List basic sequence of steps from start to finish
Informed customer and TSS technician the LOTO procedure needed for technician to accomplish his work. Checked outlet voltage (117.8Vac). I installed the LOTO equipment as per Berkeley Lab guideline. Advised TSS technician to start his work. I asked him if he will be doing wiring work on the main PCB control board. He said his procedure was to convert wires from old 5-wire terminations to a four-wire terminations. Informed him that per LBNL guideline, I will assume responsibility as a QEW to do the wiring job. After terminating the wires ( using wire-nuts and terminal lugs), I also help him troubleshoot the equipment. I removed the LOTO equipment. I let technician did his test. After a couple of test procedures, the UV light came back up.