Time / Date: 2/15/2023 13:29:09
JSP ID: 602
Scope of Work: Switching
Work Order: 310590
Building:
Person in Charge: Joe
Lead / Supervisor: Cameron, Benjamin
Logged Email: ajturner2@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Joe pica
List Other Participants: Avery Turner
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: PNL 025-46
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure

Sequence of Job Steps

List basic sequence of steps from start to finish.

Lotto

Control of Work Area

Minimum Approach Boundary: 65
Barricade Tape / Attendant: Danger - Red

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 12.1 cal/cm2
Arc Flash Boundary: 65 inches
Working Distance: 18 inches
Arc Flash PPE Level: 2+
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: None
Capacitor total stored energy (joules): None
Discharge wait time (minutes): None

Emergency Response Plan

Nearest Landline Location: On site
Emergency Number to Call: 711
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location:
Fire Extinguisher Location: Hall way
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Confined space

Error Precursors

Task Demands: Time pressure (in a hurry)
Work Environment:
Individual Capabilities:
Human Nature: Stress (limits attention)
Error Precursor Mitigations:

Yes

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov