					Time / Date: 10/30/2025 13:10:18				 | 
					JSP ID: 4263				 | 
| 
					Scope of Work: Accel Air Systems is performing maintenance and repairs to Cooling Tower 1. 				 | |
| 
					Work Order: N/A				 | 
					Building: 059				 | 
| 
					Person in Charge: Jeremy Lang				 | 
					Lead / Supervisor: Other				 | 
| 
					Logged Email: jalang@lbl.gov				 | 
					Division: Comp Sci				 | 
| 
					QEW Level: QEW 2				 |  | 
| 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 | |
| 
					Second Person Requirement: Standby Person				 | |
| 
					Second Person Identified: Ernie Jew				 | |
| 
					List Other Participants: Accel Air Systems				 | |
| 
					Affected Persons Notified: Yes				 | |
| 
					Switching: Hazardous Switching				 | 
					Panel / Equipment ID: Cooling Tower 1				 | 
| 
					System Information Review: Panel Schedules, Arc Flash Labels				 | |
| 
					Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)				 | |
| 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 | |
Sequence of Job Steps
| 
					List basic sequence of steps from start to finish. Notify the control room operator Turn off CT1 on BMS Turn off VFD at CT1 Hang Group LOTO lock and tag at VFD Hang Group LOTO lock and tag at Fan drive shaft lockout device Place both Group LOTO keys in Lock box and hang RI lock and tag on lock box Brief workers and have them hang LOTO lock and tag on lock box Let workers perform work | 
Control of Work Area
| 
					Minimum Approach Boundary: 42"				 | 
| 
					Barricade Tape / Attendant: Warning - Orange				 | 
Shock Risk Assessment
| 
					System Voltage: 277/480 V ac				 | 
| 
					Limited Approach Boundary: 42 inches				 | 
| 
					Restricted Approach Boundary: 12 inches				 | 
| 
					Will the hands enter the RAB: No				 | 
| 
					Voltage Glove Class: 0				 | 
| 
					Will any other part of the body enter the RAB: No				 | 
Arc Flash Risk Assessment
| 
					Incident Energy: 1.1 cal/cm2
				 | 
| 
					Arc Flash Boundary: 17"				 | 
| 
					Working Distance: 18 inches				 | 
| 
					Arc Flash PPE Level: Minimum PPE for Electrical Work				 | 
| 
					Incident Energy Reduction Measures: 0				 | 
Capacitor Hazards
| 
					Capacitor Bus Voltage: N/A				 | 
| 
					Capacitor total stored energy (joules): N/A				 | 
| 
					Discharge wait time (minutes): N/A				 | 
Emergency Response Plan
| 
					Nearest Landline Location: NERSC Control Room 2nd Floor				 | 
| 
					Emergency Number to Call: 911				 | 
| 
					Sufficient cell phone signal? Yes				 | 
| 
					Clear exit path? Yes				 | 
| 
					AED Location: Mechanical Level Elevator Lobby 				 | 
| 
					Fire Extinguisher Location: Mechanical Level next to Tower Water Pumps				 | 
| 
					Contact release method available and tested: Rescue hook				 | 
Environmental Conditions
| 
					Does the environment present additional hazards that should be addressed? Wet location | 
Error Precursors
| 
					Task Demands: 				 | 
| 
					Work Environment: 				 | 
| 
					Individual Capabilities: 				 | 
| 
					Human Nature: 				 | 
| 
					Error Precursor Mitigations:  Look-alike equipment. Ensure proper equipment is identified, matching the LOTO permit. | 
PPE Inspections
| 
					Safety glasses (ANSI Z87), Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments | 
Notes / Other
|  | 
Perform Job Breifing
| 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  A Job Briefing at a minimum must include: 