| 
				 
					Time / Date: 3/28/2023 6:23:44				 				
				 | 
				
				 
					JSP ID: 802				 
				 | 
				
| 
				 
					Scope of Work: Remove jumpers so water jet at building 77 will not operate while doors are open				 				
				 | 
				|
| 
				 
					Work Order: W0296440				 				
				 | 
				
				 
					Building: 				 				
				 | 							
				
| 
				 
					Person in Charge: AndrewSouthward 				 				
				 | 
				
				 
					Lead / Supervisor: Cameron, Benjamin				 
				 | 
				
| 
				 
					Logged Email: amsouthward@lbl.gov				 				
				 | 
				
				 
					Division: Facilities				 				
				 | 
				
| 
				 
					QEW Level: QEW 2				 				
				 | 
				
				 | 
				
| 
				 
					Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification				 				
				 | 
				|
| 
				 
					Second Person Requirement: Standby Person				 				
				 | 
				|
| 
				 
					Second Person Identified: Ben Cameron 				 				
				 | 
				|
| 
				 
					List Other Participants: 				 				
				 | 
				|
| 
				 
					Affected Persons Notified: Yes				 				
				 | 
				|
| 
				 
					Switching: Non-Hazardous Switching				 				
				 | 
				
				 
					Panel / Equipment ID: 72C2A-16				 
				 | 
				
| 
				 
					System Information Review: Arc Flash Labels				 				
				 | 
				|
| 
				 
					Control of Hazardous Energy: Simple LOTO				 				
				 | 
				|
| 
				 
					Equipment Condition: Properly installed, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair				 				
				 | 
				|
Sequence of Job Steps
| 
				 
					List basic sequence of steps from start to finish. 				
				Perform simple LOTO, ZVV control cabinet, remove designated jumpers, release LOTO and test  | 
				
Control of Work Area
| 
				 
					Minimum Approach Boundary: 42 inches 				 				
				 | 
				
| 
				 
					Barricade Tape / Attendant: 				 
				 | 
				
Shock Risk Assessment
| 
				 
					System Voltage: 277/480 V ac				 				
				 | 
				
| 
				 
					Limited Approach Boundary: 42 inches				 				
				 | 
				
| 
				 
					Restricted Approach Boundary: 12 inches				 				
				 | 
				
| 
				 
					Will the hands enter the RAB: Yes				 				
				 | 
				
| 
				 
					Voltage Glove Class: 0				 				
				 | 
				
| 
				 
					Will any other part of the body enter the RAB: No				 				
				 | 
				
Arc Flash Risk Assessment
| 
				 
					Incident Energy: 0.33 cal/cm2
				 				
				 | 
				
| 
				 
					Arc Flash Boundary: 10 inches 				 				
				 | 
				
| 
				 
					Working Distance: 18 inches				 				
				 | 
				
| 
				 
					Arc Flash PPE Level: 1				 				
				 | 
				
| 
				 
					Incident Energy Reduction Measures: 0				 				
				 | 
				
Capacitor Hazards
| 
				 
					Capacitor Bus Voltage: Na 				 				
				 | 
				
| 
				 
					Capacitor total stored energy (joules): Na 				 				
				 | 
				
| 
				 
					Discharge wait time (minutes): Na				 				
				 | 
				
Emergency Response Plan
| 
				 
					Nearest Landline Location: 77				 				
				 | 
				
| 
				 
					Emergency Number to Call: 911				 				
				 | 
				
| 
				 
					Sufficient cell phone signal? Yes				 				
				 | 
				
| 
				 
					Clear exit path? Yes				 				
				 | 
				
| 
				 
					AED Location: On hand 				 				
				 | 
				
| 
				 
					Fire Extinguisher Location: 77-105				 				
				 | 
				
| 
				 
					Contact release method available and tested: Upstream breaker or switch, Voltage gloves				 				
				 | 
				
Environmental Conditions
| 
				 
					Does the environment present additional hazards that should be addressed? 				
				Lookalike equipment  | 
				
Error Precursors
| 
				 
					Task Demands: 				 				
				 | 
				
| 
				 
					Work Environment: 				 				
				 | 
				
| 
				 
					Individual Capabilities: 				 				
				 | 
				
| 
				 
					Human Nature: 				 				
				 | 
				
| 
				 
					Error Precursor Mitigations:  				
				None  | 
				
PPE Inspections
| 
				 
					Safety glasses (ANSI Z87), 				
				Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Hearing protection, Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments  | 
				
Notes / Other
| 
				 | 
				
Perform Job Breifing
| 
				 
					PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.  				
				A Job Briefing at a minimum must include: 
 Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov  | 
				
