Time / Date: 10/12/2022 7:58:13
|
JSP ID: 78
|
Scope of Work: Switch circuit 2 panel 72c ZVV Panel 72C2A for contractor replace 70amp breaker w/150A remove 60A breaker replace w/80A Breaker remove and replace disconnect switch feeding transformer 72C2A-16 remove and replace disconnect switch feeding 72C2A-22
|
|
Work Order: 299209
|
Building:
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Safety Watch
|
|
Second Person Identified: Alex lopez
|
|
List Other Participants: Alex Lopez
|
|
Affected Persons Notified:
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 72C and 72C2A
|
System Information Review: LP 4694
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
|
Control of Work Area
Minimum Approach Boundary: 58 inches
|
Barricade Tape / Attendant: Attendant
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 10 cal/cm2 cal/cm2
|
Arc Flash Boundary: 58 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: NA
|
Capacitor total stored energy (joules): NA
|
Discharge wait time (minutes): NA
|
Emergency Response Plan
Nearest Landline Location: Room 105 A
|
Emergency Number to Call: 911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Opposite end of building
|
Fire Extinguisher Location: At every exit point
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment: Distractions/interruptions
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Reviewed |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |