Time / Date: 1/30/2023 8:19:51
JSP ID: 529
Scope of Work: Annual pm for 70Au 008
Work Order: 299281
Building:
Person in Charge: Justin walker
Lead / Supervisor: Delgado, Alex
Logged Email: jwwalker@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Juan Gacia
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 70A2A7A/15. 70A Aru 008
System Information Review: Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Go over job scope. Fill out JSP.performed safety briefing. Put on determined ppe. Apply loto and verify zvv. Perform steps on annual pm. Remove loto, verify proper voltage and check equipment operations.

Control of Work Area

Minimum Approach Boundary: 99 inches
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 25.9cm2 cal/cm2
Arc Flash Boundary: 99 inches
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: 2nd floor hallway outside room 249
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Have HVAC portable AED in work area
Fire Extinguisher Location: 70 penthouse at room entrance
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Rooftop work

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

No current error precursors. Technicians alert and comfortable with job scope

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov