☑ Properly installed ☑ Properly maintained ☑ All doors and covers closed and fully latched ☑ No signs of impending failure ☑ Not energizing equipment for the first time ☑ or after electrical repair
Sequence of Job Steps
List basic sequence of steps from start to finish
1. Have the control room remotely open breaker 80A12.
2. Verify breaker open.
3. Rack out with remote rack out.
4. Remove and place in the spare cell
5. Install and rack in new breaker to 80A12
6. Notify the control room
Control of Work Area
Minimum Approach Boundary
134”
Barricade Tape / Attendant
Attendant
Shock Risk Assessment
System Voltage
277/480 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
No
Voltage Glove Class
Not Required
Will any other part of the body enter the RAB
No
Arc Flash Risk Assessment
Incident Energy
27.1 cal/cm2
Arc Flash Boundary
134in
Working Distance
24 inches
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
Not Required
Capacitor Hazards
Capacitor Bus Voltage
Capacitor Total Stored Energy (Joules)
Discharge Wait Time (Minutes)
Emergency Response Plan
Nearest Landline Location
N/A
Emergency Number to Call
510-486-6999
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Control RooM
Fire Extinguisher Location
Bottom of the stairs
Contact Release Method Available and Tested
Rescue hook
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None
Error Precursors
Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
N/A
PPE Inspections
☑ Safety glasses (ANSI Z87) ☑ Arc-rated clothing (flash suit ☑ daily wear) including face shield ☑ balaclava ☑ hood. ☑ Hearing protection ☑ Non-melting footwear that fully covers the feet
Notes / Other
Perform Job Briefing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Detailed Scope of Work
Shock and arc flash hazards for each task
Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
Work area controls (barricades, signs, attendants)