Time / Date: 3/24/2023 10:52:21
JSP ID: 789
Scope of Work: Perform scheduled maintenance on 70A ac 011
Work Order: 292134
Building:
Person in Charge: Justin Soilis
Lead / Supervisor: Delgado, Alex
Logged Email: jwwalker@lbl.gov
Division: Facilities
QEW Level: QEW 2
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
Second Person Requirement: Safety Watch
Second Person Identified: Justin walker
List Other Participants: None
Affected Persons Notified: Yes
Switching: Hazardous Switching
Panel / Equipment ID: 420A6A1A-13
System Information Review: Panel Schedules, Arc Flash Labels
Control of Hazardous Energy: Simple LOTO
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair

Sequence of Job Steps

List basic sequence of steps from start to finish.

Go over job scope, fill out and submit JSP, go over safety briefing, put on proper ppe, apply loto and verify zvv. Perform maintenance, remove loto, check voltage, check operations , return to service.

Control of Work Area

Minimum Approach Boundary: 87”
Barricade Tape / Attendant: Warning - Orange

Shock Risk Assessment

System Voltage: 277/480 V ac
Limited Approach Boundary: 42 inches
Restricted Approach Boundary: 12 inches
Will the hands enter the RAB: Yes
Voltage Glove Class: 0
Will any other part of the body enter the RAB: No

Arc Flash Risk Assessment

Incident Energy: 29.1calcm2 cal/cm2
Arc Flash Boundary: 87”
Working Distance: 18 inches
Arc Flash PPE Level: 4
Incident Energy Reduction Measures: 0

Capacitor Hazards

Capacitor Bus Voltage: Na
Capacitor total stored energy (joules): Na
Discharge wait time (minutes): Na

Emergency Response Plan

Nearest Landline Location: 72b room 0102
Emergency Number to Call: 911
Sufficient cell phone signal? Yes
Clear exit path? Yes
AED Location: Have HVAC portable AED in possession
Fire Extinguisher Location: Truck extinguisher in possession
Contact release method available and tested: Upstream breaker or switch, Rescue hook, Voltage gloves

Environmental Conditions

Does the environment present additional hazards that should be addressed?

Insufficient/cramped/awkward space, Noisy environment

Error Precursors

Task Demands:
Work Environment:
Individual Capabilities:
Human Nature:
Error Precursor Mitigations:

No current error precursors. Technicians have performed this task and are comfortable

PPE Inspections

Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit,
daily wear) including face shield,
balaclava,
hood.,
Hearing protection,
Rubber insulating gloves and leather protectors,
Non-melting footwear that fully covers the feet,
Removal of conductive articles,
Insulated tools,
Multimeter and other electrical test instruments

Notes / Other

Perform Job Breifing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan


Rev 2023.08.22.1
Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov