Time / Date: 1/24/2023 13:11:05
|
JSP ID: 501
|
Scope of Work: Replace contactor in panel 208a fed by disconnect 16A.
|
|
Work Order: Training.
|
Building:
|
Person in Charge: Justin walker
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jwwalker@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Mike Rose
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Disc. 16A.
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Define scope of work. Identify switching procedure. Perform shock hazard assessment. and arc flash hazard assessment. Determine proper ppe required to complete job assignment. Determine proper controls.determine type of switching. Determine type of loto. Determine 2nd person needed. Go over safety briefing. Contact affected individuals. Determine barricade and signage. Set up limited approach boundary. And barricades. Apply loto , verify ZVV. REplace contactor. Put equipment back together. Remove loto and verify zvv. |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 2.37 cal/cm2 cal/cm2
|
Arc Flash Boundary: 26 inches.
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/a
|
Discharge wait time (minutes): N/a
|
Emergency Response Plan
Nearest Landline Location: 75 back door phone in hall as you enter.
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 75A
|
Fire Extinguisher Location: 75A outside back door.
|
Contact release method available and tested: Upstream breaker or switch, 234A breakers 14, 16, and 18
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No current error precursors. Comfortable with job scope and in sound mind. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |