Time / Date: 3/21/2023 8:52:35
|
JSP ID: 771
|
Scope of Work: Switching Support for PMTs
|
|
Work Order: W0315386
|
Building:
|
Person in Charge: Joseph Colmenares
|
Lead / Supervisor: Hendrick, Jeffery
|
Logged Email: josephpica@yahoo.com
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Joseph Pica
|
|
List Other Participants: PMTs
|
|
Affected Persons Notified: Yes
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 06 AHU 014 VFD via Panel 304A4Abkr9
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Permission Verification Stop B06 AHU 14 at VFD Secure VFD Lock VFD handle Confirm AHU Mechanically Safe PMTs Lock On Wait for Maintenance Completion Locks Removed Clear Area Switch Back Restore to Normal Check Operation |
Control of Work Area
Minimum Approach Boundary: 52”
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: No Shock Hazard Present
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 6.9cal cal/cm2
|
Arc Flash Boundary: 52”
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): None
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: Elevator Hallway
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Crew Carry
|
Fire Extinguisher Location: Next Room at MCC
|
Contact release method available and tested: Upstream breaker or switch, Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Noisy environment, Mechanical Room |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Maintain Consistent Communication Use Verbatim Repeat Back |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles |
Notes / Other
Breaker feed Panel has 2011 Arc Flash Data
No Provision for Current Survey available on site
No Arc Flash Label at Local VFD or Local Disconnect
Work Performed prior to office support personnel arriving/ answering phones
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |