Time / Date: 2/21/2023 13:40:52
|
JSP ID: 621
|
Scope of Work: verify circuit 11 is feeding the OC sensors.
|
|
Work Order: 313481
|
Building:
|
Person in Charge: nick gripe
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: ngripe@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: alex lopez
|
|
List Other Participants:
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: 35A1A/11
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: LOTO Not Required (Mode 2 or 3 only)
|
|
Equipment Condition:
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
trace conduits and wires. |
Control of Work Area
Minimum Approach Boundary: 60 inches.
|
Barricade Tape / Attendant: Danger - Red
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: 60 inches
|
Restricted Approach Boundary: closed door and had attendant at the light switch.
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: overdutied panel. cal/cm2
|
Arc Flash Boundary: overdutied panel.
|
Working Distance: overdutied panel. not working in the panel. just a single light switch.
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: room 1132
|
Emergency Number to Call: 6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: server room.
|
Fire Extinguisher Location: hallway
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
none |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |