Time / Date: 1/20/2023 8:37:20
|
JSP ID: 470
|
|
Scope of Work: Replace existing twist-lock receptacle with new Hubbell 5461 style.
|
|
|
Work Order: W0292066
|
Building:
|
|
Person in Charge: Greg Neidiger
|
Lead / Supervisor: Ramer, Robert
|
|
Logged Email: gcn@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Not Required
|
|
|
Second Person Identified:
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified:
|
|
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 67A18A
|
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
1) Switch and LOTO circuit 2) Perform ZVV 3) Replace receptacle 4) Release LOTO, energize and test voltage at outlet. |
Control of Work Area
|
Minimum Approach Boundary: n/a
|
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
|
System Voltage: No Shock Hazard Present
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: No
|
|
Voltage Glove Class: 00
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 16.1 cal/cm2
|
|
Arc Flash Boundary: 76in.
|
|
Working Distance: No Arc Flash Hazard Present
|
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
|
Capacitor Bus Voltage:
|
|
Capacitor total stored energy (joules):
|
|
Discharge wait time (minutes):
|
Emergency Response Plan
|
Nearest Landline Location:
|
|
Emergency Number to Call:
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: elevator lobby
|
|
Fire Extinguisher Location: in corridor outside room
|
|
Contact release method available and tested:
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
|
Task Demands:
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature:
|
|
Error Precursor Mitigations:
I am of sound mind and body and I am ready to safely complete my task after reviewing potential error precursors. |
PPE Inspections
|
|
Notes / Other
|
At least two upstream OCPDs before 208V equipment. No AF hazard present.
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |