Time / Date: 4/25/2023 12:21:04
|
JSP ID: 938
|
Scope of Work: Troubleshoot non operating 480VAC controller in B77-156 UHV cleaning room.
|
|
Work Order:
|
Building:
|
Person in Charge: Jaime Romo
|
Lead / Supervisor: Other
|
Logged Email: jromo@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 2
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition, Mode 1 - LOTO & Zero Voltage Verification
|
|
Second Person Requirement: Standby Person
|
|
Second Person Identified: Pardeep Chahal
|
|
List Other Participants: N/A
|
|
Affected Persons Notified: N/A
|
Switching: Hazardous Switching
|
Panel / Equipment ID: 72A9A11A
|
System Information Review: Panel Schedules, Arc Flash Labels
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed, Properly maintained, All doors and covers closed and fully latched, No signs of impending failure, Not energizing equipment for the first time, or after electrical repair
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
1) Open panel door at panel #72A9A11A. Switch off CB's 1,3,5 (switching guide #9) and perform LOTO (LOTO card) Mode 1. 2) Wear appropriate PPE and open 480VAC control panel door. 3) Visually inspect the electrical items in the control box and ZVV (pocket guide A.4) Mode 1, verify electrically safe condition (Mode 0) Check fuse(s) etc. in 480VAC control enclosure. 5) Replace fuse(s) close 480VAC control enclosure and remove LOTO (LOTO card) 6) Check if the 480VAC control panel is working. |
Control of Work Area
Minimum Approach Boundary: 42 inches
|
Barricade Tape / Attendant: Warning - Orange
|
Shock Risk Assessment
System Voltage: 277/480 V ac
|
Limited Approach Boundary: 42 inches
|
Restricted Approach Boundary: 12 inches
|
Will the hands enter the RAB: Yes
|
Voltage Glove Class: 0
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: .98 cal/cm2 cal/cm2
|
Arc Flash Boundary: N/A
|
Working Distance: 18 inches
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: 0
|
Capacitor Hazards
Capacitor Bus Voltage: N/A
|
Capacitor total stored energy (joules): N/A
|
Discharge wait time (minutes): N/A
|
Emergency Response Plan
Nearest Landline Location: In the office
|
Emergency Number to Call: 510-486-7911
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: Machine shop
|
Fire Extinguisher Location: Room 156
|
Contact release method available and tested: Voltage gloves
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
Insufficient/cramped/awkward space, Noisy environment |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities: Unfamiliar with, or first time performing task
|
Human Nature:
|
Error Precursor Mitigations:
Take it slow and one step at a time. Follow the QEW 2 pocket guide. |
PPE Inspections
Safety glasses (ANSI Z87),
Arc-rated clothing (flash suit, daily wear) including face shield, balaclava, hood., Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Removal of conductive articles, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
This JSP is not being used or followed to perform work. This particular one is for training purposes only. J Romo 04/25/2023
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include:
Rev 2023.08.22.1 Form Content and Feedback Contact: Michael Rose -- mvr@lbl.gov |