Time / Date: 3/21/2023 8:16:25
JSP ID: 769
Scope of Work: Replace Defective Dent Meter
Work Order: N/A
Building:
Person in Charge: Ernie Jew
Lead / Supervisor: Grounds, Jeff
Logged Email: jtgrounds@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Standby Person
Second Person Identified: Jeff Grounds
List Other Participants:
Affected Persons Notified: Yes
Switching: Non-Hazardous Switching
Panel / Equipment ID: T-UE617A DS Panel Disconnect
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Notify affected personnel Perform Job Briefing Switch off panel UE617A at local disconnect T-UE617 DS Apply LOTO Perform ZVV at Dent Meter Replace Meter Perform re-energization briefing Notify affected personnel Remove LOTO Close local disconnect and re-energize panel UE617A Verify meter is operational End of job

Control of Work Area

Minimum Approach Boundary: 42"
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 0.39 cal/cm2
Arc Flash Boundary: 8.9"
Working Distance: 18 inches
Arc Flash PPE Level: Minimum PPE for Electrical Work
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Jeff's office container
Emergency Number to Call: 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: 3rd floor adjacent to men's restroom
Fire Extinguisher Location: inside UPS room by double doors
Contact release method available and tested: Rescue hook, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

None

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov