Time / Date: 5/1/2023 6:33:36
|
JSP ID: 956
|
Scope of Work: Customer requested QEW support to provide LOTO (120Vac) to TSS technician (installation of UV light bulb inside fume hood).
|
|
Work Order: n/a
|
Building:
|
Person in Charge: Felipe Sanchez
|
Lead / Supervisor: Other
|
Logged Email: fbsanchez@lbl.gov
|
Division: Facilities
|
QEW Level: QEW 1
|
|
Modes of Work: Mode 0 - Electrically Safe Work Condition
|
|
Second Person Requirement: Not Required
|
|
Second Person Identified: n/a
|
|
List Other Participants: n/a
|
|
Affected Persons Notified: N/A
|
Switching: No Switching Required
|
Panel / Equipment ID: n/a
|
System Information Review:
|
|
Control of Hazardous Energy: Simple LOTO
|
|
Equipment Condition: Properly installed
|
Sequence of Job Steps
List basic sequence of steps from start to finish.
Informed customer and TSS technician the LOTO procedure needed for technician to accomplish his work. Checked outlet voltage (117.8Vac). I installed the LOTO equipment as per Berkeley Lab guideline. Advised TSS technician to start his work. I asked him if he will be doing wiring work on the main PCB control board. He said his procedure was to convert wires from old 5-wire terminations to a four-wire terminations. Informed him that per LBNL guideline, I will assume responsibility as a QEW to do the wiring job. After terminating the wires ( using wire-nuts and terminal lugs), I also help him troubleshoot the equipment. I removed the LOTO equipment. I let technician did his test. After a couple of test procedures, the UV light came back up. |
Control of Work Area
Minimum Approach Boundary: n/a
|
Barricade Tape / Attendant:
|
Shock Risk Assessment
System Voltage: 120 Vac
|
Limited Approach Boundary: None
|
Restricted Approach Boundary: None
|
Will the hands enter the RAB: No
|
Voltage Glove Class: Not Required
|
Will any other part of the body enter the RAB: No
|
Arc Flash Risk Assessment
Incident Energy: n/a cal/cm2
|
Arc Flash Boundary: n/a
|
Working Distance: No Arc Flash Hazard Present
|
Arc Flash PPE Level: Minimum PPE for Electrical Work
|
Incident Energy Reduction Measures: Not Required
|
Capacitor Hazards
Capacitor Bus Voltage: n/a
|
Capacitor total stored energy (joules): n/a
|
Discharge wait time (minutes): n/a
|
Emergency Response Plan
Nearest Landline Location: No landline available inside lab. room.
|
Emergency Number to Call: (510) 486-6999
|
Sufficient cell phone signal? Yes
|
Clear exit path? Yes
|
AED Location: On-site
|
Fire Extinguisher Location: yes
|
Contact release method available and tested:
|
Environmental Conditions
Does the environment present additional hazards that should be addressed?
None |
Error Precursors
Task Demands:
|
Work Environment:
|
Individual Capabilities:
|
Human Nature:
|
Error Precursor Mitigations:
n/a |
PPE Inspections
Safety glasses (ANSI Z87),
Rubber insulating gloves and leather protectors, Non-melting footwear that fully covers the feet, Insulated tools, Multimeter and other electrical test instruments |
Notes / Other
n/a
|
Perform Job Breifing
PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.
A Job Briefing at a minimum must include: