					Time / Date: 10/30/2025 11:56:22				 | 
					JSP ID: 4261				 | 
| 
					Scope of Work: Accel Air Systems performing maintenance and repairs to Cooling Tower 5				 | |
| 
					Work Order: NA				 | 
					Building: B59				 | 
| 
					Person in Charge: Ernie Jew				 | 
					Lead / Supervisor: Other				 | 
| 
					Logged Email: ejew@lbl.gov				 | 
					Division: Comp Sci				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Jeremy Lang				 | |
| 
					List Other Participants: Accel Air Systems techs				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Hazardous Switching				 | 
					Panel / Equipment ID: Cooling Tower 5				 | 
| 
					System Information Review: Panel Schedules, Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Complex LOTO w/ RI				 | |
| 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Notify the control room operator Turn off CT5 at BMS Turn off CT5 at VFD Hang Group LOTO lock and tag at VFD Hang Group LOTO lock and tag at fan drive shaft lock out device Place both Group LOTO keys in lock box and hang RI lock and tag on lock box Brief workers and have them hang LOTO lock ang tag on lock box Let workers perform work | 
Control of Work Area
| 
					Minimum Approach Boundary: 42"				 | 
| 
					Barricade Tape / Attendant: Attendant				 | 
Shock Risk Assessment
| 
					System Voltage: 277/480 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: No				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 0.71 cal/cm2
				 | 
| 
					Arc Flash Boundary: 13"				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: 1				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: NA				 | 
| 
					Capacitor total stored energy (joules): NA				 | 
| 
					Discharge wait time (minutes): NA				 | 
Emergency Response Plan
| 
					Nearest Landline Location: Control Room				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: Mechanical Level elevator lobby				 | 
| 
					Fire Extinguisher Location: Mechanical Level next to Tower Water Pumps				 | 
| 
					Contact release method available and tested: Rescue hook				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Wet location, Confined space, Fall hazard | 
Error Precursors
| 
					Task Demands: Simultaneous or multiple tasks				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  Look alike equipment, so take time to identify equipment before switching, and match isolation points to LOTO permit | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 