Time / Date: 2/13/2023 7:42:51
|
JSP ID: 583
|
Scope of Work: Investigation of panel and wireway while energized in order to see what will be affected by shutting down panel to remove and replace 4x4 wireway.
|
|
Work Order: 305571
|
Building:
|
Person in Charge: Everett Combs
|
Lead / Supervisor: Other
|
Logged Email: RobertRalph@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Robert Ralph
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: No Switching Required
|
Panel / Equipment ID: 283A
|
System Information Review:
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Open wireway to see path and number of circuits affected. Open hinged panel cover to verify path and length of circuits inside panel. |
Control of Work Area
Minimum Approach Boundary: 42”
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 1.2 cal/cm2
|
Arc Flash Boundary: 18”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: B80
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Lobby B6
|
Fire Extinguisher Location: 30’ away
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Heavy traffic |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |