					Time / Date: 1/27/2023 13:52:45				 				
				 | 
				
				 
					JSP ID: 524				 
				 | 
				
| 
				 
					Scope of Work: Preventive maintenance 				 				
				 | 
				|
| 
				 
					Work Order: W0287326				 				
				 | 
				
				 
					Building: 				 				
				 | 							
				
| 
				 
					Person in Charge: Juan Juarez Garcia 				 				
				 | 
				
				 
					Lead / Supervisor: Delgado, Alex				 
				 | 
				
| 
				 
					Logged Email: juanjuarez37@lbl.gov				 				
				 | 
				
				 
					Division: Facilities				 				
				 | 
				
| 
				 
					QEW Level: QEW 2				 				
				 | 
				
				 | 
				
| 
				 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 				
				 | 
				|
| 
				 
					Second Person Requirement: Safety Watch				 				
				 | 
				|
| 
				 
					Second Person Identified: Antonio collado				 				
				 | 
				|
| 
				 
					List Other Participants: 				 				
				 | 
				|
| 
				 
					Affected Persons Notified: Yes				 				
				 | 
				|
| 
				 
					Switching: Hazardous Switching				 				
				 | 
				
				 
					Panel / Equipment ID: 25A18A33A—50AC22				 
				 | 
				
| 
				 
					System Information Review: Arc Flash Labels				 				
				 | 
				|
| 
				 
					Control of Hazardous Energy: Simple LOTO				 				
				 | 
				|
| 
				 
					Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 				
				 | 
				|
Sequence of Job Steps
| 
				 
					List basic sequence of steps from start to finish. 				
				After the safety briefing I established LOTO AND ZVV ,removed the access panel to perform visual inspection , thigh in screws and check electrical components, replaced air filters , checked indoor blower components, reconnected power supply and performed a system test.  | 
				
Control of Work Area
| 
				 
					Minimum Approach Boundary: 54				 				
				 | 
				
| 
				 
					Barricade Tape / Attendant: Attendant				 
				 | 
				
Shock Risk Assessment
| 
				 
					System Voltage: 120/208 V ac				 				
				 | 
				
| 
				 
					Limited Approach Boundary: 42 inches				 				
				 | 
				
| 
				 
					Restricted Approach Boundary: 12 inches				 				
				 | 
				
| 
				 
					Will the hands enter the RAB: Yes				 				
				 | 
				
| 
				 
					Voltage Glove Class: 0				 				
				 | 
				
| 
				 
					Will any other part of the body enter the RAB: No				 				
				 | 
				
Arc Flash Risk Assessment
| 
				 
					Incident Energy: 11.1 cal/cm2
				 				
				 | 
				
| 
				 
					Arc Flash Boundary: 54				 				
				 | 
				
| 
				 
					Working Distance: 18 inches				 				
				 | 
				
| 
				 
					Arc Flash PPE Level: 4				 				
				 | 
				
| 
				 
					Incident Energy Reduction Measures: 0				 				
				 | 
				
Capacitor Hazards
| 
				 
					Capacitor Bus Voltage: 				 				
				 | 
				
| 
				 
					Capacitor total stored energy (joules): 				 				
				 | 
				
| 
				 
					Discharge wait time (minutes): 				 				
				 | 
				
Emergency Response Plan
| 
				 
					Nearest Landline Location: Inside room 				 				
				 | 
				
| 
				 
					Emergency Number to Call: 7911				 				
				 | 
				
| 
				 
					Sufficient cell phone signal? Yes				 				
				 | 
				
| 
				 
					Clear exit path? Yes				 				
				 | 
				
| 
				 
					AED Location: Portable AED				 				
				 | 
				
| 
				 
					Fire Extinguisher Location: OutsIDE room 6016				 				
				 | 
				
| 
				 
					Contact release method available and tested: Rescue hook, Voltage gloves				 				
				 | 
				
Environmental Conditions
| 
				 
					Does the environment present additional hazards that should be addressed? 				
				None  | 
				
Error Precursors
| 
				 
					Task Demands: 				 				
				 | 
				
| 
				 
					Work Environment: 				 				
				 | 
				
| 
				 
					Individual Capabilities: 				 				
				 | 
				
| 
				 
					Human Nature: 				 				
				 | 
				
| 
				 
					Error Precursor Mitigations:  				
				Climbing ladder — always maintaining 3 point contact  | 
				
PPE Inspections
| 
				 | 
				
Notes / Other
| 
				 | 
				
Perform Job Breifing
| 
				 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  				
				A Job Briefing at a minimum must include: 