Time / Date: 1/13/2023 8:46:06
|
JSP ID: 442
|
Scope of Work: I will be replacing ballast in light fixture LF3
|
|
Work Order: Training
|
Building:
|
Person in Charge: Sayee Chea
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: schea@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified:
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: BB-2
|
System Information Review: Panel Schedules, No arc flash Hard 120V
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Fill out JSP, Identify panel and circuit breaker. Identify shock hazard and arch flash hazard. And, PPE. Apply logo, perform zvv, then replace ballast. |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: NA cal/cm2
|
Arc Flash Boundary: O
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Cell phone
|
Emergency Number to Call: 5104867911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Room 101
|
Fire Extinguisher Location: Room 101 back of room 103
|
Contact release method available and tested: Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Heavy traffic |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No errors |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |