Logo

QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 2/17/2026 8:01:18
JSP ID: 4561
Scope of Work: Switch panel 311 A circuit 34 and Loto for ZVV panel 311A34A and pull in circuits for sector 11 racks

General Information

Work Order
ALSU Routine 415062
Building
B 6 ALS storage ring pit sector 11
Person in Charge
Christopher NELSON
Lead / Supervisor
Keusch, Justen
Logged Email
cnelson@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 1 - LOTO & Zero Voltage Verification
QEW Level
QEW 2
Second Person Requirement
Standby Person
Second Person Identified
David Davis
Other Participants
ALS EM
Affected Persons Notified
Yes

System / Equipment

Switching
Hazardous Switching
Panel / Equipment ID
311A and 311A34A
System Information Review
☑ Panel Schedules
☑ Arc Flash Labels
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ Properly installed
☑ Properly maintained
☑ All doors and covers closed and fully latched
☑ No signs of impending failure
☑ Not energizing equipment for the first time
☑ or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish
Fill out JSP Barricade area with warning signs and tape. Select PPE and inspect it. get EM to place there admin lock and inform ALS control room. When Loto of circuit 34 is established ZVV panel 311A43A. When ZVvV has been done perfoed begin work.

Control of Work Area

Minimum Approach Boundary
102”
Barricade Tape / Attendant
Warning - Orange

Shock Risk Assessment

System Voltage
120/208 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
Yes
Voltage Glove Class
0
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
19.1 cal/cm2
Arc Flash Boundary
102”
Working Distance
18 inches
Arc Flash PPE Level
2
Incident Energy Reduction Measures
0

Capacitor Hazards

Capacitor Bus Voltage
N A
Capacitor Total Stored Energy (Joules)
Na
Discharge Wait Time (Minutes)
NA

Emergency Response Plan

Nearest Landline Location
On booster wall about 60 ft from panel
Emergency Number to Call
911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
On rack L123 next to linac entrance
Fire Extinguisher Location
On the side of panel 302A2A in sector 12 pit
Contact Release Method Available and Tested
Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?
Insufficient lighting, Noisy environment

Error Precursors

Task Demands
Work Environment
Distractions/interruptions
Individual Capabilities
Imprecise communication habits
Human Nature
Stress (limits attention)
Error Precursor Mitigations
Be aware and have good communication leave stress at home

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Arc-rated clothing (flash suit
☑ daily wear) including face shield
☑ balaclava
☑ hood.
☑ Hearing protection
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Removal of conductive articles
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan