Time / Date: 3/17/2023 11:08:51
|
JSP ID: 763
|
Scope of Work: Perform chiller annual maintenance on 50 Aru 007.
|
|
Work Order: 299244
|
Building:
|
Person in Charge: Justin walker
|
Lead / Supervisor: Delgado, Alex
|
Logged Email: jwwalker@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Juan Garcia
|
|
List Other Participants:
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 25A18A39A 50Aru 007
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Go over job scope. Fill out and submit JSP form. Gather correct ppe required. Perform loto and zvv. Perform required maintenance. Remove loto verify proper supply voltage. Check operations. Return to service. |
Control of Work Area
Minimum Approach Boundary: 87”
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 29.4 calcm2 cal/cm2
|
Arc Flash Boundary: 87”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 4
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: 50 room 6026
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Have HVAC AED here at location
|
Fire Extinguisher Location: 50 mechanical room ( here at location)
|
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
No current error precursors. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |