Time / Date: 2/6/2023 13:24:18
|
JSP ID: 555
|
Scope of Work: Verify power at disconnect.
|
|
Work Order: W0311155
|
Building:
|
Person in Charge: Alejandro Lopez
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: alopez2@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Nick Gripe
|
|
List Other Participants: None
|
|
Affected Persons Notified: Yes
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 72A4A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Install LOTO, ZVV and check power wires feeding equipment are not compromised. |
Control of Work Area
Minimum Approach Boundary: 3
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 3 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 13 cal/cm2
|
Arc Flash Boundary: 13
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Near equipment
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Room 123
|
Fire Extinguisher Location: Room 123
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Fall hazard, Noisy environment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Insulated tools |
Notes / Other
None
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |