Time / Date: 2/13/2023 7:33:29
|
JSP ID: 582
|
Scope of Work: Panel 283A investigation to rework adjacent 4” wireway to accommodate scientists equipment
|
|
Work Order: 305571
|
Building:
|
Person in Charge: Everett combs
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: ccryken@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Robert ralph
|
|
List Other Participants:
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: 283A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Open wireways for visual inspections and investigations. Determine time and potential problems. Adjust panel schedule to reflect current configuration. |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.2 cal/cm2
|
Arc Flash Boundary: 18”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Various work station near by
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Bldg 80 control room
|
Fire Extinguisher Location: 25 feet to side of panel
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient lighting, Heavy traffic |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Invalidated time pressures |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |