Time / Date: 1/26/2023 8:16:08
|
JSP ID: 510
|
Scope of Work: Test test
|
|
Work Order: Test test
|
Building:
|
Person in Charge: test
|
Lead / Supervisor: Other
|
Logged Email: mvr@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Test test
|
|
List Other Participants: Test test
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: Test test
|
System Information Review: Single Line Drawing
|
|
Control of Hazardous Energy: Exclusive Control of Plug
|
|
Equipment Condition: Properly maintained
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Test test |
Control of Work Area
Minimum Approach Boundary: Test test
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: Test test cal/cm2
|
Arc Flash Boundary: 18
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Test test
|
Emergency Number to Call: Test test
|
Sufficient cell phone signal? No
|
Clear exit path? Yes
|
AED Location: Test test
|
Fire Extinguisher Location: Test test
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment: Obscure electrical supplies or configurations
|
Individual Capabilities: Unsafe attitudes for critical task
|
Human Nature: Habit patterns
|
Error Precursor Mitigations:
Test test |
PPE Inspections
|
Notes / Other
Test test
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |