Time / Date: 10/14/2022 10:28:17
|
JSP ID: 91
|
Scope of Work: M/M troubleshoot and repair lights in lab 74-0299
|
|
Work Order: 299670
|
Building:
|
Person in Charge: Shane Miller
|
Lead / Supervisor: Secheck, Stephen
|
Logged Email: spmiller@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Nick Gripe
|
|
List Other Participants: Alex Lopez, Chris Neilson, Nick Gripe
|
|
Affected Persons Notified:
|
Switching: Non-Hazardous Switching
|
Panel / Equipment ID: 474A3A63A ckt 8,10,12,16.
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Complex LOTO (requires LP, CLP, FLP)
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Dawn the proper PPE,LOTO @panel474A3A63A ckt 8,10,12,16 under FLP-230.ZVV at switch box. Test wiring to locate abandoned switch leg to several lights that where out. Confirm switch leg and tie to existing switch. Close up switch box. Release LOTO and test switch |
Control of Work Area
Minimum Approach Boundary:
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120/208 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: Avoid contact
|
Will the hands enter the RAB: No
|
Voltage Glove Class: 00
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .24 cal cal/cm2
|
Arc Flash Boundary: 7”
|
Working Distance: Avoid contact
|
Arc Flash PPE Level: 1
|
Incident Energy Reduction Measures: 00
|
Capacitor Hazards
Capacitor Bus Voltage:
|
Capacitor total stored energy (joules):
|
Discharge wait time (minutes):
|
Emergency Response Plan
Nearest Landline Location: Desk outside electrical room
|
Emergency Number to Call: X6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On cart
|
Fire Extinguisher Location: Hallway
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
None |
PPE Inspections
|
Notes / Other
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |