Time / Date: 3/22/2023 7:44:24
JSP ID: 775
Scope of Work: Contractors to remove receptacles and lighting in building rooms
Work Order: W0317492
Building:
Person in Charge: JColmenares@lbl.gov
Lead / Supervisor: Hendrick, Jeffery
Logged Email: jcolmenares@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Pica
List Other Participants: Reynolds TKK Eric
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 35a1a
System Information Review: Single Line Drawing, Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Complex LOTO w/ RI
Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Brief Lower settings at bank 35 LOTO ZVV

Control of Work Area

Minimum Approach Boundary: 50 inch
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 120/208 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 7.58 after TSD Adjustment at bank 35 cal/cm2
Arc Flash Boundary: 50 inch
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage:
Capacitor total stored energy (joules):
Discharge wait time (minutes):

Emergency Response Plan

Nearest Landline Location: Cell
Emergency Number to Call: 7911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: On sote
Fire Extinguisher Location: Hall way
Contact release method available and tested: Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Nonr

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

None

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov