☑ Properly installed ☑ All doors and covers closed and fully latched ☑ No signs of impending failure ☑ Not energizing equipment for the first time ☑ or after electrical repair
Sequence of Job Steps
List basic sequence of steps from start to finish
Switching process performed
Control of Work Area
Minimum Approach Boundary
120
Barricade Tape / Attendant
Attendant
Shock Risk Assessment
System Voltage
277/480 V ac
Limited Approach Boundary
42 inches
Restricted Approach Boundary
12 inches
Will the hands enter the RAB
No
Voltage Glove Class
0
Will any other part of the body enter the RAB
No
Arc Flash Risk Assessment
Incident Energy
24.9 cal cal/cm2
Arc Flash Boundary
120 inches
Working Distance
18 inches
Arc Flash PPE Level
3
Incident Energy Reduction Measures
0
Capacitor Hazards
Capacitor Bus Voltage
None
Capacitor Total Stored Energy (Joules)
None
Discharge Wait Time (Minutes)
N/A
Emergency Response Plan
Nearest Landline Location
Hall way
Emergency Number to Call
7911
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
Main entrance
Fire Extinguisher Location
Hall way
Contact Release Method Available and Tested
Voltage gloves
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None
Error Precursors
Task Demands
Time pressure (in a hurry)
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
None
PPE Inspections
☑ Safety glasses (ANSI Z87) ☑ Arc-rated clothing (flash suit ☑ daily wear) including face shield ☑ balaclava ☑ hood. ☑ Hearing protection ☑ Rubber insulating gloves and leather protectors
Notes / Other
Perform Job Briefing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Detailed Scope of Work
Shock and arc flash hazards for each task
Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
Work area controls (barricades, signs, attendants)