Time / Date: 1/23/2023 14:16:06
|
JSP ID: 490
|
Scope of Work: Loto lighting circuit in to a safe work
|
|
Work Order: 309866
|
Building:
|
Person in Charge: Beau Erwin
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: beauerwin81@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Alex Lopez
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 566A16A/7
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Loto,ZVV,removed light fixture . Put conductors in a j-box and safety off. Turned lighting circuit back on.. ready for fmcs to do there work.. |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant: Caution - Yellow
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 15.1 cal/cm2
|
Arc Flash Boundary: 73”
|
Working Distance: 24 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Hallway
|
Emergency Number to Call:
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 6th flr hallway
|
Fire Extinguisher Location: 6th flr hallway
|
Contact release method available and tested: Voltage gloves,
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: