Time / Date: 1/20/2023 10:30:39
JSP ID: 475
Scope of Work: investigate possible back fed circuit involving an FPU
Work Order: 309875
Building:
Person in Charge: Shane Miller
Lead / Supervisor: Secheck, Stephen
Logged Email: spmiller@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
Second Person Requirement: Standby Person
Second Person Identified: Nick Gripe
List Other Participants:
Affected Persons Notified: N/A
Switching: Non-Hazardous Switching
Panel / Equipment ID: 25A11A ckt33
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Circuit has already been LOTO'd. Dawn proper ppe and ZVV at FPU. Investigate ckt from panel 25A11B ckt 33 to see if there is a second source of power tied to it.

Control of Work Area

Minimum Approach Boundary: 42"
Barricade Tape / Attendant: Danger - Red, Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: Avoid contact
Will the hands enter the RAB: No
Voltage Glove Class: 00
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: <1.2 cal/cm2 cal/cm2
Arc Flash Boundary: 18"
Working Distance: No Arc Flash Hazard Present
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 00

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: 6045
Emergency Number to Call: x6999
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: on cart
Fire Extinguisher Location: hallway outside work area
Contact release method available and tested: Upstream breaker or switch, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

none

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov