QEW 1 / 2 / 3 Job Safety Plan

Electrical Safety
Back to Index
Time / Date: 5/1/2023 6:33:36
JSP ID: 956
Scope of Work: Customer requested QEW support to provide LOTO (120Vac) to TSS technician (installation of UV light bulb inside fume hood).

General Information

Work Order
n/a
Building
-
Person in Charge
Felipe Sanchez
Lead / Supervisor
Other
Logged Email
fbsanchez@lbl.gov
Division
Facilities

Work Planning

Modes of Work
☑ Mode 0 - Electrically Safe Work Condition
QEW Level
QEW 1
Second Person Requirement
Not Required
Second Person Identified
n/a
Other Participants
n/a
Affected Persons Notified
N/A

System / Equipment

Switching
No Switching Required
Panel / Equipment ID
n/a
System Information Review
Control of Hazardous Energy
Simple LOTO
Equipment Condition
☑ Properly installed

Sequence of Job Steps

List basic sequence of steps from start to finish
Informed customer and TSS technician the LOTO procedure needed for technician to accomplish his work. Checked outlet voltage (117.8Vac). I installed the LOTO equipment as per Berkeley Lab guideline. Advised TSS technician to start his work. I asked him if he will be doing wiring work on the main PCB control board. He said his procedure was to convert wires from old 5-wire terminations to a four-wire terminations. Informed him that per LBNL guideline, I will assume responsibility as a QEW to do the wiring job. After terminating the wires ( using wire-nuts and terminal lugs), I also help him troubleshoot the equipment. I removed the LOTO equipment. I let technician did his test. After a couple of test procedures, the UV light came back up.

Control of Work Area

Minimum Approach Boundary
n/a
Barricade Tape / Attendant

Shock Risk Assessment

System Voltage
120 Vac
Limited Approach Boundary
None
Restricted Approach Boundary
None
Will the hands enter the RAB
No
Voltage Glove Class
Not Required
Will any other part of the body enter the RAB
No

Arc Flash Risk Assessment

Incident Energy
n/a cal/cm2
Arc Flash Boundary
n/a
Working Distance
No Arc Flash Hazard Present
Arc Flash PPE Level
Minimum PPE for Electrical Work
Incident Energy Reduction Measures
Not Required

Capacitor Hazards

Capacitor Bus Voltage
n/a
Capacitor Total Stored Energy (Joules)
n/a
Discharge Wait Time (Minutes)
n/a

Emergency Response Plan

Nearest Landline Location
No landline available inside lab. room.
Emergency Number to Call
(510) 486-6999
Sufficient Cell Phone Signal
Yes
Clear Exit Path
Yes
AED Location
On-site
Fire Extinguisher Location
yes
Contact Release Method Available and Tested

Environmental Conditions

Does the environment present additional hazards that should be addressed?
None

Error Precursors

Task Demands
Work Environment
Individual Capabilities
Human Nature
Error Precursor Mitigations
n/a

PPE Inspections

☑ Safety glasses (ANSI Z87)
☑ Rubber insulating gloves and leather protectors
☑ Non-melting footwear that fully covers the feet
☑ Insulated tools
☑ Multimeter and other electrical test instruments

Notes / Other

n/a

Perform Job Briefing

PIC Conducts the Job Briefing. Cover all the contents of the Job Safety Plan.

A Job Briefing at a minimum must include:
  1. Detailed Scope of Work
  2. Shock and arc flash hazards for each task
  3. Controls to mitigate the hazards (procedures, precautions, energy source controls, PPE requirements)
  4. Work area controls (barricades, signs, attendants)
  5. Emergency Response Plan