Time / Date: 2/2/2023 9:35:44
JSP ID: 552
Scope of Work: Perform chiller annual on 50a Aru 005
Work Order: Wo299248
Building:
Person in Charge: Justin walker
Lead / Supervisor: Delgado, Alex
Logged Email: jwwalker@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Juan Garcia
List Other Participants:
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 35C breaker 11. 50A Aru 005
System Information Review: Arc Flash Labels, FLP#63
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Go over job scope with HvAC lead. Fill out JSP for along with AFHA, and SHA. Determine proper ppe for switching and zvv. Perform safety briefing. Perform loto and zvv according to FLP. Perform annual pm on chiller. Once pm has been completed. Reassemble chiller. Remove loto, verify proper voltage check chiller operation and return to service.

Control of Work Area

Minimum Approach Boundary: 95 inches
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 24.3cal2 cal/cm2
Arc Flash Boundary: 95
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: 50A room 135
Emergency Number to Call: 911 or 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Have HVAC portable AED on site
Fire Extinguisher Location: 50a room 141
Contact release method available and tested: Upstream breaker or switch, Voltage gloves,

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Noisy environment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

No current error precursors. Technicians comfortable with job scope.

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments,
Electrical zero voltage proving unit

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan