Time / Date: 10/13/2022 12:32:43
|
JSP ID: 89
|
Scope of Work: Test low voltage lighting relay panel
|
|
Work Order: 299670
|
Building:
|
Person in Charge: Christopher Nelson
|
Lead / Supervisor: Keusch, Justen
|
Logged Email: cnelson@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 2 - Energized Diagnostics, Testing and Troubleshooting, Visual Inspection
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Alex lopez
|
|
List Other Participants: Alex Lopez
|
|
Affected Persons Notified:
|
Switching: No Switching Required
|
Panel / Equipment ID: Watt Stopper panel fed from 47A3A63A circuit 14
|
System Information Review: Panel Schedules
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Donning proper PPE, inspect PPE, remove Lighting panel cover with inspected and tested meter check relays for incoming and outgoing voltages. Replace bad relay if found bad. |
Control of Work Area
Minimum Approach Boundary: 42
|
Barricade Tape / Attendant: Warning
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: 0.24 cal/cm2 cal/cm2
|
Arc Flash Boundary: 7 inches
|
Working Distance: 18 inches
|
Arc Flash PPE Level: 2
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: Na
|
Capacitor total stored energy (joules): Na
|
Discharge wait time (minutes): Na
|
Emergency Response Plan
Nearest Landline Location: Room 209
|
Emergency Number to Call:
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location:
|
Fire Extinguisher Location: Outside room 223
|
Contact release method available and tested: Upstream breaker or switch
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands: Time pressure (in a hurry)
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
Alex has to leave early we will not get in a hurry. We can always come back tomorrow |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |