n/a				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Hallway near 316c				 | 
| 
					Emergency Number to Call: 6999				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: At unit 				 | 
| 
					Fire Extinguisher Location: near unit 				 | 
| 
					Contact release method available and tested: Rescue hook				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Wet location, Lookalike equipment | 
Error Precursors
| 
					Task Demands: 				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  Electrical, slips trips and falls sharp edges overhead obstacles | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 