|
Time / Date: 10/3/2022 14:32:04
|
JSP ID: 51
|
|
Scope of Work: Troubleshoot B64 ARU005
|
|
|
Work Order: W0298444
|
Building:
|
|
Person in Charge: Larry Antles
|
Lead / Supervisor: Delgado, Alex
|
|
Logged Email: leantles@lbl.gov
|
Division: Facilities
|
|
QEW Level: QEW 2
|
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
|
Second Person Requirement: Standby Person
|
|
|
Second Person Identified: Gerald Fowler
|
|
|
List Other Participants:
|
|
|
Affected Persons Notified:
|
|
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 512A7AD1A-16 rm 140/B64 ARU005
|
|
System Information Review: Arc Flash Labels
|
|
|
Control of Hazardous Energy: Simple LOTO
|
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
|
Sequence of Job Steps
|
List basic sequence of steps from start to finish.
|
Control of Work Area
|
Minimum Approach Boundary: 42”
|
|
Barricade Tape / Attendant: Warning
|
Shock Risk Assessment
|
System Voltage: 277/480 V ac
|
|
Limited Approach Boundary: 42 inches
|
|
Restricted Approach Boundary: 12 inches
|
|
Will the hands enter the RAB: Yes
|
|
Voltage Glove Class: 0
|
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
|
Incident Energy: 5.12 cal/cm^2 cal/cm2
|
|
Arc Flash Boundary: 37In
|
|
Working Distance: 18 inches
|
|
Arc Flash PPE Level: 2
|
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
|
Capacitor Bus Voltage: None
|
|
Capacitor total stored energy (joules): None
|
|
Discharge wait time (minutes): None
|
Emergency Response Plan
|
Nearest Landline Location: B64 Rm 160
|
|
Emergency Number to Call: 6999
|
|
Sufficient cell phone signal? Yes
|
|
Clear exit path? Yes
|
|
AED Location: B64 hallway by lab 142
|
|
Fire Extinguisher Location: My service truck
|
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
|
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
|
Task Demands: Time pressure (in a hurry)
|
|
Work Environment:
|
|
Individual Capabilities:
|
|
Human Nature: Stress (limits attention)
|
|
Error Precursor Mitigations:
Slippery oak leaves, trip hazards, electrical hazards |
PPE Inspections
|
|
Notes / Other
|
|
Perform Job Breifing
|
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |
