Time / Date: 2/1/2023 12:16:41
|
JSP ID: 550
|
Scope of Work: Replace breaker 80A5 with spare
|
|
Work Order:
|
Building:
|
Person in Charge: Andrew Southward
|
Lead / Supervisor: Cameron, Benjamin
|
Logged Email: amsouthward@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Ben Cameron
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: 80A
|
System Information Review: Single Line Drawing, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Establish safe work zone, remove breaker 80A5 from cell, remove spare breaker from cell, exchange breakers, rack in new 80A5 breaker |
Control of Work Area
Minimum Approach Boundary: 134
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 27.1 cal/cm2
|
Arc Flash Boundary: 134 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: 88
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On hand
|
Fire Extinguisher Location: 88
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient/cramped/awkward space, Lookalike equipment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.