Time / Date: 3/2/2023 13:53:55
|
JSP ID: 669
|
Scope of Work: Perform maintenance on 26ac 18
|
|
Work Order: 304110
|
Building:
|
Person in Charge: Justin walker
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jwwalker@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Darren Kranz
|
|
List Other Participants: No other participant other than standby person
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: E43A1A-37
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Go over job briefing and safety plan. Fill out and submit JSP. Put on required ppe. Apply loto and verify zvv. Execute required maintenance. Remove loto and check unit operations. Return to service. |
Control of Work Area
Minimum Approach Boundary: 43”
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 7.06 cal cal/cm2
|
Arc Flash Boundary: 43 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: 26room 149
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Have HVAC shop AED oat location
|
Fire Extinguisher Location: 26 outside room 153
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Fall hazard, Working on roof . Has guard rails in place. |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
There are no error precursors at this time. Technicians are comfortable with task and have performed this pm multiple times with no safety issues |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |