Time / Date: 10/5/2022 8:32:33
|
JSP ID: 57
|
Scope of Work: Electrical troubleshooting
|
|
Work Order: 297148
|
Building:
|
Person in Charge: Michael Capeto
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: mcapeto@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Larry Antles
|
|
List Other Participants:
|
|
Affected Persons Notified:
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 46 AC 041
|
System Information Review: Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
|
Control of Work Area
Minimum Approach Boundary: 74 inches
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 21 calories cal/cm2
|
Arc Flash Boundary: 74 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Room 175 F
|
Emergency Number to Call: X6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: 2nd floor 275C
|
Fire Extinguisher Location: Ground level truck
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Wet location, Fall hazard, Lookalike equipment |
Error Precursors
Task Demands: Critical steps or irreversible acts
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Not wearing fall gear correctly. Slipping on roof. |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |