Time / Date: 1/17/2023 12:16:58
|
JSP ID: 452
|
Scope of Work: Perform leak check on ac 46
|
|
Work Order: 307328
|
Building:
|
Person in Charge: Mike Capete
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jwwalker@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Justin Walker
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 44A1B/9. 46 Ac 46
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Go over job scope. Identify hazards. Fill out SHA and AHA. Have safety briefing. Perform loto and zvv. Open panel to refrigerant circuit. Pressurize with nitrogen and inspect refrigerant piping use electronic leak detector and soap bubbles to locate source of refrigerant leak. Leave unit under loto until leak has been repaired. |
Control of Work Area
Minimum Approach Boundary: 51 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/240 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 6.26 cal cal/cm2
|
Arc Flash Boundary: 51 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: 146C
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Have HvAC shop AED on roof with us.
|
Fire Extinguisher Location: Room 144
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Fall hazard, Roof top. Fall protection needed |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No error precursors. Weather is good and both technicians alert and competent to complete task |
PPE Inspections
|
Notes / Other
No error precursors. Weather is good and both technicians alert and competent to complete task
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: