Time / Date: 3/1/2023 8:35:06
|
JSP ID: 655
|
Scope of Work: Will be replacing exterior lights
|
|
Work Order: 312500
|
Building:
|
Person in Charge: Arnel Jugarap
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: schea@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Sayee Chea / Frank Hampton
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 217A1A1A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Setup the Boom Lift, notify customers, locate panel and Socket Breaker, secure area to keep people out, perform ZVV after applying LOTO, inspects 0 Voltage gloves, meter and tools, then replace light fixtures. Will inform customers after job is complete |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 3.15 cal/cm2
|
Arc Flash Boundary: 33 Inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: (510) 325-9027
|
Emergency Number to Call: (510) 486-7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Base of stairs room 123
|
Fire Extinguisher Location: Loading dock of room 150
|
Contact release method available and tested: Voltage gloves, Lower Boom Lift manually from the ground
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Heavy traffic, Fall hazard |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
NA |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |