Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 10/31/2025 9:53:19
JSP ID: 4270
Scope of Work: Replace car charger "like for like"

General Information

Work Order
467713
Building
76
Person in Charge
Shane Miller
Lead / Supervisor
Secheck, Stephen
Logged Email
spmiller@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Standby Person
Second Person Identified
Armanando Uribe
Other Participants
Affected Persons Notified
N/A

System / Equipment

Switching
Non-Hazardous Switching
Panel / Equipment ID
501A7A
System Information Review
☑ Panel Schedules
☑ Arc Flash Labels
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ Properly installed
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
Loto at panel 501A7A ZVV remove existing Xeal charger replace with new Xeal charger release Loto

Control of Work Area

Minimum Approach Boundary
55"
Barricade Tape / Attendant
Attendant

Shock Risk Assessment

System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
8.04cal/cm2 cal/cm2
Arc Flash Boundary
55"
Working Distance
18 inches
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
Capacitor Total Stored Energy (Joules)
Discharge Wait Time (Minutes)

Emergency Response Plan

Nearest Landline Location
Building 76
Emergency Number to Call
x6999
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Building 76 corridor
Fire Extinguisher Location
Building 76 corridor
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
None

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
none

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan