Time / Date: 3/1/2023 7:30:09
JSP ID: 652
Scope of Work: Switching support
Work Order: W0311360
Building:
Person in Charge: Colmenares
Lead / Supervisor: Cameron, Benjamin
Logged Email: jcolmenares@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Pica
List Other Participants: HVAC Personnel
Affected Persons Notified: N/A
Switching: Hazardous Switching
Panel / Equipment ID: 31A. PNL-001-70A
System Information Review: Panel Schedules
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Brief clear room remote switching 480

Control of Work Area

Minimum Approach Boundary: Max outside
Barricade Tape / Attendant: Danger - Red, Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: Over Duty panel
Restricted Approach Boundary: Remote switching
Will the hands enter the RAB: No
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: Over duty panel cal/cm2
Arc Flash Boundary: On listed
Working Distance: Remote switching
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: By Elevator
Emergency Number to Call: 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On site
Fire Extinguisher Location: By switchgear
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Wet location, Lookalike equipment, Noisy environment, One light fixture out

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov