Time / Date: 10/12/2022 7:58:13
JSP ID: 78
Scope of Work: Switch circuit 2 panel 72c ZVV Panel 72C2A for contractor replace 70amp breaker w/150A remove 60A breaker replace w/80A Breaker remove and replace disconnect switch feeding transformer 72C2A-16 remove and replace disconnect switch feeding 72C2A-22
Work Order: 299209
Building:
Person in Charge: Christopher Nelson
Lead / Supervisor: Secheck, Stephen
Logged Email: cnelson@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Alex lopez
List Other Participants: Alex Lopez
Affected Persons Notified:
Switching: Hazardous Switching
Panel / Equipment ID: 72C and 72C2A
System Information Review: LP 4694
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Control of Work Area

Minimum Approach Boundary: 58 inches
Barricade Tape / Attendant: Attendant

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 10 cal/cm2 cal/cm2
Arc Flash Boundary: 58 inches
Working Distance: 18 inches
Arc Flash PPE Level: 2
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: NA
Capacitor total stored energy (joules): NA
Discharge wait time (minutes): NA

Emergency Response Plan

Nearest Landline Location: Room 105 A
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Opposite end of building
Fire Extinguisher Location: At every exit point
Contact release method available and tested: Upstream breaker or switch

Environmental Conditions

Does the environment present additional hazards that should be addressed?

None

Error Precursors

Task Demands: Time pressure (in a hurry)
Work Environment: Distractions/interruptions
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

Reviewed

PPE Inspections

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov