1000 Latest Entries from 3758 Total Records
Date | JSP ID | PIC | Supervisor | Division | Panel / Equipment ID | Scope of Work |
---|---|---|---|---|---|---|
5/23/2025 7:26:08 | 3758 | Larry Antles | Delgado, Alex | Facilities | 196A1A1A1A22A/71Q AC 001 | PM 71Q AC 001 |
5/22/2025 12:32:44 | 3757 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A9A | Perform PM on 59-VFD-005 |
5/22/2025 9:09:56 | 3756 | Alma Armenta | Cameron, Benjamin | Facilities | E590A7A | Perform PM for 59-BL-003 & 59-BL-004 |
5/22/2025 8:14:01 | 3755 | Alma Armenta | Cameron, Benjamin | Facilities | 516A9A1A | Perform PM for BL-001 & BL-002 |
5/22/2025 7:45:52 | 3754 | Colmenares | Cameron, Benjamin | Facilities | 357A1A | Test emergency generator for transfer |
5/22/2025 7:00:11 | 3753 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A5A | Perform PM for 59-VFD-30 and 59-VFD-31 |
5/21/2025 12:22:05 | 3752 | Colmenares | Cameron, Benjamin | Facilities | 596A1A9A | VFD PM |
5/21/2025 10:10:09 | 3751 | Gerald fowler | Delgado, Alex | Facilities | 550A1A/67AARU003 | Troubleshooting refrigerant leak |
5/21/2025 8:33:16 | 3750 | Colmenares | Cameron, Benjamin | Facilities | 72-GP-005 disc | GP five pump motor replacement |
5/21/2025 7:06:42 | 3749 | Alma Armenta | Cameron, Benjamin | Facilities | E700A1A4A9A Sec 2 / E720A Sec 2 | Establish LP-5710 |
5/20/2025 14:05:59 | 3748 | Colmenares | Cameron, Benjamin | Facilities | 44A1A | Replaced blower motor fan |
5/20/2025 9:09:06 | 3747 | AndrewSouthward | Cameron, Benjamin | Facilities | 147A1B | Establish LP-5747 |
5/20/2025 7:03:58 | 3746 | Andrew Southward | Cameron, Benjamin | Facilities | 596A1A4A | PM VFD-14 |
5/19/2025 8:51:03 | 3745 | Colmenares | Cameron, Benjamin | Facilities | Local BL05 Switch | BL 05 motor replacement |
5/16/2025 8:12:46 | 3744 | Alma Armenta | Cameron, Benjamin | Facilities | 229A3B | Install Data Logger in Panel |
5/16/2025 7:37:34 | 3743 | Justin solis | Delgado, Alex | Facilities | 513A7A11B1B/55AC043 | Troubleshooting unit ac |
5/15/2025 12:27:05 | 3742 | Shane Miller | Secheck, Stephen | Facilities | 217A1A3A | Loto, ZVV, investigate existing branch circuit wiring and install new raceways and jboxes for cubicle rearrangement. Pull in new conductors, inspect. |
5/15/2025 12:14:03 | 3741 | Colmenares | Hendrick, Jeffery | Facilities | 267A | Troubleshoot sump controller |
5/15/2025 10:36:43 | 3740 | Alma Armenta | Cameron, Benjamin | Facilities | 72A2A16A | Remove Data Logger in Panel |
5/15/2025 9:08:34 | 3739 | Alma Armenta | Cameron, Benjamin | Facilities | 47A3A34A40A | Install Data Logger in Panel |
5/15/2025 7:56:03 | 3738 | Alma Armenta | Cameron, Benjamin | Facilities | EM357A1A7A1AC3A / E570A | Remove Data Logger in Panel |
5/14/2025 13:07:40 | 3737 | Ben | Hendrick, Jeffery | Facilities | EMM551A4A1A15A | Take pictures of the elevators conductors entering the MCC |
5/14/2025 12:41:04 | 3736 | Alma Armenta | Cameron, Benjamin | Facilities | E657A | Install GFCI cover on roof GFCI |
5/14/2025 12:14:40 | 3735 | Alma Armenta | Cameron, Benjamin | Facilities | 653A | Install GFCI cover in outside GFCI |
5/14/2025 10:25:05 | 3734 | J Colmenares | Cameron, Benjamin | Facilities | MCC 51A8A | Switching Support |
5/14/2025 9:44:19 | 3733 | Brendan Ford | Other | Other | Station A 1400 Helium Refrigerator | LOTO the 1400 Helium Refrigerator and inspect/repair. |
5/14/2025 8:38:32 | 3732 | Justin solis | Delgado, Alex | Facilities | 253B1A33A/46AC050 | Preventive maintenance |
5/14/2025 8:14:54 | 3731 | Shane Miller | Secheck, Stephen | Facilities | 66A2A14A | Dawn the proper PPE and set up barricades, Loto @panel 66A2A14A ckt9, hang red locks. ZVV at bank 96 and panel 96A. Check connection/terminals. Mode 2 release loto and live voltage reading from each phase to neutral and ground at bank 96. Close and secure bank 96. Release LOTO |
5/14/2025 7:27:09 | 3730 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A | VFD Preventive maintenance |
5/14/2025 7:11:15 | 3729 | Alma Armenta | Cameron, Benjamin | Facilities | DP EPP125 / 671A12A | Establish LP-5697 |
5/12/2025 13:34:04 | 3728 | Colmenares | Cameron, Benjamin | Facilities | N218A2A5D | Switching support for PMT |
5/12/2025 11:04:10 | 3727 | Alma Armenta | Cameron, Benjamin | Facilities | 279A | Install Data Logger in Panel |
5/12/2025 10:30:01 | 3726 | Alma Armenta | Cameron, Benjamin | Facilities | 285A33A | Install Data Logger in Panel |
5/12/2025 9:13:42 | 3725 | Alma Armenta | Cameron, Benjamin | Facilities | DP E671A11A | Reset lighting inverter circuit in EU671A11A2A |
5/12/2025 8:47:36 | 3724 | Gerald Fowler | Delgado, Alex | Facilities | 49A2A6A/46-AC-022 | Troubleshoot 46-AC-022 not cooling |
5/12/2025 8:33:38 | 3723 | Larry Antles | Delgado, Alex | Facilities | 38A1A/AHU 030 | PM AHU 030 |
5/12/2025 8:28:13 | 3722 | Larry Antles | Delgado, Alex | Facilities | 38A1A/50B AHU 029 | PM AHU 029 |
5/12/2025 8:03:55 | 3721 | Greg Neidiger | Combs, Everett | Facilities | 727A39A | Replace stripped bussing of B phase circuit 9. Ground A0804, A0805, A0806, A0807 to building steel by bonding bare ground to panelboard enclosure using a through-bolt Kerney. |
5/9/2025 13:00:35 | 3720 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-013 | Pm for 50A-AHU-010 |
5/9/2025 12:52:32 | 3719 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-012 | Pm for 50A-AHU-012 |
5/9/2025 11:02:10 | 3718 | Gerald Fowler | Delgado, Alex | Facilities | 147A1A/46-AC-010 | PM for 46-AC-010 |
5/9/2025 10:55:44 | 3717 | Gerald Fowler | Delgado, Alex | Facilities | 147A1A/46-AC-009 | Pm for 46-AC-009 |
5/9/2025 7:58:02 | 3716 | Christopher Nelson | Combs, Everett | Facilities | 342A1A7A4A | ZVV Panel we Switched and LOTO to Remove A circuit in the room of this panel demo of circuit 5 receptacle |
5/9/2025 7:30:45 | 3715 | Capeto | Delgado, Alex | Facilities | M38A6A/ 50B AHU 024 | PM |
5/9/2025 7:28:38 | 3714 | Christopher Nelson | Combs, Everett | Facilities | 342A1A7A | Switch Panel 342A1A7A circuit 4 to ZVV panel 342A1A7A4A |
5/8/2025 13:16:34 | 3713 | Shane Miller | Secheck, Stephen | Facilities | 217A3A5A10A ckt 15 | Connect whip to new table saw |
5/8/2025 12:23:51 | 3712 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A11B1A/55-AC-041 | Pm on 55-AC-041 |
5/8/2025 7:40:11 | 3711 | Alma Armenta | Cameron, Benjamin | Facilities | E191A1A2A | Replace motor for 66-BL-65 |
5/7/2025 9:46:17 | 3710 | Colmenares | Cameron, Benjamin | Facilities | 70 MCC003 | Switching support for vacuum pumps |
5/7/2025 8:30:49 | 3709 | Colmenares | Cameron, Benjamin | Facilities | 217A3A1A | Replace blower one motor on roof |
5/7/2025 7:19:18 | 3708 | Mayumi Taylor | Keusch, Justen | Facilities | Pnl 279A | Assemble so cable with cord caps. |
5/6/2025 13:33:53 | 3707 | Shane Miller | Ramer, Robert | Facilities | EM22A-13 | MM replace receipt. |
5/6/2025 12:26:15 | 3706 | Antonio collado | Delgado, Alex | Facilities | 35a -50a aru 006 | Replacing contractors on aru 006 |
5/6/2025 12:16:03 | 3705 | Balbino Mercadal | Keusch, Justen | Facilities | 235A | Perform Annual PM on emergency lighting |
5/6/2025 9:39:07 | 3704 | Alejandro Lopez | Ramer, Robert | Facilities | 566A9A | Apply simple LOTO and ZVV exterior lighting on third floor mezzanine south side at building 67. |
5/6/2025 6:58:16 | 3703 | Colmenares | Cameron, Benjamin | Facilities | UE 592A Ckt 14 | Provide contractor support for door opener |
5/6/2025 6:45:17 | 3702 | Alma Armenta | Cameron, Benjamin | Facilities | E65A | Remove Data Logger in Panel |
5/5/2025 18:22:20 | 3701 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A2A | Replace emergency lighting fixture |
5/5/2025 13:18:21 | 3700 | Greg Neidiger | Secheck, Stephen | Facilities | 242A-5 | Reset 120V circuit breaker |
5/5/2025 7:37:24 | 3699 | Capeto | Delgado, Alex | Facilities | E536A/ 28 AC 002 | Replace OFM |
5/2/2025 12:44:55 | 3698 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A | Replace emergency lighting fixtures |
5/2/2025 9:53:09 | 3697 | Scott Small | Other | Other | Station B 1430 | Establish electrically safe work condition on Station B 1430 Helium Compressor for contractor work - LOTO Permit # 5721 |
5/1/2025 16:21:56 | 3696 | Ari Harding | Other | Other | N/A | Bench top testing of experimental DC-DC power supply |
5/1/2025 13:30:38 | 3695 | Balbino Mercadal | Keusch, Justen | Facilities | E43A1A4A | Replace emergency lighting fixture. |
5/1/2025 9:25:05 | 3694 | Mayumi Taylor | Keusch, Justen | Facilities | 342a1a19a | Loto,zvv and remove power from bridgepoint drill press, |
5/1/2025 8:54:45 | 3693 | Colmenares | Cameron, Benjamin | Facilities | 635A1A2A | I just set points to vacuum pump one and 2 Mode 2 work |
5/1/2025 8:34:51 | 3692 | Sayee Chea | Keusch, Justen | Facilities | 38A4A2A | Installing additional ballast in each of the 5 light fixtures |
5/1/2025 7:41:54 | 3691 | Jared Tissot | Ramer, Robert | Facilities | E374A1A-2 | Investigate loss of power inside the gate house which provided power for networking. Restore power to breaker that was in the off position likely by being bumped as the panel is in a very low spot. The door of the sub panel is taped open due to 2 loto devices on circuit breakers not allowing the panel door to close. |
4/30/2025 14:19:44 | 3690 | Beau Erwin | Ramer, Robert | Facilities | 559A3A | Demo a few receptacles and remove wire mold |
4/30/2025 8:41:38 | 3689 | Antonio collado | Delgado, Alex | Facilities | 671a9a12a/ 91 ac 002 | Pm on ac 2 at 91 |
4/30/2025 8:27:24 | 3688 | Larry Antles | Delgado, Alex | Facilities | DP671A12A/91 AC 001 | PM AC 001 |
4/30/2025 8:04:58 | 3687 | Colmenares | Cameron, Benjamin | Facilities | 193A1A | Troubleshoot blower 12 |
4/30/2025 7:52:54 | 3686 | Sayee Chea | Keusch, Justen | Facilities | E43A1A | Replacing Bug eye fixture |
4/30/2025 7:48:30 | 3685 | Robert Ralph | Combs, Everett | Facilities | MO box | Install 30 A two pole receptacle in MO box |
4/29/2025 17:59:12 | 3684 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2A3A, | Replace lamps outage rm2275 |
4/29/2025 13:14:42 | 3683 | Egon Hampton | Keusch, Justen | Facilities | 239A | Repace fixtue |
4/29/2025 8:43:52 | 3682 | Colmenares | Cameron, Benjamin | Facilities | 525A | Troubleshoot, grizzly gate, inbound outbound |
4/29/2025 8:33:08 | 3681 | Gerald Fowler | Delgado, Alex | Facilities | 47A3A39A/74-AC-029 | Pm for 74-AAC-029 |
4/29/2025 7:43:43 | 3680 | AndrewSouthward | Cameron, Benjamin | Facilities | 72A7A9A | Replace VFD for AHU-28 |
4/28/2025 12:19:30 | 3679 | Balbino Mercadal | Keusch, Justen | Facilities | 84B | Perform Annual PM on emergency lighting |
4/28/2025 11:54:41 | 3678 | Balbino Mercadal | Keusch, Justen | Facilities | 696A | Perform Annual PM on emergency lighting |
4/28/2025 10:09:05 | 3677 | Sayee Chea | Keusch, Justen | Facilities | 566A3A | Will be replacing LED light fixtures |
4/28/2025 9:10:31 | 3676 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A4A | Troubleshoot and repair backwards spinning fan for AHU-17 |
4/28/2025 9:06:05 | 3675 | Alejandro Lopez | Ramer, Robert | Facilities | 555A15A4A | Air gap LIBRA microscope in room 1209A at building 67. |
4/28/2025 8:58:14 | 3674 | Alejandro Lopez | Ramer, Robert | Facilities | 72A5A | Assist with LP-5635 at building 77 room 0141. |
4/28/2025 7:54:16 | 3673 | Robert Ralph | Combs, Everett | Facilities | 319A | Performing switching on several circuit breakers, establishing LOTO, ZVV at equipment racks, trace cables, release LOTO , close circuit breakers. |
4/28/2025 7:38:06 | 3672 | Capeto | Delgado, Alex | Facilities | 546A/ 15 AHU 008 | PM |
4/28/2025 14:01:57 | 3671 | Mayumi Taylor | Keusch, Justen | ALS | 319A | Cable tracing in sector 7 |
4/28/2025 6:44:02 | 3670 | Andrew Southward | Cameron, Benjamin | Facilities | M218A1A | Disconnect GP-139 |
4/25/2025 12:17:08 | 3669 | Mayumi Taylor | Keusch, Justen | ALS | 347a28a | Add receptacle on 2nd floor lobby wall near break room. |
4/25/2025 6:41:34 | 3668 | Balbino Mercadal | Keusch, Justen | Facilities | 25A12A | Replace ballast as needed |
4/24/2025 13:22:03 | 3667 | Erik Line | Keusch, Justen | Facilities | 80A3A1A | Establish LOTO for base shack vacuum pump PM. |
4/24/2025 12:01:58 | 3666 | Andrew Southward | Cameron, Benjamin | Facilities | EM551A4A1A15A | Take pictures of circuit breaker |
4/24/2025 11:29:22 | 3665 | Larry Antles | Delgado, Alex | Facilities | 513A7A5A/55 AC 24 | remove and replace econimizer |
4/24/2025 7:50:47 | 3664 | Colmenares | Cameron, Benjamin | Facilities | 357A1A | Test emergency generator |
4/24/2025 7:37:41 | 3663 | Alma Armenta | Cameron, Benjamin | Facilities | E31A18A3F | Replace motor/pump for GP-029 |
4/23/2025 13:24:17 | 3662 | Balbino Mercadal | Keusch, Justen | Facilities | 30A3A5E | Replace Exit Sign |
4/23/2025 11:41:01 | 3661 | AndrewSouthward | Cameron, Benjamin | Facilities | M460A1A | Inspect conductors within M460A1A |
4/23/2025 8:39:38 | 3660 | Pica | Cameron, Benjamin | Facilities | 66A1A | Install overhead motor |
4/23/2025 7:32:14 | 3659 | Colmenares | Cameron, Benjamin | Facilities | 309A switchgear | Support Luis Soto RI by wrecking out and locking out breaker for ARU-4 |
4/22/2025 9:58:49 | 3658 | Larry Antles | Delgado, Alex | Facilities | DP 671A9A/ 91 AC 004 | PM AC 004 |
4/22/2025 7:20:57 | 3657 | Mayumi Taylor | Keusch, Justen | Facilities | 579a | Turn on breaker 1,3,5 and c10 |
4/22/2025 7:11:26 | 3656 | Justin walker | Delgado, Alex | Facilities | E35B15A1A/50AAC010 | Preventive maintenance |
4/22/2025 7:06:19 | 3655 | Mayumi Taylor | Keusch, Justen | Facilities | pnl305a4a2a | Turn circuit 1 in pnl305a4a2a on which feeds pnl 579a |
4/22/2025 14:12:40 | 3654 | Alma Armenta | Cameron, Benjamin | Facilities | E650A5A1A2A | Replace VFD for BL-23 |
4/21/2025 12:03:00 | 3653 | Balbino Mercadal | Keusch, Justen | Facilities | 263A2A | Replace emergency lighting fixture |
4/21/2025 11:52:05 | 3652 | Larry Antles | Delgado, Alex | Facilities | 185A/B69 AC 10 | PM AC 10 |
4/21/2025 11:45:48 | 3651 | Justin Solis | Delgado, Alex | Facilities | 217a1a3a/ac-006-69 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/21/2025 9:44:24 | 3650 | Brendan Ford | Other | Other | 80A3A5A9A CB 5 and 1430 Disconnect. | LOTO and electrical troubleshooting of the 1430 compressor PLC module. |
4/21/2025 7:21:23 | 3649 | Larry Antles | Delgado, Alex | Facilities | 25a17a40a/50A AC 28 | PM AC 28 |
4/21/2025 6:48:54 | 3648 | Andrew Southward | Cameron, Benjamin | Facilities | 79A | Install Data Logger in Panel |
4/18/2025 10:50:08 | 3647 | Todd Wood | Other | Other | PP1-8 | Disconnect wiring between heater ring and Heater control boxes. Unmount boxes and return them to LBL |
4/18/2025 6:59:54 | 3646 | AndrewSouthward | Cameron, Benjamin | Facilities | EM460A5A1A9A | LOTO and ZVV bl-2 for motor repair and VFD screen replacement |
4/17/2025 11:17:50 | 3645 | Balbino Mercadal | Keusch, Justen | Facilities | E250A | Replace emergency fixture |
4/17/2025 9:57:45 | 3644 | Colmenares | Cameron, Benjamin | Facilities | E47A2A2A22A | PMT SUPPORT |
4/17/2025 8:32:10 | 3643 | Antonio collado | Delgado, Alex | Facilities | 38a/ 50b aru 007 | Replaced compressor temp module inside compressor electrical housing |
4/16/2025 15:20:18 | 3642 | Todd Wood | Other | Other | Piezo Rack | Place an electrical rack (Piezo Rack) into an electrically safe condition following steps outlined in CLP-413. Rack contains multiple sources of energy including hazardpus capacitors. Remove components from rack and prepare to ship back to LBL from Pinion Flats field site |
4/16/2025 9:12:17 | 3641 | Alejandro Lopez | Ramer, Robert | Facilities | 501A6A | Replace damage power receptacle by room 207B. |
4/16/2025 9:03:29 | 3640 | Colmenares | Cameron, Benjamin | Facilities | 266A33A | Replace blower motor 18 in room 297 |
4/16/2025 8:42:31 | 3639 | Juan juarez | Delgado, Alex | Facilities | M47A3A69A3A/74AC027 | Preventive maintenance |
4/16/2025 7:47:23 | 3638 | Mayumi Taylor | Keusch, Justen | Facilities | 727A39A | Loto |
4/15/2025 13:05:36 | 3637 | Antonio collado | Delgado, Alex | Facilities | M47a3a69a3a/ 74 ac 028 | Pm ac 28 |
4/15/2025 12:39:06 | 3636 | Alma Armenta | Cameron, Benjamin | Facilities | EU671A11A2A | Energize ckt 11 in EU671A11A2A |
4/15/2025 12:03:17 | 3635 | Juan juarez | Delgado, Alex | Facilities | 47A5A9A4A/74BAC001 | Preventive maintenance |
4/15/2025 10:01:46 | 3634 | Juan juares | Delgado, Alex | Facilities | 47A5A9A1A/74AAC001 | Preventive maintenance |
4/15/2025 9:14:45 | 3633 | Alma Armenta | Cameron, Benjamin | Facilities | 650A2A ckt 11 | Provide loto support for fire alarm |
4/15/2025 7:40:00 | 3632 | Alma Armenta | Cameron, Benjamin | Facilities | 637A10A, 635A1A4A31A, 637A, 637A10A | Establish LP-5662, LP-5671, LP-5675 |
4/14/2025 10:19:47 | 3631 | Colmenares | Cameron, Benjamin | Facilities | PNL-003-78 | Adjust compressor start stop settings |
4/14/2025 12:22:09 | 3630 | Robert Ralph | Combs, Everett | Facilities | 319A | Perform switching on 3 pole 208 v Circuit breakers and ZVV at equipment racks fed from circuit breakers being turned off |
4/14/2025 9:34:06 | 3629 | Alma Armenta | Cameron, Benjamin | Facilities | 86-TSW-001/ E570A | Install Data Logger in Panel |
4/14/2025 12:22:43 | 3628 | Mayumi Taylor | Keusch, Justen | ALS | Pnl 319A | Loto and zvv |
4/14/2025 8:06:30 | 3627 | Colmenares | Cameron, Benjamin | Facilities | E642A3A Ckt 18 | Assist fire alarm crew to identify shunt trip circuit for elevator one and two |
4/14/2025 7:24:21 | 3626 | Alma Armenta | Cameron, Benjamin | Facilities | 235A | Install Data Logger in Panel |
4/14/2025 7:20:24 | 3625 | Justin Solis | Delgado, Alex | Facilities | 31-ac-002-disc | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/14/2025 7:12:50 | 3624 | Justin walker | Delgado, Alex | Facilities | 513A1A1/B55CHILLER | Preventive maintenance and solenoid replacement |
4/14/2025 7:04:00 | 3623 | Capeto | Delgado, Alex | Facilities | 25A1A45A/ 50 AC 021 | Replace failed IFM |
4/14/2025 7:02:21 | 3622 | Gerald Fowler | Delgado, Alex | Facilities | 368A1A/environmental chamber | Pm on environmental chamber |
4/14/2025 6:52:52 | 3621 | Alma Armenta | Cameron, Benjamin | Facilities | 290A | Remove Data Logger in Panel |
4/11/2025 12:56:20 | 3620 | Capeto | Delgado, Alex | Facilities | PNL-003-71C | PM |
4/11/2025 12:51:17 | 3619 | Capeto | Delgado, Alex | Facilities | PNL-003-71C/ 71C AC 001 | PM |
4/11/2025 12:45:23 | 3618 | Justin walker | Delgado, Alex | Facilities | 514A6A-3/ 71 ac 009 | Perform scheduled maintenance |
4/11/2025 12:37:32 | 3617 | Alejandro Lopez | Ramer, Robert | Facilities | 244A2A | Airgap fume hood in room 247B at building 2 |
4/11/2025 11:37:55 | 3616 | Justin Walker | Delgado, Alex | Facilities | 514A2A4A/ 71 AC 007 | PM AC 007 |
4/11/2025 11:33:22 | 3615 | Justin Walker | Delgado, Alex | Facilities | 514a2a4a/71 AC 008 | PM 71 AC008 |
4/11/2025 7:44:47 | 3614 | Capeto | Delgado, Alex | Facilities | EM66A9A1A1A5KA/ 62 AC 010a | PM |
4/10/2025 11:31:42 | 3613 | Jeff Hendrick | Cameron, Benjamin | Facilities | 198A1A/9 | Switch tripped breaker |
4/10/2025 10:40:59 | 3612 | Capeto | Delgado, Alex | Facilities | 50A AC 009 | PM |
4/10/2025 9:55:25 | 3611 | Alejandro Lopez | Ramer, Robert | Facilities | 245A5A28A | Reset tripped main breaker in electrical panel 245A5A28A on 2nd floor building 2 |
4/10/2025 9:53:10 | 3610 | AndrewSouthward | Cameron, Benjamin | Facilities | EM31A18A2A | Troubleshoot VFD for 70A-bl-90 |
4/10/2025 9:13:46 | 3609 | Michal capeto | Delgado, Alex | Facilities | 38A12A34A/50FAC001 | Preventive maintenance |
4/10/2025 8:48:08 | 3608 | Sayee Chea | Keusch, Justen | Facilities | 635A1A4A32A | Will be replacing Exit lights and Bug eye fixtures |
4/10/2025 8:47:58 | 3607 | Justin walker | Delgado, Alex | Facilities | 404A-9/ 75B ac003 | Performed scheduled maintenance |
4/10/2025 8:42:15 | 3606 | Justin walker | Delgado, Alex | Facilities | 404A-3/ 75B ac 001 | Perform scheduled maintenance |
4/10/2025 8:24:47 | 3605 | Gerald Fowler | Delgado, Alex | Facilities | 404A/75B-AC-004 | Pm on wall mounted AC unit |
4/10/2025 8:19:39 | 3604 | Gerald Fowler | Delgado, Alex | Facilities | 404A/75B-AC-002 | Pm on wall mounted ac unit |
4/10/2025 7:06:04 | 3603 | Alma Armenta | Cameron, Benjamin | Facilities | 637A-ckt 16, 637A15A-ckt 31, 635A1A4A31A-ckt 1, 637A21A-ckt 4, 8, 12, 29, 31, 33, E642A-ckt4. | Establish LP-5588, LP-5593, LP-5590, LP-5451 |
4/9/2025 13:11:07 | 3602 | Capeto | Delgado, Alex | Facilities | 33 AC 001/ E642A3A | PM |
4/9/2025 11:54:30 | 3601 | Capeto | Delgado, Alex | Facilities | E642A3A/ 33 AC 003 | PM |
4/9/2025 10:20:09 | 3600 | Alejandro Lopez | Ramer, Robert | Facilities | 634A1A3A | Investigate feeder wire size and power disconnect fuse size feeding dishwasher in room 0236 at building 33 |
4/9/2025 10:12:27 | 3599 | Capeto | Delgado, Alex | Facilities | E642A3A/ 33 AC 005 | PM |
4/9/2025 9:12:54 | 3598 | Justin walker | Delgado, Alex | Facilities | E642a3a-5/33 ac 4 disconect | Perform scheduled maintenance |
4/9/2025 9:02:10 | 3597 | Capeto | Delgado, Alex | Facilities | 33 AC 006 | PM |
4/9/2025 7:17:12 | 3596 | Mayumi Taylor | Keusch, Justen | Facilities | PNL 305a4a2a | Turn off panel 305a4a2a ct 1 feeding transformer bank 579 and pnl 579A, Loto, zvv and pull wires to new equipment. |
4/9/2025 6:38:01 | 3595 | AndrewSouthward | Cameron, Benjamin | Facilities | 671A12A | Open main breaker 671A12A |
4/8/2025 12:38:53 | 3594 | Balbino Mercadal | Keusch, Justen | Facilities | 147A1B | Perform Monthly PM on emergency lighting |
4/8/2025 7:36:47 | 3593 | Capeto | Delgado, Alex | Facilities | 002-86/ 86 AC 002 | PM |
4/8/2025 7:26:46 | 3592 | Alma Armenta | Cameron, Benjamin | Facilities | 33B | Remove Data Logger in Panel |
4/8/2025 7:11:08 | 3591 | Gerald fowler | Delgado, Alex | Facilities | 305A3A/48AC006 | Preventive maintenance |
4/8/2025 7:05:19 | 3590 | Gerald fowler | Delgado, Alex | Facilities | 305A3A/48AC005 | Preventive maintenance |
4/8/2025 7:02:21 | 3589 | Mayumi Taylor | Keusch, Justen | Facilities | 579A | Loto and zvv |
4/8/2025 7:02:08 | 3588 | Christopher Nelson | Combs, Everett | Facilities | 342A1A19A | Investigate old receptacle in room 011A so we can LOTO it to change it to a quad receptacle |
4/8/2025 6:45:35 | 3587 | Alma Armenta | Cameron, Benjamin | Facilities | 501A6A | Remove Data Logger in Panel |
4/7/2025 8:25:19 | 3586 | Balbino Mercadal | Keusch, Justen | Facilities | EM304A3A1A1A | Replace ballast on inductive lamp |
4/7/2025 8:20:51 | 3585 | Mayumi Taylor | Keusch, Justen | Facilities | 342a1a19a52a | LOTO,ZVV |
4/7/2025 8:19:44 | 3584 | Christopher Nelson | Combs, Everett | Facilities | 579A | LOTO circuits to be relocated |
4/7/2025 8:18:28 | 3583 | Colmenares | Cameron, Benjamin | Facilities | 25A1A Ckt | Trouble shoot cause of GP 32 tripping |
4/7/2025 6:57:07 | 3582 | Alarmentaduran@lbl.gov | Cameron, Benjamin | Facilities | 36A2A1A | Install Data Logger in Panel |
4/4/2025 12:35:14 | 3581 | Shane Miller | Secheck, Stephen | Facilities | E160A | Add circuit and new breaker 2nd floor room 208 |
4/4/2025 8:45:08 | 3580 | Erik line | Keusch, Justen | Facilities | E80A3A17A28A1A | Install data logger on panel E80A3A17A28A1A for a 1 week load study. |
4/4/2025 7:53:24 | 3579 | Juan juarez | Delgado, Alex | Facilities | 25A18A/50AC025 | Preventive maintenance |
4/4/2025 7:12:01 | 3578 | Justin Solis | Delgado, Alex | Facilities | 67-vfd-20/ahu-003 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/4/2025 6:55:32 | 3577 | Andrew Southward | Cameron, Benjamin | Facilities | E65A | Install Data Logger in Panel |
4/3/2025 12:17:41 | 3576 | Capeto | Delgado, Alex | Facilities | 217A5A1A/ 26 AC 015 | PM |
4/3/2025 9:50:02 | 3575 | Justin walker | Delgado, Alex | Facilities | 513a7a11b1a-15. 55 ac 40 | Perform scheduled maintenance |
4/3/2025 9:42:01 | 3574 | Justin walker | Delgado, Alex | Facilities | 55 ac 35 disconnect | Perform scheduled maintenance |
4/3/2025 8:50:40 | 3573 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A11B1A/55-AC-036 | Pm for 55-AC-036 |
4/3/2025 8:32:23 | 3572 | Sayee Chea | Keusch, Justen | Facilities | 342A1A15C | Replacing existing light fixture with LED light fixture |
4/3/2025 8:22:31 | 3571 | Capeto | Delgado, Alex | Facilities | 513A7A11B1A/ 55 AC 046 | PM |
4/3/2025 8:03:46 | 3570 | Juan jaurez | Delgado, Alex | Facilities | 112A6A1B1A/4 | Preventive maintenance |
4/3/2025 7:57:16 | 3569 | Colmenares | Cameron, Benjamin | Facilities | 635A1A4A31A. Ckt 3 | Contractors to disconnect lights from junction boxes, and ceiling |
4/3/2025 7:50:22 | 3568 | Colmenares | Cameron, Benjamin | Facilities | 637A10A- 21 | Disconnect Lighting circuit for room 228 |
4/3/2025 7:42:51 | 3567 | AndrewSouthward | Cameron, Benjamin | Facilities | 84-EL-001 control panel | Perform LP-5651 |
4/2/2025 8:02:56 | 3566 | Colmenares | Cameron, Benjamin | Facilities | PNL-010-84 | Switching support for PMT‘s blower 18 |
4/2/2025 7:39:18 | 3565 | Antonio collado | Delgado, Alex | Facilities | E38a9a temp panel / want chiller aru 009 | Pm aru 009 |
4/1/2025 8:14:52 | 3564 | Colmenares | Cameron, Benjamin | Facilities | M70A4A8A | Switching support for PMT |
4/1/2025 7:20:25 | 3563 | Alma Armenta | Cameron, Benjamin | Facilities | 73A /73A1A | Establish LP-5579 |
4/1/2025 7:13:09 | 3562 | Colmenares | Cameron, Benjamin | Facilities | 525A | Assist contractors with troubleshooting of the outbound grizzly gate, provide Mo to work if necessary |
3/31/2025 10:36:32 | 3561 | Balbino Mercadal | Keusch, Justen | Facilities | 501A8A | Perform Monthly PM on the emergency lighting |
3/31/2025 10:25:11 | 3560 | Balbino Mercadal | Keusch, Justen | Facilities | 111A | Perform monthly PM on emergency lighting |
3/31/2025 9:21:44 | 3559 | AndrewSouthward | Cameron, Benjamin | Facilities | 91-AC-3 | Take current reading for AC-3 |
3/31/2025 8:15:30 | 3558 | Colmenares | Cameron, Benjamin | Facilities | 99A6A | Switching support for PMT’s |
3/31/2025 8:08:37 | 3557 | Jeff Hendrick | Cameron, Benjamin | Facilities | 25AC5/1 | GCJ is replacing 7 light fixtures |
3/31/2025 7:56:20 | 3556 | Mayumi Taylor | Keusch, Justen | ALS | 06-cr 002 disc | Loto and zvv disconnect |
3/31/2025 7:39:09 | 3555 | Walker juatin | Delgado, Alex | Facilities | 309A/34ARU004 | Annual preventative maintenance |
3/31/2025 7:35:41 | 3554 | Larry Antles | Delgado, Alex | Facilities | EM357A1A7A1AC3A/B86 AC 002 | Remove and clean burner assembly |
3/31/2025 7:31:12 | 3553 | Antonio collado | Delgado, Alex | Facilities | Em357a1a7a1ac3a/ ac 001 | 86 ac 001 clean burner assembly area |
3/31/2025 7:16:52 | 3552 | Colmenares | Cameron, Benjamin | Facilities | 637A15A Ckt 31 | Removal of a 208 receptacle |
3/31/2025 7:16:29 | 3551 | Alma Armenta | Cameron, Benjamin | Facilities | 116A1A40A / 116A1A | Install Data Logger in Panel |
3/31/2025 7:09:31 | 3550 | Mayumi Taylor | Keusch, Justen | ALS | Disconnect 546a5a-cb10 | Loto and zvv disconnect for crane |
3/28/2025 7:56:30 | 3549 | A Turner | Hendrick, Jeffery | Facilities | E671A11A1A cuts 4&6 | Demo GP 1&4 pumps and all electrical equipment associated with it wires pipes motors etc,etc,. |
3/28/2025 6:59:53 | 3548 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A9A | I’m perform PM on 59-BL-006 |
3/27/2025 13:24:45 | 3547 | Alma Armenta | Cameron, Benjamin | Facilities | E590A7A ckt 16 | Perform PM on 59-VFD-008 |
3/27/2025 13:18:07 | 3546 | Balbino Mercadal | Keusch, Justen | Facilities | W0430237 | Replace bug eyes emergency lighting fixtures |
3/27/2025 9:02:32 | 3545 | Alejandro Lopez | Ramer, Robert | Facilities | 674A | Replace damaged GFCI power outlet. |
3/27/2025 8:40:06 | 3544 | Colmenares | Hendrick, Jeffery | Facilities | E596A1A8A | Perform annual PM maintenance on VFD‘s |
3/27/2025 8:28:07 | 3543 | Larry Antles | Delgado, Alex | Facilities | 148A/76L AC 003 | replace drier and reversing valve |
3/27/2025 8:27:40 | 3542 | Colmenares | Hendrick, Jeffery | Facilities | 596A1A5A | Perform annual maintenance on VFD‘s |
3/27/2025 6:54:08 | 3541 | Alma Armenta | Cameron, Benjamin | Facilities | 671A12A | Support for 91U pump testing |
3/26/2025 11:49:52 | 3540 | Alma Armenta | Cameron, Benjamin | Facilities | 217A3A5A10A ckt. 3 | Remove Data Logger in Panel |
3/26/2025 8:55:58 | 3539 | Capeto | Delgado, Alex | Facilities | 72A AC 010 | PM |
3/26/2025 8:55:43 | 3538 | Justin Solis | Delgado, Alex | Facilities | 72a-ac-11 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/25/2025 11:51:28 | 3537 | Andrew Southward | Cameron, Benjamin | Facilities | 237A2A | Install Data Logger in Panel |
3/25/2025 10:42:08 | 3536 | Andrew Southward | Cameron, Benjamin | Facilities | 67A18A | Install Data Logger in Panel |
3/25/2025 7:44:56 | 3535 | Antonio collado | Delgado, Alex | Facilities | M238A4A/02ARU003 | Compressor replacement |
3/25/2025 6:28:36 | 3534 | Alma Armenta | Cameron, Benjamin | Facilities | 85E | Establish LP-5592 |
3/24/2025 12:37:47 | 3533 | Alma Armenta | Cameron, Benjamin | Facilities | 650A1A4A | Troubleshoot inverter 650A1A4A in bldg 30 |
3/24/2025 8:12:29 | 3532 | Gerald Fowler | Delgado, Alex | Facilities | M238A4A/02-ARU-003 | Replace failed compressor |
3/24/2025 7:38:37 | 3531 | Larry Antles | Delgado, Alex | Facilities | 99A6A/90 AC 31 | remove indoor fan motor |
3/21/2025 14:52:31 | 3530 | Ernie Jew | Grounds, Jeff | Comp Sci | 692A4A & 628A7A | Troubleshoot VFD alarms in CDUs D100 and D101 |
3/21/2025 9:39:51 | 3529 | Larry Antles | Delgado, Alex | Facilities | 36A2A9A8A/B58 AC 001 | PM B58 AC001 |
3/21/2025 8:07:08 | 3528 | Sayee Chea | Keusch, Justen | Facilities | 590A15A39A circuit 1 | Replacing ballasts |
3/20/2025 13:07:53 | 3527 | Larry Antles | Delgado, Alex | Facilities | 342A1A7A40A/B80A AC 001 | remove and replace outdoor fan motor |
3/20/2025 9:21:45 | 3526 | Alejandro Lopez | Ramer, Robert | Facilities | 25A5C | Identify lighting circuit feeding room 6005 at building 50. |
3/20/2025 8:25:20 | 3525 | Pica | Cameron, Benjamin | Facilities | MCC 001-85 and ATS 001 | Monthly Gen Test |
3/19/2025 12:20:33 | 3524 | Capeto | Delgado, Alex | Facilities | 212A/55A AC 003 | PM |
3/19/2025 9:06:43 | 3523 | Justin Solis | Delgado, Alex | Facilities | 25a18a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/19/2025 9:46:15 | 3522 | Greg Neidiger | Secheck, Stephen | Facilities | 25A18A10A-4 and 13 | Replace damaged receptacle |
3/19/2025 8:43:01 | 3521 | Sayee Chea | Keusch, Justen | Facilities | 467A2A /Crt 34 | Will be replacing bug eye fixtures |
3/19/2025 7:35:11 | 3520 | Mayumi Taylor | Keusch, Justen | ALS | 334a3a | Loto,zvv,replace receptacle |
3/19/2025 7:27:42 | 3519 | Alma Armenta | Cameron, Benjamin | Facilities | 85E | Replace floats for GP-25A, GP-25B, GP-28A, GP-28B |
3/18/2025 13:14:58 | 3518 | Shane Miller | Secheck, Stephen | Facilities | 25A6A | Reset tripped breaker |
3/18/2025 13:14:57 | 3517 | Capeto | Delgado, Alex | Facilities | E43A1A/ 26 AC 018 | PM |
3/18/2025 13:14:33 | 3516 | Balbino Mercadal | Keusch, Justen | Facilities | 253B1A33A | Replace ballast as needed |
3/18/2025 13:00:29 | 3515 | Balbino Mercadal | Keusch, Justen | Facilities | 491A9A | Lights out in the hallway outside r105 |
3/18/2025 12:54:50 | 3514 | Alma Armenta | Cameron, Benjamin | Facilities | 79A | Install Data Logger in Panel |
3/18/2025 10:50:12 | 3513 | Mayumi Taylor | Combs, Everett | Facilities | 319A | Switch Tripped. Breaker |
3/18/2025 10:47:32 | 3512 | Colmenares | Cameron, Benjamin | Facilities | MCC70A4A12A1A | Switching support for PMT‘s |
3/18/2025 9:33:57 | 3511 | Sayee Chea | Keusch, Justen | Facilities | E38A9A3A | Will be replacing Emergency Light fixtures |
3/18/2025 8:00:38 | 3510 | Gerald Fowler | Delgado, Alex | Facilities | E362A1A | Pm for 15-AC-001 |
3/18/2025 8:00:15 | 3509 | Capeto | Delgado, Alex | Facilities | E362A1A/ 15 AC 002 | PM |
3/18/2025 7:36:08 | 3508 | Avery Turner | Cameron, Benjamin | Facilities | 2388981ACKT – 52 | Establish LOTTO |
3/18/2025 7:00:04 | 3507 | Andrew Southward | Cameron, Benjamin | Facilities | 467A | Perform LP-5578 |
3/17/2025 8:37:31 | 3506 | Colmenares | Cameron, Benjamin | Facilities | M512A7A | Switching support for PMT’s |
3/17/2025 8:25:02 | 3505 | Colmenares | Cameron, Benjamin | Facilities | 266A33A | Switching support for PMT‘s |
3/17/2025 7:20:13 | 3504 | Justin Solis | Delgado, Alex | Facilities | 596a1a1a39a-3/rtu-004-59 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/15/2025 7:22:46 | 3503 | Sayee Chea | Keusch, Justen | Facilities | 671A11A9A | Will be replacing light fixtures |
3/14/2025 13:09:29 | 3502 | Balbino Mercadal | Keusch, Justen | Facilities | 190A9A | Perform Monthly PM on emergency lighting |
3/13/2025 13:28:42 | 3501 | Balbino Mercadal | Keusch, Justen | Facilities | 73A4B | Re-lamp paint room with LED lamps |
3/13/2025 9:54:36 | 3500 | Andrew Southward | Cameron, Benjamin | Facilities | 730A | Temp power feed to FAP |
3/13/2025 9:51:03 | 3499 | Mayumi Taylor | Keusch, Justen | ALS | 302A1A | Lotto,zvv |
3/13/2025 9:11:08 | 3498 | Mayumi Taylor | Keusch, Justen | ALS | 280A | Turn circuits 9&11 on |
3/13/2025 8:38:04 | 3497 | Alma Armenta | Cameron, Benjamin | Facilities | 344A3A ckt 16 | Isolate feed for fire alarm panel for FLP-641 |
3/13/2025 8:02:58 | 3496 | Antonio collado | Delgado, Alex | Facilities | Mcc38a6a/ ahu 007 rm 2265 | Remove beating from ahu , inspect drain pan |
3/13/2025 7:53:04 | 3495 | Andrew Southward | Cameron, Benjamin | Facilities | 15A15A | Temp up FAP |
3/12/2025 13:18:19 | 3494 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2A6A | Perform Monthly PM on emergency lighting fixtures. |
3/12/2025 8:27:50 | 3493 | Joseph Pica | Cameron, Benjamin | Facilities | 35B26A-1 | LOTO Lighting circuit to remove and safety fluorescent fixture |
3/12/2025 8:12:44 | 3492 | Justin walker | Delgado, Alex | Facilities | 80A3A17A-23. / 88Aru 012 | Perform scheduled maintenance |
3/12/2025 7:39:08 | 3491 | Gerald Fowler | Delgado, Alex | Facilities | 631A3A/56A-AC-002 | Replace defrost control |
3/11/2025 9:44:56 | 3490 | Alma Armenta | Cameron, Benjamin | Facilities | M550A2A-1 | Replace motor for 67-BL-13 |
3/11/2025 7:28:51 | 3489 | Capeto | Delgado, Alex | Facilities | 25A1A/ VFDs for BL 03 and BL 06 | Repair leak at heating coil |
3/11/2025 7:21:59 | 3488 | Alma Armenta | Cameron, Benjamin | Facilities | 546A7A | Troubleshoot return air for AHU-2 |
3/10/2025 13:17:49 | 3487 | Balbino Mercadal | Keusch, Justen | Facilities | E43A5A | Perform Monthly PM on emergency lighting |
3/10/2025 13:05:54 | 3486 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Perform Monthly PM on emergency lighting |
3/10/2025 9:28:05 | 3485 | Larry Amntles | Delgado, Alex | Facilities | 15A15A-65/Bm53 UH 11 | remove and replace B53 UH 11 blower motor |
3/10/2025 9:09:03 | 3484 | Robert Ralph | Combs, Everett | Facilities | 310A | Non hazardous switching |
3/10/2025 7:58:11 | 3483 | Alma Armenta | Cameron, Benjamin | Facilities | 290A | Install Data Logger in Panel |
3/7/2025 9:50:04 | 3482 | Christopher | Combs, Everett | Facilities | 314A/Ba So1314, 318A/, S061314, 322A/S01013 | Switch Safety Racks back on |
3/7/2025 8:32:39 | 3481 | Alma Armenta | Cameron, Benjamin | Facilities | 33B | Install Data Logger in Panel |
3/7/2025 7:18:45 | 3480 | Andrew Southward | Cameron, Benjamin | Facilities | 501A6A | Install Data logger |
3/6/2025 14:50:05 | 3479 | greg neidiger | Combs, Everett | ALS | 15A15A58A-11 | remove broken prong from receptacle |
3/6/2025 8:51:35 | 3478 | Alma Armenta | Cameron, Benjamin | Facilities | M70A2A6A | Support seal kit change out for motor 20 @70 for PMT’s. |
3/6/2025 8:12:37 | 3477 | Andrew Southward | Cameron, Benjamin | Facilities | MCC70A2A6A | Remove GP-20-70 for seal repair. |
3/5/2025 12:56:11 | 3476 | Colmenares | Cameron, Benjamin | Facilities | 70A4A12A1A | There’s been a complaint about noise coming from the ventilation system systematically shut down AU 39, 4041 and 33 to see if noise goes away |
3/5/2025 10:06:32 | 3475 | Christopher Nelson | Combs, Everett | Facilities | 323A / BA B0107 | Switch and LOTO and ZVV BA panel Rack B0107 for Data Workers to pull new network cable. |
3/5/2025 8:52:11 | 3474 | Colmenares | Cameron, Benjamin | Facilities | M34A19A10A | Replace GP 32 motor pump assembly with PMT’s |
3/5/2025 8:22:11 | 3473 | Alma Armenta | Cameron, Benjamin | Facilities | 91-AC-004 VFD DISC | Change out VFD for 91-AC-004 |
3/5/2025 8:17:33 | 3472 | Christopher Nelson | Combs, Everett | Facilities | 324A / B030714 | switch BA panel B030714 off and ZVV for ALS to have Data workers pull a new networking cable in This Rack. Via Breaker # 27 in Panel 324A |
3/5/2025 6:02:03 | 3471 | Balbino Mercadal | Keusch, Justen | Facilities | 29A15A1A | Replace battery on emergency lighting fixture |
3/4/2025 12:34:08 | 3470 | Mike Rose | Cameron, Benjamin | Facilities | Bus 101 | Complete Lotto LP 3248 |
3/4/2025 8:32:03 | 3469 | Avery J Turner | Cameron, Benjamin | Facilities | Blower 03, 04, AHU2 sup and Return | Switching and LOTO Support Roof Exh Blowers AHU02 |
3/4/2025 7:24:01 | 3468 | Alma Armenta | Cameron, Benjamin | Facilities | 85-AD-22 | Replace motor for 85-BL-022 |
3/4/2025 6:27:36 | 3467 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A1A | Perform Monthly PM on emergency lighting |
3/3/2025 18:36:12 | 3466 | Michel Kireeff Covo | Other | Other | Main Magnet Power Supply | Inspection BJ1--28/30 Air Flow Switch |
3/3/2025 11:30:01 | 3465 | Mayumi Taylor | Keusch, Justen | Facilities | 318A | Turn off breaker in PNL318A circuit 38 |
3/3/2025 9:36:54 | 3464 | Alma Armenta | Cameron, Benjamin | Facilities | 189A10A | Install Data Logger in Panel |
3/3/2025 7:48:44 | 3463 | Colmenares | Cameron, Benjamin | Facilities | 38A | Switching support for HVAC |
3/3/2025 7:38:57 | 3462 | Capeto | Delgado, Alex | Facilities | 38A/ 50B ARU 007 | PM |
3/3/2025 7:05:07 | 3461 | Alma Armenta | Cameron, Benjamin | Facilities | 635A1A3A | Establish LP-5607 |
2/28/2025 13:03:50 | 3460 | Balbino Mercadal | Keusch, Justen | Facilities | 454A | Perform Monthly PM on emergency lighting |
2/28/2025 10:35:28 | 3459 | Joko | Hendrick, Jeffery | Facilities | Bus 101 | ZVV install grounds complete cable termination in testing |
2/28/2025 9:31:17 | 3458 | Capeto | Delgado, Alex | Facilities | 514A1A/71 AHU 036 | PM |
2/28/2025 8:40:47 | 3457 | Gerald Fowler | Delgado, Alex | Facilities | 514A6A/71-ARU-008 | Perform leak inspection |
2/28/2025 8:38:24 | 3456 | Capeto | Delgado, Alex | Facilities | 514A1A7A/ 71 AHU 039 | PM |
2/28/2025 8:24:57 | 3455 | Andrew Southward | Cameron, Benjamin | Facilities | EU671A11A1A11A | Move circuits in panel EU671A11A1A11A according to engineer drawings |
2/28/2025 8:00:46 | 3454 | Colmenares | Cameron, Benjamin | Facilities | 30A4A5A | Switching support for PMT’s |
2/28/2025 7:45:16 | 3453 | Larry Antles | Delgado, Alex | Facilities | 90A9A/90 AC 43 | Remove and Replace B90 AC 43 Condenser Fan and Motor assembly |
2/27/2025 13:11:40 | 3452 | Shane Miller | Secheck, Stephen | Facilities | 138A | Add exit light in office |
2/27/2025 8:38:12 | 3451 | Larry Antles | Delgado, Alex | Facilities | E679A1A5A/RM 261 Enviro Cond | PM RF 261 |
2/27/2025 8:30:54 | 3450 | Capeto | Delgado, Alex | Facilities | E679A1A5A/91 RF 262 | PM |
2/27/2025 8:20:15 | 3449 | Justin walker | Delgado, Alex | Facilities | E38A9A-10 | Perform scheduled maintenance |
2/27/2025 8:03:26 | 3448 | Justin walker | Delgado, Alex | Facilities | 38A1A/50BAHU029 | Preventive maintenance |
2/27/2025 7:57:48 | 3447 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A2A Ckt 9 | VFD annual P.M’s |
2/26/2025 13:12:42 | 3446 | Luis Perez | Other | Other | TEST | TEST |
2/26/2025 11:54:20 | 3445 | Andrew Southward | Cameron, Benjamin | Facilities | E31A18A3F | Troubleshoot GP-40/41 |
2/26/2025 10:31:30 | 3444 | Andrew Southward | Cameron, Benjamin | Facilities | 35A10A | Troubleshoot gp-33 |
2/26/2025 10:31:07 | 3443 | Scott Small | Other | Other | B88 Cave 1 Beam Plug | Electrically disconnect Beam Plug DC Motor (150 VDC, 2A) |
2/26/2025 9:40:29 | 3442 | Alma Armenta | Cameron, Benjamin | Facilities | M218A1A | Troubleshoot 37-BL-102 |
2/26/2025 8:52:45 | 3441 | Capeto | Delgado, Alex | Facilities | 99A6A/ 90 AC 031 | PM |
2/26/2025 8:45:17 | 3440 | Alma Armenta | Cameron, Benjamin | Facilities | EM66A9A1A1A | Troubleshoot 62-BL-246 |
2/26/2025 8:34:19 | 3439 | Colmenares | Cameron, Benjamin | Facilities | 91 MP 001 | Vacuum Systems PM |
2/26/2025 8:21:16 | 3438 | Colmenares | Cameron, Benjamin | Facilities | 81-KC-001 Disc | Switching support for Contractor maintenance actions |
2/26/2025 7:57:26 | 3437 | Joe pica | Hendrick, Jeffery | Facilities | 70A EL 1 | Repair |
2/26/2025 7:42:17 | 3436 | Gerald walker | Delgado, Alex | Facilities | 44A1B/46AC044 | Compressor replacement |
2/26/2025 7:15:42 | 3435 | Alma Armenta | Cameron, Benjamin | Facilities | 637A21A / 642A4A / 63A15A | Establish LP-5590 and LP-5573 |
2/25/2025 14:21:15 | 3434 | Capeto | Delgado, Alex | Facilities | 229A/ 90 AC 035 | PM |
2/25/2025 11:04:28 | 3433 | Justin walker | Delgado, Alex | Facilities | 513A7A11B1A-2/4/6. 55 ac 37 | Replace faulty ck board |
2/25/2025 10:33:49 | 3432 | Colmenares | Cameron, Benjamin | Facilities | 650A2A Ckt 7 | Replace oil switch sensor for MP001 and 002 |
2/25/2025 10:08:08 | 3431 | Ernie Jew | Grounds, Jeff | Comp Sci | B59 Cooling Towers 1-7 | Installing float sensors at Cooling Towers |
2/25/2025 9:01:51 | 3430 | Erik Line | Keusch, Justen | Facilities | 88-VFD-020 (88-GP-62) | LOTO GP 062 for the Plumber |
2/25/2025 8:31:57 | 3429 | Colmenares | Cameron, Benjamin | Facilities | 99A5A | Switch support for PMT’s |
2/25/2025 7:54:02 | 3428 | Colmenares | Cameron, Benjamin | Facilities | 266A33A Ckt 8 | Airgap gap AHU 19 At building 64 |
2/25/2025 7:47:48 | 3427 | Capeto | Delgado, Alex | Facilities | 80A3A17A/ 88 ARU 012 | Insulation blanket install and installing crank case heaters |
2/25/2025 7:33:24 | 3426 | Alma Armenta | Cameron, Benjamin | Facilities | UE592A | Remove Data Logger in Panel |
2/25/2025 6:40:33 | 3425 | Andrew Southward | Cameron, Benjamin | Facilities | 246A4A | Install Data Logger in Panel |
2/24/2025 13:33:19 | 3424 | Balbino Mercadal | Keusch, Justen | Facilities | 420A8A1A | Perform Monthly PM on emergency lighting |
2/24/2025 13:13:56 | 3423 | Capeto | Delgado, Alex | Facilities | 92A4A/ 90 AC 030 | PM |
2/24/2025 9:42:15 | 3422 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A2A at 0.88 cal and 650A2A2A at 0.39 cal | Perform preventive maintenance to VFD’s |
2/24/2025 9:28:09 | 3421 | Capeto | Delgado, Alex | Facilities | 90 A9A/ 90 AC 048 | PM |
2/24/2025 9:12:51 | 3420 | Dave Davis | Combs, Everett | Facilities | M304A3A5A and 334A | Remove circuits 31& 33 unless conductors can be used for current project. Either way panel 334A has to be shutdown and ZVV in order to research existing conductors. |
2/24/2025 8:43:24 | 3419 | Andrew Southward | Cameron, Benjamin | Facilities | 217A3A5A10A | Install Data Logger in Panel |
2/24/2025 8:25:25 | 3418 | Capeto | Delgado, Alex | Facilities | 99A2A/ 90AC 032 | PM |
2/24/2025 8:24:50 | 3417 | Erik Line | Keusch, Justen | Facilities | GP-5-88 | Establish LOTO for PMT’s |
2/24/2025 7:57:52 | 3416 | Alma Armenta | Cameron, Benjamin | Facilities | 555A | Remove Data Logger in Panel |
2/24/2025 7:10:36 | 3415 | Ben Cameron | Hendrick, Jeffery | Facilities | 50A-CT-6 | Replace 50A CT 6 VFD bypass enclosure |
2/21/2025 14:58:07 | 3414 | Larry Antles | Delgado, Alex | Facilities | 513A1A1A/55A chiller | Troubleshoot phase monitor alarm |
2/21/2025 12:47:38 | 3413 | Alejandro Lopez | Ramer, Robert | Facilities | E594A 591A40A | Provide new power outlets for SES in room 3102 at building 59. |
2/21/2025 12:47:16 | 3412 | Shane Miller | Secheck, Stephen | Facilities | 595A40A | Loto Circuit and re-route power to access control panel |
2/21/2025 9:21:41 | 3411 | Justin walker | Delgado, Alex | Facilities | 90A90-10 | Perform scheduled maintenance |
2/21/2025 8:39:19 | 3410 | Alma Armenta | Cameron, Benjamin | Facilities | 67A18A | Remove Data Logger in Panel |
2/21/2025 8:02:32 | 3409 | Andrew Southward | Cameron, Benjamin | Facilities | 70A2A | Remove Data Logger in Panel |
2/21/2025 7:35:17 | 3408 | Alma Armenta | Cameron, Benjamin | Facilities | 38A2A | Remove Data Logger in Panel |
2/21/2025 7:31:49 | 3407 | Colmenares | Cameron, Benjamin | Facilities | E72A9B1A Ckt 1 and 2 | PMT support switching often on blower 68 and 69 |
2/21/2025 6:59:18 | 3406 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A3A | Remove Data Logger in Panel |
2/21/2025 6:33:47 | 3405 | Andrew Southward | Cameron, Benjamin | Facilities | 501A5A4A | Install Data Logger in Panel |
2/20/2025 9:11:51 | 3404 | Erik Line | Keusch, Justen | Facilities | 355A15A | Installing new breaker on a power supply |
2/20/2025 7:47:03 | 3403 | Alma Armenta | Cameron, Benjamin | Facilities | 35A11B | Establish FLP-600 to replace VFD for CT-6 |
2/20/2025 7:18:04 | 3402 | Colmenares | Cameron, Benjamin | Facilities | MCC ON ROOF | Support Kone elevator crew |
2/19/2025 13:28:08 | 3401 | Balbino Mercadal | Keusch, Justen | Facilities | 491A9A | Replace wall sensor light switch |
2/19/2025 13:19:49 | 3400 | Balbino Mercadal | Keusch, Justen | Facilities | 30A3A4E | Replace emergency lighting fixture |
2/19/2025 12:32:22 | 3399 | Colmenares | Cameron, Benjamin | Facilities | Autoclave1 and 2 disconnect PNL 671A1A3A Ckt 1,2,3,4,56 and | Perform ohm checks to heating elements power off and then amp readings mode 2 work to test auto clave heaters |
2/19/2025 9:31:39 | 3398 | Colmenares | Cameron, Benjamin | Facilities | M70A4A8A | PMT is switching support |
2/19/2025 7:40:55 | 3397 | Andrew Southward | Cameron, Benjamin | Facilities | 303A1A | Install Data Logger in Panel |
2/19/2025 7:16:34 | 3396 | Colmenares | Cameron, Benjamin | Facilities | 59-PNL-32 | Switching support for contractors |
2/18/2025 12:22:38 | 3395 | Shane Miller | Secheck, Stephen | Facilities | 87D | Loto,ZVV panel 87D. Pull in new circuit, change breaker, inspect work. |
2/18/2025 11:45:07 | 3394 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2B2A | Perform Monthly PM on emergency lighting |
2/18/2025 11:27:58 | 3393 | Balbino Mercadal | Keusch, Justen | Facilities | 35B4A | Perform Monthly PM on emergency lighting |
2/18/2025 9:37:49 | 3392 | Sayee Chea | Keusch, Justen | Facilities | E250A | Installing Exit Light fixtures |
2/18/2025 8:31:05 | 3391 | Capeto | Delgado, Alex | Facilities | 001 70A/ 70A ARU 001 | PM |
2/18/2025 8:01:20 | 3390 | Larry Antles | Delgado, Alex | Facilities | 491A9A/B85B AC 002 | PM B85B AC 002 |
2/18/2025 7:59:40 | 3389 | Juan juarez | Delgado, Alex | Facilities | 491A4A/85bac004 | Preventive maintenance |
2/18/2025 7:56:29 | 3388 | Larry Antles | Delgado, Alex | Facilities | 491A3A/B85b AC001 | PM B85B AC 001 |
2/18/2025 7:55:17 | 3387 | Juan juarez | Delgado, Alex | Facilities | 491A10A/85BAC003 | Preventive maintenance |
2/18/2025 7:37:02 | 3386 | Antonio Collado | Delgado, Alex | Facilities | 85f/ anodize chiller | Troubleshoot chiller for plating shop |
2/18/2025 7:32:17 | 3385 | Colmenares | Cameron, Benjamin | Facilities | 613-A5A | Swishy support under LP 5577 |
2/14/2025 10:37:07 | 3384 | Erik Line | Keusch, Justen | Facilities | A3221 | Demoing one circuit feeding a receptacle. |
2/14/2025 10:27:21 | 3383 | Colmenares | Cameron, Benjamin | Facilities | 02 -BL-017 disc | Assist PMT,s with motor replacement BL-17 |
2/14/2025 9:36:32 | 3382 | Erik Line | Keusch, Justen | Facilities | 81A9A | Replacing receptacle |
2/14/2025 8:08:59 | 3381 | Mayumi Taylor | Keusch, Justen | Facilities | 579A | Disconnecting bandsaw from power in building 80 room 011a |
2/14/2025 7:33:18 | 3380 | Larry Antles | Delgado, Alex | Facilities | E650A5A1A2A/30-AHU 006 | PM B30 AHU 006 |
2/14/2025 7:28:03 | 3379 | Larry Antles | Delgado, Alex | Facilities | E650A5A1A2A/30 AHU 001 | PM B30 AHU 001 |
2/14/2025 7:13:09 | 3378 | Alma Armenta | Cameron, Benjamin | Facilities | 85B28A | Remove Data Logger in Panel |
2/13/2025 11:28:37 | 3377 | Larry Antles | Delgado, Alex | Facilities | 247A1A/B2 AHU 002 | Troubleshoot AHU 002 |
2/13/2025 10:30:51 | 3376 | Capeto | Delgado, Alex | Facilities | 221A/ 55 AC 031 (55 SSI 001) | Switch |
2/13/2025 9:47:31 | 3375 | Alma Armenta | Cameron, Benjamin | Facilities | 72A4A | Establish simple loto for auger/conveyor system |
2/13/2025 8:38:03 | 3374 | Ben Cameron | Hendrick, Jeffery | Facilities | M550A1A4A | VFD pm |
2/13/2025 7:39:19 | 3373 | Alma Armenta | Cameron, Benjamin | Facilities | 38A1A6A10A | Remove Data Logger in Panel |
2/13/2025 7:03:58 | 3372 | Alma Armenta | Cameron, Benjamin | Facilities | 501A | Remove Data Logger in Panel |
2/12/2025 12:55:48 | 3371 | AndrewSouthward | Cameron, Benjamin | Facilities | AHU-36-71 | Troubleshoot run command for ahu-36 |
2/12/2025 10:49:10 | 3370 | Alma Armenta | Cameron, Benjamin | Facilities | E363A1A | Troubleshoot battery charger circuit for EG81 |
2/12/2025 8:46:05 | 3369 | Colmenares | Cameron, Benjamin | Facilities | 67-PNL-031 | Shut off power as per LP 5576 |
2/12/2025 7:26:04 | 3368 | Andrew Southward | Cameron, Benjamin | Facilities | 66A | Switching support for ARU-07-62 |
2/11/2025 11:51:32 | 3367 | Capeto | Delgado, Alex | Facilities | 218A2AC3A1A/ 43 AC 002 | PM |
2/11/2025 11:49:13 | 3366 | Juan juarez | Delgado, Alex | Facilities | 218A2AC3A1A/43AC002 | Preventive maintenance |
2/11/2025 9:27:47 | 3365 | AJTurner | Cameron, Benjamin | Facilities | MCC70A4A8A | ReleaseLOTO Energize Loads Confirm Rotation |
2/11/2025 8:32:47 | 3364 | AJ Turner | Cameron, Benjamin | Facilities | 266A40A9A-3 | Evaluate and Reset Tripped CB |
2/11/2025 8:11:11 | 3363 | Larry Antles | Delgado, Alex | Facilities | 512/ 91U Temp Chiller | Troubleshoot Pump Fault |
2/11/2025 7:15:58 | 3362 | Capeto | Delgado, Alex | Facilities | 513A11B11A/ 55 AC 042 | PM |
2/11/2025 7:11:00 | 3361 | Juan juarez | Delgado, Alex | Facilities | 513A7A11B1A/55AC043 | Preventive maintenance |
2/10/2025 13:53:18 | 3360 | David Davis | Keusch, Justen | Facilities | 310A | LOTO and ZVV BA panel |
2/10/2025 8:24:08 | 3359 | Ben cameron | Cameron, Benjamin | Facilities | 246A4A10A | Switching and motor replacement |
2/10/2025 7:49:24 | 3358 | Capeto | Delgado, Alex | Facilities | 631A3A/ 56A AC 002 | PM |
2/10/2025 7:46:03 | 3357 | Gerald Fowler | Delgado, Alex | Facilities | 631A4A/56A-AC-003 | Pm for 56A-AC-003 |
2/10/2025 7:28:06 | 3356 | Juan Juárez | Delgado, Alex | Facilities | 631A10A/ 56AAC005 | Preventive maintenance |
2/10/2025 7:22:31 | 3355 | Juan juarez | Delgado, Alex | Facilities | 631A21A/56AAC001 | Preventive maintenance |
2/10/2025 7:20:04 | 3354 | Antonio Collado | Delgado, Alex | Facilities | 631a9a/ 56a ac 004 | Pm ac 004 |
2/10/2025 7:16:18 | 3353 | Antonio collado | Delgado, Alex | Facilities | 631a16a/ 56a ac 007 | Pm on ac 007 |
2/7/2025 12:45:22 | 3352 | Antonio Collado | Delgado, Alex | Facilities | 513a7a5a/ 55 ac 052 | Inspect unit for burnt smell |
2/7/2025 12:35:59 | 3351 | Balbino Mercadal | Keusch, Justen | Facilities | 44A1A33A | Perform Monthly PM on emergency lighting |
2/7/2025 12:02:59 | 3350 | Andrew Southward | Cameron, Benjamin | Facilities | MCC72E | Troubleshoot VFD alarm for GP-51 |
2/7/2025 8:55:45 | 3349 | Colmenares | Cameron, Benjamin | Facilities | 2BL13 | PMT Switching Support |
2/7/2025 8:41:11 | 3348 | Antonio Collado | Delgado, Alex | Facilities | 513a7a5a/ 55 ac 024 | Troubleshoot ac 24 |
2/7/2025 7:21:45 | 3347 | Larry Antles | Delgado, Alex | Facilities | 47A3A/74 AC 19 | PM B74 AC 19 |
2/6/2025 13:32:37 | 3346 | Balbino Mercadal | Keusch, Justen | Facilities | 266A10A | Replace ballast as needed |
2/6/2025 10:54:26 | 3345 | Larry Antles | Delgado, Alex | Facilities | 38A11A | Check operations |
2/6/2025 9:14:58 | 3344 | Mayumi Taylor | Keusch, Justen | ALS | 277A | Replace GFCI in sector 12 on bench |
2/6/2025 8:11:43 | 3343 | Andrew Southward | Cameron, Benjamin | Facilities | 596A1A4A-15 | Troubleshoot ahu-19 |
2/6/2025 7:49:44 | 3342 | Alma Armenta | Cameron, Benjamin | Facilities | 35C | Troubleshoot 50A-GP-31 |
2/5/2025 12:53:08 | 3341 | Capeto | Delgado, Alex | Facilities | E305A3A39A1A1A/ 48 SSI 01 | Electrical troubleshooting |
2/5/2025 7:38:22 | 3340 | Alma Armenta | Cameron, Benjamin | Facilities | E191A1A2A | Replace motors for BL-74 & BL-75 |
2/5/2025 7:30:33 | 3339 | Beau erwin | Keusch, Justen | ALS | 334A/26 | Replace motor on roll up door |
2/5/2025 7:30:03 | 3338 | Walker justin | Delgado, Alex | Facilities | M215A5A/66AC002 | Annual maintenance chiller |
2/5/2025 7:12:14 | 3337 | Capeto | Delgado, Alex | Facilities | 514A1A/ 71 AHU 036 | Troubleshooting blower motor |
2/5/2025 6:59:31 | 3336 | Colmenares | Cameron, Benjamin | Facilities | PNL-010-69 | LP-5559 replace receptacle |
2/4/2025 13:15:02 | 3335 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A31A | Perform Monthly PM on emergency lighting |
2/4/2025 7:20:53 | 3334 | Beau Erwin | Keusch, Justen | ALS | 334A | Loto for roll up door work |
2/3/2025 13:06:03 | 3333 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Light sensor don't work.Replace sensor as needed |
2/3/2025 12:57:51 | 3332 | Alejandro Lopez | Ramer, Robert | Facilities | 33X1A3A | Replace damaged EV car charger |
2/3/2025 8:08:55 | 3331 | Andrew Southward | Cameron, Benjamin | Facilities | M550A1A4A | Troubleshoot pressure switch for KC-001 |
2/3/2025 7:40:34 | 3330 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL-20 | Demo circuit 19 and 25 to the nearest boxing ceiling |
2/3/2025 7:30:14 | 3329 | Colmenares | Cameron, Benjamin | Facilities | 635A1A Ckt 3 | Remove circuit four wires conduit to panel by contractors |
2/3/2025 7:24:08 | 3328 | Capeto | Delgado, Alex | Facilities | 215A5A/ 66 ARU 001 | PM |
2/3/2025 7:14:33 | 3327 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL 005 | Lotto out Lighting circuit to Contractor Can separate circuit |
1/31/2025 12:12:20 | 3326 | Juan juarez | Delgado, Alex | Facilities | E362A1A/15AC002 | Preventive maintenance |
1/31/2025 12:08:27 | 3325 | Juan Juárez | Delgado, Alex | Facilities | E362A1A/15AC001 | Preventive maintenance |
1/31/2025 8:05:07 | 3324 | Justin walker | Delgado, Alex | Facilities | 564A-12 | Scheduled pm |
1/31/2025 7:39:41 | 3323 | Capeto | Delgado, Alex | Facilities | 99A6A/ 90 BR 005 | Diagnose failure on boiler |
1/30/2025 8:20:40 | 3322 | Colmenares | Cameron, Benjamin | Facilities | 34CT2 | CT 2 PM |
1/30/2025 7:31:23 | 3321 | Colmenares | Cameron, Benjamin | Facilities | 357A1A5 | LOTO / ZVV for contractors |
1/29/2025 9:21:27 | 3320 | Erik Line | Keusch, Justen | Facilities | 355A | De-energizing panel to re route power for receptacles. |
1/29/2025 6:34:15 | 3319 | Andrew Southward | Cameron, Benjamin | Facilities | VFD-BL-018-84 | Reset/troubleshoot BL-18-84 |
1/27/2025 13:59:37 | 3318 | Balbino Mercadal | Keusch, Justen | Facilities | 266A10A | Replace ballasts and lamps outages |
1/27/2025 13:20:12 | 3317 | Capeto | Delgado, Alex | Facilities | 176A21C/90 AC 002 | PM |
1/27/2025 10:08:30 | 3316 | Capeto | Delgado, Alex | Facilities | 305A4A1A1A/80 AC 029 | PM |
1/27/2025 10:07:32 | 3315 | Antonio Collado | Delgado, Alex | Facilities | 305a4a1a1a/ 80 ac 028 | Pm on ac 28 |
1/27/2025 9:24:02 | 3314 | Capeto | Delgado, Alex | Facilities | 25A1A25A/ 50 AC 021 | PM |
1/27/2025 8:02:37 | 3313 | Juan juarez | Delgado, Alex | Facilities | E363A1A/62BAC001 | High pressure control replacement |
1/27/2025 8:00:12 | 3312 | Justin Solis | Delgado, Alex | Facilities | 550a1a-39/aru-001-67a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/24/2025 9:13:44 | 3311 | Alma Armenta | Cameron, Benjamin | Facilities | 31A7G | Establish LP-5315 |
1/24/2025 8:20:54 | 3310 | Colmenares | Cameron, Benjamin | Facilities | 56-Vfd006, 005, 002, 004 | Switch blower two blower AHU 1&2 |
1/23/2025 13:21:02 | 3309 | Balbino Mercadal | Keusch, Justen | Facilities | 35B16B | Replace lamps and ballasts as needed |
1/23/2025 12:22:03 | 3308 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A5A/55-AC-052 | Pm for 55-AC-052 |
1/23/2025 10:29:18 | 3307 | Erik Line | Keusch, Justen | Facilities | 124A2B28A ct-10 | Switching Breaker |
1/23/2025 9:49:52 | 3306 | Colmenares | Cameron, Benjamin | Facilities | PNL-83-74 | Troubleshoot MP 009 to find cause of tripping record current readings |
1/23/2025 8:42:15 | 3305 | Colmenares | Cameron, Benjamin | Facilities | 375A1A | Test emergency generator |
1/23/2025 8:34:05 | 3304 | Andrew Southward | Cameron, Benjamin | Facilities | 555A | Install Data Logger in Panel |
1/23/2025 8:10:57 | 3303 | Gerald Fowler | Delgado, Alex | Facilities | 179A/69-AC-011 | Pm for 69-AC-011 |
1/23/2025 8:08:00 | 3302 | Andrew Southward | Cameron, Benjamin | Facilities | 189A5A | Install Data Logger in Panel |
1/22/2025 13:32:23 | 3301 | Gerald Fowler | Delgado, Alex | Facilities | 185A/69-AC-001 | Pm for 69-AC-001 |
1/22/2025 12:09:18 | 3300 | Colmenares | Cameron, Benjamin | Facilities | 238A | HVAC switching support ARU2 |
1/22/2025 12:07:01 | 3299 | Juan juarez | Delgado, Alex | Facilities | 185A/69AC011 | Preventive maintenance |
1/22/2025 12:02:30 | 3298 | Capeto | Delgado, Alex | Facilities | 217A1A3A/ 69 AC 009 | PM |
1/22/2025 7:52:33 | 3297 | Juan Juárez | Delgado, Alex | Facilities | 217A1A3A/69AC007 | Preventive maintenance |
1/22/2025 7:51:37 | 3296 | Larry Antles | Delgado, Alex | Facilities | 217A1A3A/B69 AC 005 | PM B69 AC 005 |
1/22/2025 7:48:20 | 3295 | Capeto | Delgado, Alex | Facilities | 217A1A3A/ 69 AC 008 | PM |
1/22/2025 7:45:55 | 3294 | Justin Solis | Delgado, Alex | Facilities | 217a11a3a/ac-006-69 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/22/2025 6:46:05 | 3293 | Alma Armenta | Cameron, Benjamin | Facilities | E31A18A1A | Establish LP-5205 |
1/21/2025 15:19:33 | 3292 | Erik Line | Keusch, Justen | Facilities | 355A9A | Establish LOTO for AECR Ion Source RF Envelope Access Equipment |
1/21/2025 13:49:25 | 3291 | Balbino Mercadal | Keusch, Justen | Facilities | 178A | Perform Monthly PM on emergency lighting |
1/21/2025 12:07:34 | 3290 | Alma Armenta | Cameron, Benjamin | Facilities | UE592A | Install Data Logger in Panel |
1/21/2025 9:30:49 | 3289 | Alma Armenta | Cameron, Benjamin | Facilities | 246A4A | Install data logger in panel 246A4A |
1/21/2025 8:29:03 | 3288 | Colmenares | Cameron, Benjamin | Facilities | 81A2A | Switching support for PMT |
1/21/2025 8:21:53 | 3287 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A3A | Install data logger in panel 501A5A3A |
1/21/2025 8:04:51 | 3286 | Justin walker | Delgado, Alex | Facilities | SWGR238ACKT7 /02ARU002 | Preventive maintenance |
1/21/2025 8:03:46 | 3285 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A4A | Install data logger in panel 501A5A4A |
1/21/2025 6:59:28 | 3284 | Colmenares | Cameron, Benjamin | Facilities | 237A | Switching Support HVAC ARU-2 |
1/17/2025 8:11:27 | 3283 | Colmenares | Cameron, Benjamin | Facilities | M38A6A | Switching support PMT |
1/17/2025 8:04:57 | 3282 | Colmenares | Cameron, Benjamin | Facilities | MCC Mounted Disconnect 76KC07 | LOTO 76-KC-07 |
1/17/2025 7:51:27 | 3281 | Robert Ralph | Combs, Everett | Facilities | 331A15A | Remove switch controlling receptacle. |
1/17/2025 6:49:48 | 3280 | Andrew Southward | Cameron, Benjamin | Facilities | 70A2A8A | Install Data Logger in Panel |
1/16/2025 8:31:11 | 3279 | Colmenares | Cameron, Benjamin | Facilities | 345A | Switching support for PMT’s |
1/16/2025 8:20:09 | 3278 | Sayee Chea | Keusch, Justen | Facilities | M304A3A5A32A | Replacing light fixture with LED light fixture |
1/16/2025 7:31:44 | 3277 | Andrew Southward | Cameron, Benjamin | Facilities | 85B28A | Replace both motors for compressor at building 77 |
1/16/2025 6:39:26 | 3276 | Andrew Southward | Cameron, Benjamin | Facilities | 38A2A | Install Data Logger in Panel |
1/15/2025 13:45:19 | 3275 | Andrew Southward | Cameron, Benjamin | Facilities | 38A | Close breaker 38A5A |
1/15/2025 13:11:43 | 3274 | Balbino Mercadal | Keusch, Justen | Facilities | 66A4A4A | Perform Monthly PM on emergency lighting |
1/15/2025 10:07:16 | 3273 | Larry Antles | Delgado, Alex | Facilities | E35B15A1A/B50A AC 008 | PM AC 008 |
1/15/2025 8:40:00 | 3272 | Antonio Collado | Delgado, Alex | Facilities | 480a5a / ac-12-50b | Pm ac 12 |
1/15/2025 8:38:11 | 3271 | Andrew Southward | Cameron, Benjamin | Facilities | 33B39A | Install Data Logger in Panel |
1/15/2025 7:44:03 | 3270 | Juan Juárez | Delgado, Alex | Facilities | 513A7A11B1A/55AC038 | Preventive maintenance |
1/15/2025 7:29:05 | 3269 | Alma Armenta | Cameron, Benjamin | Facilities | 67A | Remove data logger in panel 67A |
1/15/2025 7:23:55 | 3268 | Capeto | Delgado, Alex | Facilities | E35B15A1A/ 50A AC 009 | PM |
1/15/2025 6:59:39 | 3267 | Andrew Southward | Cameron, Benjamin | Facilities | 38A3A | Install Data Logger in Panel |
1/14/2025 12:56:46 | 3266 | Balbino Mercadal | Keusch, Justen | Facilities | 215A3A1A | Replace ballast as needed |
1/14/2025 9:42:46 | 3265 | AndrewSouthward | Hendrick, Jeffery | Facilities | M305A4A6A | Troubleshoot OL on VFD for BL-49 |
1/14/2025 7:02:13 | 3264 | Capeto | Delgado, Alex | Facilities | 667A6A/ 90X ARU 001 | PM |
1/14/2025 6:51:47 | 3263 | AndrewSouthward | Cameron, Benjamin | Facilities | E460A5A1A10A | Perform LP-5488 |
1/13/2025 9:10:52 | 3262 | Christopher Nelson | Combs, Everett | Facilities | 306A4A | Switch panel 306A4A and Hang Red LOTO Locks for safety |
1/13/2025 8:36:48 | 3261 | Colmenares | Hendrick, Jeffery | Facilities | PNL 132 02 | Replace belts andSheves blower 15 |
1/13/2025 8:20:36 | 3260 | Larry Antles | Delgado, Alex | Facilities | 24A13A/B50 AC 20 | PM B50 AC 20 |
1/13/2025 8:14:25 | 3259 | Andrew Southward | Cameron, Benjamin | Facilities | 501A | Install Data Logger in Panel |
1/13/2025 8:05:11 | 3258 | Larry Antles | Delgado, Alex | Facilities | 25A17A40A/B50 AC 19 | PM AC 19 |
1/13/2025 7:39:16 | 3257 | Colmenares | Hendrick, Jeffery | Facilities | 238A | Support HVAC by Shutting off power and wrecking out breaker Utilizing chicken switch |
1/13/2025 7:20:35 | 3256 | Alma Armenta | Cameron, Benjamin | Facilities | E790A1A1A ckt 40 | Establish LP 5515 |
1/13/2025 7:12:18 | 3255 | Alma Armenta | Cameron, Benjamin | Facilities | 217A1A1A | Establish LP-5520 |
1/10/2025 10:26:36 | 3254 | Larry Antles | Delgado, Alex | Facilities | 217A3A3A/76 AC 11 | Replace B76 AC 11 outdoors fans and motors |
1/10/2025 8:26:25 | 3253 | Capeto | Delgado, Alex | Facilities | E38A9A/ 50B AHU 026 | PM |
1/10/2025 7:54:30 | 3252 | Christopher Nelson | Combs, Everett | Facilities | 335A | Install GFCI Receptacle for Water new water dispenser |
1/10/2025 7:29:20 | 3251 | Gerald Fowler | Delgado, Alex | Facilities | MCC38A6A/50B-AHU-025 | Pm for 50B-AHU-025 |
1/10/2025 7:21:16 | 3250 | AndrewSouthward | Cameron, Benjamin | Facilities | 671A9A | Change rating plug and downstream fuses for AC-3 and AC-4 |
1/10/2025 6:34:08 | 3249 | Andrew Southward | Cameron, Benjamin | Facilities | 85B28A | Install Data Logger in Panel |
1/9/2025 13:34:11 | 3248 | Balbino Mercadal | Keusch, Justen | Facilities | 345A | Perform Monthly PM on emergency lighting |
1/9/2025 13:20:27 | 3247 | Balbino Mercadal | Keusch, Justen | Facilities | E155B1A | Perform Annual PM on emergency lighting |
1/9/2025 11:02:10 | 3246 | Sayee Chea | Keusch, Justen | Facilities | M304A3A6A38A | Replaced lamps and ballasts |
1/8/2025 13:33:39 | 3245 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A3A | Perform Monthly PM on emergency lighting |
1/8/2025 10:16:30 | 3244 | Alma Armenta | Cameron, Benjamin | Facilities | 35C | Switching support for HVAC |
1/8/2025 9:32:19 | 3243 | Capeto | Delgado, Alex | Facilities | 35C/ 50A ARU 005 | PM |
1/8/2025 8:38:55 | 3242 | Gerald fowler | Delgado, Alex | Facilities | 659A9A/90XWH002 | Preventive maintenance |
1/7/2025 10:46:36 | 3241 | Balbino Mercadal | Keusch, Justen | Facilities | 33B39A | Perform Monthly PM on emergency lighting |
1/7/2025 10:32:08 | 3240 | Alejandro Lopez | Ramer, Robert | Facilities | 263A4A1A | Replace damaged 60amp pendant sleeve power receptacle along with circuit breaker |
1/7/2025 10:16:47 | 3239 | Capeto | Delgado, Alex | Facilities | 659A10A/ 90X ARU 002 | PM |
1/7/2025 9:59:30 | 3238 | Colmenares | Cameron, Benjamin | Facilities | PNL-028-50A | Disconnect GP 32 pump motor |
1/7/2025 6:49:15 | 3237 | Alma Armenta | Cameron, Benjamin | Facilities | 111A ckt 19 | Establish LP5517 |
1/6/2025 12:23:53 | 3236 | Shane Miller | Secheck, Stephen | Facilities | E38A9A1A | Troubleshoot light not working in cooridor 0239 |
1/6/2025 10:36:29 | 3235 | Capeto | Delgado, Alex | Facilities | 253A1A/ 46 AC 010 | PM |
1/6/2025 10:02:31 | 3234 | David Davis | Keusch, Justen | Facilities | 280A | LOTO and ZVV circuits 9 and 11 in panel 280A |
1/6/2025 8:03:50 | 3233 | Justin Solis | Delgado, Alex | Facilities | 35a-9/aru-006-50a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/6/2025 7:33:00 | 3232 | Colmenares | Cameron, Benjamin | Facilities | 358A Ckt 7 & 8 | Established lotto for contractorsLP5507 |
1/6/2025 6:26:45 | 3231 | Andrew Southward | Cameron, Benjamin | Facilities | 652A1A1A | Install Data Logger in Panel |
1/3/2025 8:34:45 | 3230 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-005-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 8:31:05 | 3229 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-006-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 7:45:45 | 3228 | Colmenares | Cameron, Benjamin | Facilities | 37 GP 118 & 119 Disconnects & Controllers | Arc Flash Survey |
1/3/2025 7:44:39 | 3227 | Colmenares | Cameron, Benjamin | Facilities | Gp118 and 118 disconnect | Arc Flash study GP118 and 119 |
1/3/2025 7:42:17 | 3226 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-008-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 7:10:38 | 3225 | AndrewSouthward | Cameron, Benjamin | Facilities | 215A3A2A | Remove data logger |
1/2/2025 7:08:47 | 3224 | AndrewSouthward | Cameron, Benjamin | Facilities | E217A2A2A | Troubleshoot/repair starter for bl-4 |
12/23/2024 8:14:33 | 3223 | Colmenares | Cameron, Benjamin | Facilities | E217A2A2A Ckt 4 | Troubleshoot blower for control circuit |
12/23/2024 7:19:16 | 3222 | Amsouthward | Cameron, Benjamin | Facilities | 90A8A | LOTO out 90A8, ZVV at mcc and repair bucket handles as needed |
12/20/2024 8:40:45 | 3221 | Nick g | Secheck, Stephen | Facilities | 501A7A/17 | Remove and replace juice box with xeal. |
12/20/2024 8:13:21 | 3220 | Colmenares | Cameron, Benjamin | Facilities | MCC35A10A | Arc flash for MCC 35A10A |
12/20/2024 7:02:28 | 3219 | Shane Miller | Secheck, Stephen | Facilities | 193A2A | Bring down panel, replace breaker for new microscope |
12/19/2024 12:37:49 | 3218 | Larry Antles | Delgado, Alex | Facilities | E38A9A/B50B ARU 009 | check amps on each circuit |
12/19/2024 10:25:23 | 3217 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A52A | Troubleshoot sander to find out why it’s not working. |
12/19/2024 9:41:18 | 3216 | Colmenares | Cameron, Benjamin | Facilities | M218a2a5d | Switching support |
12/19/2024 8:21:32 | 3215 | Juan Juárez | Delgado, Alex | Facilities | M238A4A/02ARU003 | Annual Preventive maintenance |
12/19/2024 8:02:14 | 3214 | AndrewSouthward | Cameron, Benjamin | Facilities | 357A1A | Perform monthly generator test |
12/18/2024 13:23:14 | 3213 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A52A | Disconnect lathe |
12/18/2024 10:45:18 | 3212 | Robert Ralph | Combs, Everett | Facilities | 579A | Disconnect 2 drill presses and one lathe |
12/18/2024 10:10:14 | 3211 | Robert Ralph | Combs, Everett | Facilities | 347A28A | Add a receptacle to existing 120v circuit, remove existing receptacle and blank off. |
12/18/2024 9:38:26 | 3210 | Colmenares | Cameron, Benjamin | Facilities | E160A | Blower motor replacement 33 |
12/18/2024 9:09:02 | 3209 | Justin Solis | Delgado, Alex | Facilities | E679a-24/91-rf-102 | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
12/18/2024 8:09:23 | 3208 | Larry Antles | Delgado, Alex | Facilities | 247A1A/B2 AC 002 | PM B2 AC 002 |
12/18/2024 6:01:52 | 3207 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Perform Monthly PM on emergency lighting |
12/17/2024 11:52:50 | 3206 | nick g | Secheck, Stephen | Facilities | 38A2A/5 | install a dent meter for panel 38A2A5A. |
12/17/2024 8:24:09 | 3205 | Andrew Southward | Cameron, Benjamin | Facilities | E363A1A | Switching support for fire alarm |
12/17/2024 7:40:21 | 3204 | Capeto | Delgado, Alex | Facilities | 49A3A3A/46 AC 019 | Replace IFM |
12/17/2024 7:25:05 | 3203 | Robert Ralph | Combs, Everett | Facilities | 647A7A | Get a measurement of the amperage of 120/208 v circuits in panel 647A7A |
12/17/2024 7:05:13 | 3202 | Larry Antles | Delgado, Alex | Facilities | DP-671A9A/91 AC 003 | Troubleshoot B91 AC 003 |
12/16/2024 10:00:03 | 3201 | Ari Harding | Other | Other | N/A | Safe off old 10kV capacitor found on mezzanine during cleanout |
12/16/2024 9:29:44 | 3200 | AndrewSouthward | Cameron, Benjamin | Facilities | M218A1A | Cycle power to VFD for GP-138 |
12/16/2024 9:27:51 | 3199 | Robert Ralph | Combs, Everett | Facilities | 302A3A | Open circuit Breaker 317 @ 302A3A and perform ZVV in order to replace 6x6” T with a straight piece of 6x6” wire way. |
12/16/2024 8:17:40 | 3198 | Capeto | Delgado, Alex | Facilities | 15A15A-65/53 UH 011 | Troubleshooting |
12/16/2024 7:25:44 | 3197 | Alma Armenta | Cameron, Benjamin | Facilities | 67A | Install data logger in panel 67A |
12/16/2024 7:20:57 | 3196 | Larry Antles | Delgado, Alex | Facilities | 200A/B55 AC 50 | Repair B55 AC 50 |
12/16/2024 7:08:24 | 3195 | Colmenares | Cameron, Benjamin | Facilities | AAC-002 disconnect | HVAC to replace circuit boards and air-conditioning unit number two |
12/16/2024 6:47:20 | 3194 | Alma Armenta | Cameron, Benjamin | Facilities | 38A3A | Install data logger |
12/14/2024 9:58:02 | 3193 | Balbino Mercadal | Keusch, Justen | Facilities | 30A2A4D | Perform Annual PM on emergency lighting |
12/14/2024 9:45:11 | 3192 | Balbino Mercadal | Keusch, Justen | Facilities | E31A18A3C | Perform Annual PM on emergency lighting |
12/13/2024 13:29:08 | 3191 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A | Perform Monthly PM on emergency lighting |
12/13/2024 8:52:17 | 3190 | Pica | Cameron, Benjamin | Facilities | 85-AD-16 (BL-16) | Restoration Switching |
12/13/2024 8:06:34 | 3189 | Gerald Fowler | Delgado, Alex | Facilities | 22A/76-AC-009 | Perform Pm on split system ac unit |
12/12/2024 13:17:46 | 3188 | Shane Miller | Secheck, Stephen | Facilities | 555A21A | Loto panel 555A21A, ZVV, Replace breaker for Microscope project |
12/12/2024 11:11:48 | 3187 | Colmenares | Cameron, Benjamin | Facilities | 38A switchboard | Switch to support for HVAC |
12/12/2024 7:34:13 | 3186 | Alma Armenta | Cameron, Benjamin | Facilities | EPP125A / 671A12A | Establish LP-5496 |
12/11/2024 13:30:16 | 3185 | Chris Nelson | Combs, Everett | Facilities | 295A4A | Replace GFCI RECEPTACLES |
12/11/2024 11:55:12 | 3184 | Alma Armenta | Cameron, Benjamin | Facilities | 263A1A ckt. 10 | Troubleshoot well pump EW-58-1 |
12/11/2024 10:12:19 | 3183 | David Davis | Combs, Everett | Facilities | 295A4A | LOTO circuits 1 and 5 in panel 295A4A to replace 4 malfunctioning GFCIs. |
12/11/2024 8:51:41 | 3182 | Alma Armenta | Cameron, Benjamin | Facilities | 217A1A1A ckt. 39 | Establish LP-5514 |
12/10/2024 13:24:56 | 3181 | Balbino Mercadal | Keusch, Justen | Facilities | E43A6A | Perform Monthly PM on emergency lighting |
12/10/2024 8:12:16 | 3180 | Andrew Southward | Cameron, Benjamin | Facilities | M80A7A | Replace valve controller on the sand filter |
12/9/2024 12:30:23 | 3179 | Larry Antles | Delgado, Alex | Facilities | 38A/50B ARU 007 | Replace Comp #1 |
12/9/2024 10:10:39 | 3178 | Alma Armenta | Cameron, Benjamin | Facilities | 650A2A2A | Troubleshoot VFD 30-VFD-19 |
12/9/2024 7:58:42 | 3177 | Alma Armenta | Cameron, Benjamin | Facilities | 33B39A | Install data logger in panel 33B39A |
12/9/2024 7:32:00 | 3176 | Andrew Southward | Cameron, Benjamin | Facilities | 95A40A | Install Data Logger in Panel |
12/9/2024 7:02:01 | 3175 | Andrew Southward | Cameron, Benjamin | Facilities | 696A | Install Data Logger in Panel |
12/6/2024 12:42:10 | 3174 | nick gripe | Secheck, Stephen | Facilities | 200A4A/7 | trace unknown circuit for future freezer. |
12/6/2024 12:16:13 | 3173 | Alma Armenta | Cameron, Benjamin | Facilities | W0406873 | Install data logger in panel 652A1A1A |
12/6/2024 11:17:38 | 3172 | Alejandro Lopez | Ramer, Robert | Facilities | 358A | Identify circuits feeding FH-001 AND FH-002 in room 0114 at building 85. |
12/6/2024 8:32:38 | 3171 | Colmenares | Hendrick, Jeffery | Facilities | MCC70A4A12A1A | Switching support |
12/6/2024 7:45:34 | 3170 | Capeto | Delgado, Alex | Facilities | DP 671A9A/91 AHU 001 | PM |
12/6/2024 6:25:32 | 3169 | Colmenares | Hendrick, Jeffery | Facilities | 85F39A | Lp-5495 |
12/5/2024 8:08:54 | 3168 | Colmenares | Cameron, Benjamin | Facilities | 650A2Ackt6&9 | Motor Replacements |
12/5/2024 7:59:59 | 3167 | Colmenares | Cameron, Benjamin | Facilities | MCC 001 70 | PMT Switching Support |
12/4/2024 11:57:39 | 3166 | Larry Antles | Delgado, Alex | Facilities | 217A3A1A/76 AC 12 | PM 76 AC 012 |
12/4/2024 9:12:11 | 3165 | Alejandro Lopez | Ramer, Robert | Facilities | 637A3A | Apply simple LOTO, ZVV and airgap furniture whip in order for contractor to install new power device on the partition wall for future phone booth. Release LOTO and test power devices. |
12/4/2024 8:45:06 | 3164 | Larry Antles | Delgado, Alex | Facilities | 217A3A3A/AC 11 | PM AC 11 |
12/4/2024 8:42:39 | 3163 | Dave Davis | Combs, Everett | ALS | 347A28A | Isolate energy source at panel 347A28A circuit 11 for receptacle on 2nd floor ALS building 6 lobby. LOTO, ZVV and remove receptacle faceplate. |
12/3/2024 8:25:12 | 3162 | Colmenares | Cameron, Benjamin | Facilities | 47A3A | Switching support |
12/3/2024 7:21:47 | 3161 | Larry Antles | Delgado, Alex | Facilities | 517A7ADA1A/B64 ARU 005 | PM 64 ARU 005 |
12/3/2024 8:17:28 | 3160 | Ben Agas and Ed Bekheet | Baird, Shawn | Facilities | E38A9A1A. 21,22,24 and 2 | Disconnect perm power and put temp power on all 4 FA panels off same breaker panel |
12/2/2024 13:56:46 | 3159 | Capeto | Delgado, Alex | Facilities | 148/ 76L AC 004 | PM |
12/2/2024 11:02:43 | 3158 | Alma Armenta | Cameron, Benjamin | Facilities | M70A4A8A | Establish LP-5317 / LP-5255 |
12/2/2024 10:35:31 | 3157 | Larry Antles | Delgado, Alex | Facilities | 47a5a9a4a/74B AC 001 | PM 74B AC 001 |
12/2/2024 10:35:31 | 3156 | Shane Miller | Secheck, Stephen | Facilities | E38A9A1A | Run temp power to FPU for up coming outage |
12/2/2024 9:27:31 | 3155 | Larry Antles | Delgado, Alex | Facilities | 47a5a9a1a/B74A AC 001 | PM B74A AC001 |
12/2/2024 8:08:33 | 3154 | Mike Chatham and Ed Bekheet | Baird, Shawn | Facilities | 38A2A6A, Circuit 4 | Disconnect perm power and hook up temp power to VESDA unit for Rm 2265 |
12/2/2024 7:30:06 | 3153 | Alma Armenta | Cameron, Benjamin | Facilities | E38A9A ckt 12 | Establish LP-5252 |
11/27/2024 8:30:49 | 3152 | Capeto | Delgado, Alex | Facilities | 35C10A/ 50A AHU 013 | PM |
11/27/2024 8:26:34 | 3151 | Larry Antles | Delgado, Alex | Facilities | M47A3A69A3A/ 74 AC 028 | PM B74 AC 28 |
11/27/2024 8:06:13 | 3150 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-012 | Pm for 50A-AHU-012 |
11/27/2024 7:29:19 | 3149 | Antonio Collado | Delgado, Alex | Facilities | M47a3a69a3a, 74 ac 026 | Pm on ac 26 |
11/27/2024 7:18:57 | 3148 | Alma Armenta | Cameron, Benjamin | Facilities | 91-BL-002 VFD | Troubleshoot ground fault on 91-BL-002 |
11/27/2024 7:01:00 | 3147 | Juan juarez | Delgado, Alex | Facilities | 513A7A11B1A/46AC046 | Preventive maintenance |
11/26/2024 8:33:49 | 3146 | AndrewSouthward | Cameron, Benjamin | Facilities | 342A1A19A46A | Replace BL-02 |
11/26/2024 7:35:13 | 3145 | Colmenares | Cameron, Benjamin | Facilities | E359A | Switching support for Fire Alarm |
11/26/2024 7:31:37 | 3144 | AndrewSouthward | Cameron, Benjamin | Facilities | 754A | Perform LP-5314 |
11/25/2024 13:11:05 | 3143 | Alma Armenta | Cameron, Benjamin | Facilities | TSW 1 70A | Remove Installed Data Logger |
11/25/2024 11:32:34 | 3142 | Alejandro Lopez | Ramer, Robert | Facilities | 551A3A | Demo reactor glove box electrical feed from local disconnect to the unit in room 4206 at building 67. |
11/25/2024 9:28:33 | 3141 | Alma Armenta | Cameron, Benjamin | Facilities | EM30A5A3A | Provide switching support for PMT’s for several blowers on the roof |
11/25/2024 9:27:52 | 3140 | Larry Antles | Delgado, Alex | Facilities | 15A15A63A/ 53 AC 001 | LOTO, ZVV, Check and tighten electrical |
11/25/2024 9:17:43 | 3139 | Justin walker | Delgado, Alex | Facilities | 550A1a-16 | Perform annual pm |
11/25/2024 7:50:48 | 3138 | Alma Armenta | Cameron, Benjamin | Facilities | 85-TSW-01 / 357A1A | Replace timing relay on 85-TSW-01 and perform transfer test PM for EG-096-85 |
11/25/2024 6:48:21 | 3137 | Alma Armenta | Cameron, Benjamin | Facilities | 72A6A | Remove data logger in panel 72A6A ckt 17 |
11/23/2024 11:55:12 | 3136 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A33A | Perform Annual PM on emergency lighting |
11/23/2024 11:46:07 | 3135 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A46A | Perform Annual PM on emergency lighting. |
11/23/2024 11:37:45 | 3134 | Balbino Mercadal | Keusch, Justen | Facilities | E65A3A | Perform Annual PM on emergency lighting |
11/23/2024 11:27:34 | 3133 | Balbino Mercadal | Keusch, Justen | Facilities | 39A7A | Perform Annual PM on emergency lighting. Replace emergency fixture as needed. |
11/22/2024 13:40:12 | 3132 | Balbino Mercadal | Keusch, Justen | Facilities | 39A7A | Perform Monthly PM on emergency lighting |
11/22/2024 11:47:28 | 3131 | Shane Miller | Secheck, Stephen | Facilities | M460A1A | Troubleshoot disconnect handle at MCC panel |
11/22/2024 7:29:51 | 3130 | Cameron | Cameron, Benjamin | Facilities | 70A switchgear | Switching support |
11/22/2024 7:08:42 | 3129 | A. Armenta | Cameron, Benjamin | Facilities | 189A5A | Install Data Logger |
11/21/2024 12:47:23 | 3128 | Alejandro Lopez | Ramer, Robert | Facilities | 238A3A2A | Relocate FA horn strobe and lighting motion sensor in room 0247B at building 002. |
11/20/2024 9:37:21 | 3127 | Alejandro Lopez | Ramer, Robert | Facilities | E30A5A6A LOTO stablished at local disconnect due to over duty panel. | Remove old egress bug eye light fixture and install new combo exit/bug eye light fixture in room 0108C at building 70. |
11/20/2024 9:34:39 | 3126 | Justin walker | Delgado, Alex | Facilities | 650A2A-1 | Perform chiller annual on 30 Aru 002 |
11/20/2024 9:07:54 | 3125 | A Turner | Cameron, Benjamin | Facilities | MCC 001 70 | Switching support |
11/20/2024 7:50:52 | 3124 | Alma Armenta | Cameron, Benjamin | Facilities | 35A10A10A | Troubleshoot 50A-GP-034 |
11/19/2024 12:20:14 | 3123 | Antonio Collado | Delgado, Alex | Facilities | 452a/5.4 hutch ac unit | Pm ac unit |
11/19/2024 10:35:56 | 3122 | Juan juarez | Delgado, Alex | Facilities | 253B1A3A21A-46AC025 | Maintenance preventive |
11/19/2024 8:59:52 | 3121 | Sayee Chea | Keusch, Justen | Facilities | EM304A3A1A1A | Replacing ballast and Red tube guards |
11/19/2024 8:00:18 | 3120 | AndrewSouthward | Cameron, Benjamin | Facilities | M309A7A | Troubleshoot/repair com card on gp-6 at building 34 |
11/19/2024 6:36:52 | 3119 | Avery Turner | Cameron, Benjamin | Facilities | 217A1A | Establish LP-5452 |
11/19/2024 6:34:56 | 3118 | AndrewSouthward | Cameron, Benjamin | Facilities | 650A2A | Support vendor with troubleshooting plc controls for gp-18/19 |
11/18/2024 13:48:51 | 3117 | Alejandro Lopez | Ramer, Robert | Facilities | 559A4A | Remove 50amp power and replace with a 15amp power outlet in room 4203B as requested |
11/19/2024 6:03:03 | 3116 | Alma Armenta | Cameron, Benjamin | Facilities | 72D | Investigate 72D panel board after outage |
11/18/2024 9:30:46 | 3115 | Colmenares | Cameron, Benjamin | Facilities | 167 autoclave/dishwasher disconnect | Mode 2 take readings for contractors |
11/18/2024 7:37:29 | 3114 | Ben Cameron | Cameron, Benjamin | Facilities | TSW-001-91 | Function test TSW-001-91 |
11/18/2024 7:31:16 | 3113 | J Colmenares | Cameron, Benjamin | Facilities | 30-KC-001 | Vender LOTO |
11/18/2024 7:22:04 | 3112 | Larry Antles | Delgado, Alex | Facilities | 47A3A69A/B74 ADR 005 | Remove and Replace Air Dryer |
11/18/2024 7:15:53 | 3111 | Alma Armenta | Cameron, Benjamin | Facilities | 267A | Telemetry/logger replacement |
11/18/2024 7:14:56 | 3110 | Justin walker | Delgado, Alex | Facilities | 650A2A-14 | Perform chileller annual on 30 Aru 001 |
11/16/2024 6:55:04 | 3109 | Antonio Collado | Delgado, Alex | Facilities | E635a1a1a33a | Pm on ahu 2 |
11/16/2024 6:45:04 | 3108 | Larry Antles | Delgado, Alex | Facilities | E635A1A1A33A/AHU 001 | PM AHU 001 |
11/15/2024 12:12:59 | 3107 | Ari Harding | Other | Other | Rack 1 | Inspect Danfysik system 9700 power supply MOS |
11/15/2024 11:19:34 | 3106 | Alma Armenta | Cameron, Benjamin | Facilities | TSW-001-91 | Test for ohms on TSW-001-91 |
11/14/2024 13:27:36 | 3105 | Capeto | Delgado, Alex | Facilities | 266A40A3A/ 64 BR 008 | EHS to take sample |
11/14/2024 13:14:25 | 3104 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Only one light working in the men's restroom W041 |
11/14/2024 10:29:23 | 3103 | Colmenares | Cameron, Benjamin | Facilities | MCC70A4A12A1A | Trouble shoot VFD screen |
11/14/2024 9:09:34 | 3102 | Gerald Fowler | Delgado, Alex | Facilities | E671A11A6A/91-FCU-007 | Pm on air handler |
11/14/2024 8:53:01 | 3101 | Sayee Chea | Keusch, Justen | Facilities | 36B | Installing LED light fixtures |
11/12/2024 10:36:25 | 3100 | Colmenares | Cameron, Benjamin | Facilities | MCC-001-70 | Switching support for PMT’s blower PMs |
11/12/2024 9:29:41 | 3099 | Colmenares | Cameron, Benjamin | Facilities | 237A9A | Switching support for contractors |
11/12/2024 7:06:41 | 3098 | Alma Armenta | Cameron, Benjamin | Facilities | 344A | Establish LP-5438 |
11/11/2024 10:06:28 | 3097 | Pica | Cameron, Benjamin | Facilities | 72A1A21A ckt19 | Replace GP |
11/11/2024 8:23:51 | 3096 | Larry Antles | Delgado, Alex | Facilities | E655A/30 RFM 001 | FLP 566 check and tighten electrical |
11/11/2024 6:53:42 | 3095 | Andrew Southward | Cameron, Benjamin | Facilities | 237A1A | Install Data Logger in Panel |
11/8/2024 14:32:19 | 3094 | Ernie Jew | Grounds, Jeff | Comp Sci | UPS 1&2 | Installing Cell Watch Battery Monitoring System and UPM replacement |
11/8/2024 10:23:41 | 3093 | Capeto | Delgado, Alex | Facilities | MCC 6A9C1/72B AC 003 | Troubleshooting |
11/8/2024 9:00:02 | 3092 | Alma Armenta | Cameron, Benjamin | Facilities | E671A11A1A / EU671A11A1A11A | Conduct visual inspection and take photos of breakers/conductors for E671A11A1A and EU671A11A1A11A for FAEN group. |
11/8/2024 6:59:47 | 3091 | Alma Armenta | Cameron, Benjamin | Facilities | 95A40A | Install data logger in panel 95A40A |
11/7/2024 10:41:06 | 3090 | Capeto | Delgado, Alex | Facilities | 48A3A3A/ 46 AC 019 | Troubleshooting |
11/7/2024 9:58:50 | 3089 | greg neidiger | Secheck, Stephen | Facilities | 345A-20 | switch breaker on |
11/7/2024 8:05:07 | 3088 | AndrewSouthward | Cameron, Benjamin | Facilities | M550A1A4A-11A | Disco motor for pump seal repair |
11/7/2024 8:04:37 | 3087 | Colmenares | Cameron, Benjamin | Facilities | 46A1A Ckt 8 | Contractors to remove disconnect |
11/5/2024 7:55:49 | 3086 | Colmenares | Cameron, Benjamin | Facilities | 85E | Unwire and require new sump pumps for plating room |
11/5/2024 7:38:24 | 3085 | AndrewSouthward | Cameron, Benjamin | Facilities | TSW-001-91u | Take voltage readings in ATS-1-91u |
11/5/2024 7:17:20 | 3084 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | E680A. 14 | Putting temporary power on the FACP 91U |
11/13/2024 14:19:20 | 3083 | Chris Nelson | Keusch, Justen | Facilities | 302A3A ct 2 panel 317A | Pull out SO514 cables cables in power wire way and re route them into new 4x4 wire way so that the old racks can be removed. Requires a panel shutdown of 317A to get into power wire way. |
11/4/2024 7:18:48 | 3082 | Ben Cameron | Hendrick, Jeffery | Facilities | 25A1A | Check Rotation for 50 GP 34 |
11/4/2024 6:47:04 | 3081 | Andrew Southward | Cameron, Benjamin | Facilities | 647A | Install Data Logger in Panel |
11/1/2024 8:33:19 | 3080 | Erik Line | Keusch, Justen | Facilities | M80A7A | Check the current on each phase of GP-13 and establish LOTO for motor alignment. |
11/1/2024 8:20:13 | 3079 | Sayee Chea | Keusch, Justen | Facilities | 635A1A4A | Will be replacing 2 pole lights |
11/1/2024 8:01:09 | 3078 | Colmenares | Cameron, Benjamin | Facilities | MCC70A4A10A | LOTO AND ZVV currently LOTOED OUT FROM 03/25/24 |
11/1/2024 6:26:08 | 3077 | AndrewSouthward | Cameron, Benjamin | Facilities | 753A | Replace circuit breakers 753A and 753A17A |
10/31/2024 10:04:13 | 3076 | David Davis | Keusch, Justen | Facilities | 546A5A | LOTO panel. Demo existing wire and breaker for old forklift charger. Re-pull circuits and add new breaker. Release LOTO. |
10/31/2024 9:54:17 | 3075 | Robert Ralph | Combs, Everett | Facilities | 546A | Open CB# 546A5A at panel 546A, perform ZVV at panel 546A5A |
10/31/2024 6:39:44 | 3074 | Colmenares | Hendrick, Jeffery | Facilities | 25A1A45A | Motor replacement. |
10/30/2024 8:33:06 | 3073 | Colmenares | Cameron, Benjamin | Facilities | 456A7A | Troubleshoot blower 47 |
10/30/2024 7:13:36 | 3072 | AndrewSouthward | Cameron, Benjamin | Facilities | MCC38A6A | Replace GP-21 |
10/30/2024 6:49:48 | 3071 | Alma Armenta | Cameron, Benjamin | Facilities | MCC38A6A | Replace motor/pump for 50b-GP-020 |
10/29/2024 13:57:09 | 3070 | Gerald Fowler | Delgado, Alex | Facilities | EM357A1A7A1AC3A/86-AC-001 | Pm on rooftop ac unit |
10/29/2024 13:26:11 | 3069 | Balbino Mercadal | Keusch, Justen | Facilities | 176A21B (659A-45) | Perform Annual PM on emergency lighting |
10/29/2024 12:12:11 | 3068 | Larry Antles | Delgado, Alex | Facilities | 266A40A3A/64 BR008 | LOTO ZVV Boiler for inspection |
10/29/2024 10:47:25 | 3067 | Armand uribe | Ramer, Robert | Facilities | 557A | Shutdown panel 557A and downstream to 557A4A and panel 557A3A. ZVV each panel. |
10/29/2024 9:24:10 | 3066 | Greg Neidiger | Secheck, Stephen | Facilities | 583A-7 | Replace GFCi and test |
10/29/2024 8:12:57 | 3065 | Andrew Southward | Cameron, Benjamin | Facilities | 215A3A2A | Install Data Logger in Panel |
10/29/2024 8:12:52 | 3064 | Juan Juárez | Delgado, Alex | Facilities | E35B15A1A/50AAC009 | Preventive maintenance |
10/29/2024 7:48:39 | 3063 | Capeto | Delgado, Alex | Facilities | E35B15A1A/ 50A AC 008 | PM |
10/29/2024 6:58:44 | 3062 | Andrew Southward | Cameron, Benjamin | Facilities | 696A | Install Data Logger in Panel |
10/28/2024 12:59:18 | 3061 | Balbino Mercadal | Keusch, Justen | Facilities | E45A33A | Perform Annual PM on emergency lighting |
10/28/2024 9:35:37 | 3060 | Larry antles | Delgado, Alex | Facilities | 72D/10-77AARU001 | Troubleshooting electrical panel trip |
10/28/2024 7:51:11 | 3059 | Gerald Fowler | Delgado, Alex | Facilities | M70A4A8A1A | Replace compressor module |
10/28/2024 6:59:04 | 3058 | Andrew Southward | Cameron, Benjamin | Facilities | 72D | Troubleshoot/inspect tripped breaker |
10/25/2024 13:52:50 | 3057 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A40A | Perform Annual PM on emergency lighting |
10/25/2024 10:35:14 | 3056 | AndrewSouthward | Cameron, Benjamin | Facilities | 91-TSW-001 | Test ATS |
10/25/2024 9:23:22 | 3055 | Colmenares | Cameron, Benjamin | Facilities | 560A15A disc, Ckt 27, 21. & 31 | LOTO for autoclave |
10/25/2024 8:02:11 | 3054 | Antonio collado | Delgado, Alex | Facilities | 305a4a1a1a/ bl 032-80 | Pm , bl 32 |
10/24/2024 13:42:12 | 3053 | Balbino Mercadal | Keusch, Justen | Facilities | 405A39A | Fix light outage in rm109 |
10/24/2024 13:35:29 | 3052 | Balbino Mercadal | Keusch, Justen | Facilities | 405A39A | Fixed lamp outage in 110D |
10/24/2024 12:50:58 | 3051 | Andrew Southward | Cameron, Benjamin | Facilities | 72A6A | Install Data Logger in Panel |
10/24/2024 12:00:04 | 3050 | Andrew Southward | Cameron, Benjamin | Facilities | TSW-1-70A | Install Data Logger in Panel |
10/24/2024 7:52:05 | 3049 | Larry Antles | Delgado, Alex | Facilities | 266A40A3A/64 BR 008 | LOTO ZVV BR008 |
10/24/2024 7:20:42 | 3048 | AndrewSouthward | Cameron, Benjamin | Facilities | 357A1A | Perform monthly generator test |
10/23/2024 14:24:38 | 3047 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | E680A. 14 | Put permanent power back onto the FACP |
10/23/2024 12:11:00 | 3046 | Gerald Fowler | Delgado, Alex | Facilities | 177A1A1B/90C-AC-004 | Pm for 90C-AC-004 |
10/23/2024 12:04:10 | 3045 | Gerald Fowler | Delgado, Alex | Facilities | 177A1A1A/90C-AC-003 | Pm on 90C-AC-003 |
10/23/2024 9:12:21 | 3044 | Gerald Fowler | Delgado, Alex | Facilities | E544B1A/36AC-001 | Troubleshoot unit with P8 code |
10/23/2024 6:54:49 | 3043 | Colmenares | Cameron, Benjamin | Facilities | 525A | Support contractors while they repair replace Grizzly gate |
10/23/2024 5:34:50 | 3042 | Balbino Mercadal | Keusch, Justen | Facilities | 39A7A | Perform Monthly PM on emergency lighting z W0 |
10/21/2024 9:03:27 | 3041 | Gerald Fowler | Delgado, Alex | Facilities | 72A2A16A/ building 31 environmental chamber outdoor unit. | Perform Pm on building 31 environment chamber outdoor unit |
10/21/2024 8:50:48 | 3040 | Gerald Fowler | Delgado, Alex | Facilities | 368A1A/31 refrigerator test chamber | Perform maintenance on test chamber indoor section of unit |
10/21/2024 8:47:42 | 3039 | Joe pica | Hendrick, Jeffery | Facilities | 06 MCC 001 Circuits 17 and 18 | Switching for pmt crew to perform general maintenance |
10/18/2024 10:30:05 | 3038 | Pete Combs and Michael Chatham | Baird, Shawn | Facilities | 152A-25 | Connect temp AC power to FACP |
10/18/2024 9:32:56 | 3037 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | 31A14A-2 | 1. Disconnect temp power from PAD-3 and reconnect permanent power wires. Permanent power wires are still on LOTO |
10/18/2024 8:50:22 | 3036 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | 31A8A-25 | Connect permanent 120 VAC power circuit, which is still on LOTO, back to Wheelock PAD-3 |
10/18/2024 8:50:14 | 3035 | Capeto | Delgado, Alex | Facilities | 44A1A33A/ 46 AC 040 | PM |
10/18/2024 8:33:09 | 3034 | Capeto | Delgado, Alex | Facilities | 49A2A3A/ 46 AC 027 | PM |
10/18/2024 8:22:25 | 3033 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | 30A2A1B-21 | Remove temporary power from the Starlink and the media converter and wire the permanent power circuit back onto the Starlink and media converter even though building is still on LOTO and Building power is still down until later today. |
10/18/2024 8:21:45 | 3032 | Capeto | Delgado, Alex | Facilities | 44A1B/ 46 AC 031 | PM |
10/18/2024 8:07:52 | 3031 | Robert Ralph | Combs, Everett | Facilities | 347A28A | Open circuit breakers 38, 40,42 to verify circuits in floor box and find information inside floor box. |
10/18/2024 7:37:10 | 3030 | Justin walker | Delgado, Alex | Facilities | E679A-24/ 91-growth chamber 2 | Perform maintenance |
10/17/2024 12:50:14 | 3029 | Gerald Fowler | Delgado, Alex | Facilities | DP 671A9A/91-AC-003 | Pm for 91-AC-003 |
10/17/2024 10:48:53 | 3028 | Pica | Cameron, Benjamin | Facilities | 43KC006 | Commission due to Heat Exchanger |
10/17/2024 8:49:24 | 3027 | Gerald Fowler | Delgado, Alex | Facilities | DP 671A9A12A | Pm for 91-AC-002 |
10/17/2024 8:24:51 | 3026 | Gerald Fowler | Delgado, Alex | Facilities | DP 671A9A12A/91-AC-001 | Pm on 91-AC-001 |
10/17/2024 8:23:14 | 3025 | Antonio Collado | Delgado, Alex | Facilities | E679a/ growth Chamber 1 | Check electrical and components on growth chamber one |
10/16/2024 11:45:09 | 3024 | Gerald Fowler | Delgado, Alex | Facilities | 354A2B | Troubleshoot unit not working |
10/16/2024 9:07:00 | 3023 | Larry Antles | Delgado, Alex | Facilities | 342A1A11A26A/ 80 AC 15 | Loto zvv equipment check and tighten electrical |
10/16/2024 9:01:25 | 3022 | Larry Antles | Delgado, Alex | Facilities | 342A1A11A26A/ 80 AC 14 | Loto zvv equipment check and tighten electrical |
10/16/2024 8:56:34 | 3021 | Larry Antles | Delgado, Alex | Facilities | 342A1A11A26A/80 AC 13 | Loto zvv equipment check and tighten electrical |
10/16/2024 8:50:24 | 3020 | Larry Antles | Delgado, Alex | Facilities | 342A1A11A26A/80 AC 12 | LOTO ZVV check and tighten electrical |
10/15/2024 13:41:30 | 3019 | Alejandro Lopez | Ramer, Robert | Facilities | 501A1A | Provide lighting inside newly installed connex for paint storage outside of building 76 east side. |
10/15/2024 6:52:29 | 3018 | Alma Armenta | Cameron, Benjamin | Facilities | 92A6B | Install data logger in panel 92A6B |
10/14/2024 10:52:15 | 3017 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | 30A2A1B-21 | Plug in temp power from E power outlet into Starlink and Media converter splice |
10/14/2024 8:01:00 | 3016 | Justin walker | Delgado, Alex | Facilities | 49a2a6a-4 | Perform scheduled maintenance |
10/11/2024 10:12:27 | 3015 | Capeto | Delgado, Alex | Facilities | 44A1B/ 46 AC 044 | Troubleshooting |
10/11/2024 7:19:21 | 3014 | Alma Armenta | Cameron, Benjamin | Facilities | 70A1A | Verify phase rotation for bank 70 |
10/10/2024 8:36:33 | 3013 | Colmenares | Cameron, Benjamin | Facilities | PNL 344Ablower disc 001 ac disconnect 001 | Install heaters and test and troubleshooting unit |
10/10/2024 8:17:19 | 3012 | Justin walker | Delgado, Alex | Facilities | 514A6A-3 / 71ac009 | Perform scheduled maint. |
10/10/2024 8:45:06 | 3011 | Capeto | Delgado, Alex | Facilities | 514A2A4A/ 71 AC 005 | PM |
10/10/2024 7:48:11 | 3010 | Colmenares | Cameron, Benjamin | Facilities | PNL-057-59 | Remove LOTO check rotation Reapply LOTO if needed |
10/9/2024 12:14:27 | 3009 | Jeff hendrick | Cameron, Benjamin | Facilities | EG-001-91U | Troubleshoot EG-001-91 controller |
10/10/2024 11:54:19 | 3008 | Mike Chatham and Ed Bekheet | Baird, Shawn | Facilities | E680A. 14 | Put permanent power back to the FACP |
10/9/2024 8:17:31 | 3007 | Colmenares | Cameron, Benjamin | Facilities | E238a1a1a6a | Switching support for PMT On blowers |
10/8/2024 13:24:46 | 3006 | Shane Miller | Secheck, Stephen | Facilities | E31A18A3F-10 | Bring EM circuit power into I.T. closet B70-1101 |
10/8/2024 10:49:19 | 3005 | Colmenares | Cameron, Benjamin | Facilities | PNL-048-84 | Remove LOTO |
10/8/2024 10:21:28 | 3004 | Larry Antles | Delgado, Alex | Facilities | 200A/55 AC 50 | Troubleshoot AC 50 |
10/8/2024 9:29:37 | 3003 | Reynolds/ Turner | Cameron, Benjamin | Facilities | 111A | LOTO CKT 16 and19 and ZVV at lighting J box |
10/8/2024 7:47:22 | 3002 | Colmenares | Cameron, Benjamin | Facilities | Disconnect for KC 8 | LOTO for contractor work |
10/8/2024 8:30:04 | 3001 | Pete Combs and Ed Bekheet | Baird, Shawn | Facilities | E680A. 14 | Putting temporary power on the FACP 91U |
10/7/2024 13:35:26 | 3000 | Balbino Mercadal | Keusch, Justen | Facilities | E346A | Perform Annual PM on emergency lighting |
10/7/2024 10:55:22 | 2999 | Alejandro Lopez | Ramer, Robert | Facilities | 192A | Apply simple LOTO, ZVV and replace one two pole 40 amp breaker and replace it with a three pole 45 AMP beaker inside electrical panel 192A along with pulling old conductors and pull new wires using same raceway. |
10/7/2024 9:02:50 | 2998 | Turner | Cameron, Benjamin | Facilities | E238a1a1a6a33a | Switching support |
10/7/2024 6:45:37 | 2997 | Andrew Southward | Cameron, Benjamin | Facilities | 501A1A | Install Data Logger in Panel |
10/4/2024 11:54:52 | 2996 | Antonio collado | Delgado, Alex | Facilities | M215a5a/ 66-aru-002 | Check aru 002 compressor |
10/4/2024 10:54:25 | 2995 | Alejandro Lopez | Ramer, Robert | Facilities | 368B1A | Replace electrical boxes and convert to dual and quadruplex power receptacles. |
10/4/2024 10:16:06 | 2994 | Capeto | Delgado, Alex | Facilities | M70A4A8A1A/70A ARU 006 | Troubleshooting |
10/4/2024 9:44:12 | 2993 | Robert Ralph | Combs, Everett | Facilities | E362A1A | Close circuit Breaker #10 and verify receptacle is working properly. |
10/4/2024 7:01:44 | 2992 | Colmenares | Hendrick, Jeffery | Facilities | E65A3A Ckt 1 | Replace heads on lighting poles. Switching support |
10/4/2024 6:22:53 | 2991 | AndrewSouthward | Hendrick, Jeffery | Facilities | 218A2AC3A1A | Perform lp-5458 and 5459 |
10/3/2024 14:05:38 | 2990 | Brendan Ford | Other | Other | VENUS Ion Source | To produce electrical safe condition to perform maintenance on the VENUS Ion Source chamber, puller electrode and waveguide assembly. |
10/3/2024 12:50:41 | 2989 | Brendan Ford | Other | Other | DE165 | To produce an electrically safe condition to perform electrical maintenance on the Final Power Amplifier. |
10/3/2024 12:33:28 | 2988 | Colmenares | Hendrick, Jeffery | Facilities | E35b15a1a40a | Switching support for UPS systems |
10/3/2024 11:05:52 | 2987 | Brendan Ford | Other | Other | GE21 | To remove 12kV DC high voltage input to the Cyclotron RF system. |
10/3/2024 9:43:04 | 2986 | Alejandro Lopez | Ramer, Robert | Facilities | 72H | Air gap air compressor inside building 77A. |
10/3/2024 9:35:34 | 2985 | Alejandro Lopez | Ramer, Robert | Facilities | 85E | Air gap polisher and dust collector in room 0156 at building 77. |
10/3/2024 8:54:21 | 2984 | Joe colmenares | Hendrick, Jeffery | Facilities | E35B15A1A46A | Switching and Lotto UPS so the Vendors EATON can perform some maintenance |
10/2/2024 10:52:48 | 2983 | Andrew Southward | Cameron, Benjamin | Facilities | 559A | Install Data Logger in Panel |
10/1/2024 14:07:53 | 2982 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A4A | Investigate/troubleshoot 59-VFD-43 for AHU-19 |
10/1/2024 12:31:21 | 2981 | Shane Miller | Secheck, Stephen | Facilities | 646A1A | Install 3 new receptacles and breakers |
10/1/2024 8:16:08 | 2980 | Joseph Pica | Cameron, Benjamin | Facilities | MCC | PMT AHU PMs |
10/1/2024 8:02:52 | 2979 | Robert Ralph | Combs, Everett | Facilities | 335A | Investigate and remove 120v circuit feeding water fountain |
10/1/2024 6:58:02 | 2978 | Colmenares | Hendrick, Jeffery | Facilities | E671a11a1a9a | Brief, LOTO at E671A11a1a9a ZVV at E773A |
10/1/2024 6:44:29 | 2977 | Alma Armenta | Cameron, Benjamin | Facilities | 245A | Install data logger in panel 245A ckt 2 |
10/1/2024 5:51:12 | 2976 | Balbino Mercadal | Keusch, Justen | Facilities | 90A5A | Perform Annual PM on emergency lighting |
9/30/2024 12:18:56 | 2975 | AndrewSouthward | Hendrick, Jeffery | Facilities | 72A7A9A | Troubleshoot/repair AHU-28 |
9/30/2024 10:46:06 | 2974 | Pica | Hendrick, Jeffery | Facilities | 36A11A | Switching support blower 1 |
9/30/2024 9:51:37 | 2973 | Alma Armenta | Cameron, Benjamin | Facilities | 72A8B | Remove data logger in MCC 72A8B |
9/30/2024 8:03:08 | 2972 | Alejandro Lopez | Ramer, Robert | Facilities | 753A17A | Fix loose power receptacles in room 0161. |
9/30/2024 6:49:29 | 2971 | Colmenares | Hendrick, Jeffery | Facilities | 91-Pw-001 disc | Replace ultraviolet lamps to PW Unit |
9/27/2024 10:09:00 | 2970 | Benjamin Cameron | Cameron, Benjamin | Facilities | 654A | Replace Motor pump assembly. |
9/27/2024 10:07:07 | 2969 | Juan Juarez | Delgado, Alex | Facilities | E564a9a/ cold room 5220 | Replacing temperature controllers for walk in cooler |
9/27/2024 7:57:22 | 2968 | Robert Ralph | Combs, Everett | Facilities | 306A4A, 727A, HPA-1, HPA-2 | Close main 480v CB, close 480 v CB 19,21,23 test for voltage, close 480v CB 20;22,24 test for voltage @ HPA1 & 2 Close CB 7&9 @ 127A test for voltage @ HPA 1&2 |
9/27/2024 6:52:11 | 2967 | Antonio collado | Delgado, Alex | Facilities | 47a3a/74 ac 020 | Troubleshoot ac 20 compressor fault |
9/26/2024 9:22:49 | 2966 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL -40 | Clean inspect VFD seven and VFD eight check fan reset parameters if necessary |
9/26/2024 8:13:50 | 2965 | Capeto | Delgado, Alex | Facilities | EA650A5A1A2A/30 AHU 001 | PM |
9/26/2024 7:29:10 | 2964 | Amsouthward | Cameron, Benjamin | Facilities | 72A1A21A | Replace GP-62 |
9/25/2024 10:42:38 | 2963 | Amsouthward | Cameron, Benjamin | Facilities | 85B28A21 | Troubleshoot kc |
9/25/2024 8:56:38 | 2962 | Andrew Southward | Cameron, Benjamin | Facilities | 31A7G1A | Install Data Logger in Panel |
9/25/2024 8:56:03 | 2961 | pica | Cameron, Benjamin | Facilities | EM30A5A3A | Switching support |
9/24/2024 12:37:07 | 2960 | Joseph pica | Cameron, Benjamin | Facilities | MCC 001 70 | Switching |
9/24/2024 12:18:01 | 2959 | Gerald Fowler | Delgado, Alex | Facilities | E679A1A5A/ cold room 261 | Mode 2 troubleshooting |
9/24/2024 11:47:53 | 2958 | Andrew Southward | Cameron, Benjamin | Facilities | 514A2A7A | Troubleshoot gp 58 |
9/24/2024 9:30:17 | 2957 | AndrewSouthward | Cameron, Benjamin | Facilities | 692A | Reset tripped breaker 692A |
9/24/2024 8:04:58 | 2956 | Andrew Southward | Cameron, Benjamin | Facilities | 304A7A | Install Data Logger in Panel |
9/23/2024 14:06:05 | 2955 | nick gripe | Secheck, Stephen | Facilities | 30A4A5A34A/9 | install new light fixture in breezway |
9/23/2024 13:49:10 | 2954 | Robert Ralph | Keusch, Justen | ALS | E362A1A | Add 30 A two pole twist lock receptacle to existing circuits and jbox in ceiling. |
9/23/2024 9:31:59 | 2953 | Christopher Nelson | Combs, Everett | Facilities | 312A16A | Energize panel 312A16A and verify voltage at new receptacles for pdu |
9/23/2024 8:51:59 | 2952 | AndrewSouthward | Cameron, Benjamin | Facilities | 501A5A3A | Connect furniture whips to designated circuit |
9/20/2024 15:20:30 | 2951 | Alma Armenta | Cameron, Benjamin | Facilities | 662 | Reset tripped breaker in panel 662 |
9/20/2024 8:39:33 | 2950 | Colmenares | Cameron, Benjamin | Facilities | 238A2A5A Ckt 3 | Arc Flash study |
9/20/2024 7:33:13 | 2949 | Andrew Southward | Cameron, Benjamin | Facilities | 217A3A5A10A | Install Data Logger in Panel |
9/19/2024 12:31:44 | 2948 | Antonio collado | Delgado, Alex | Facilities | 3447a/ac -010-76 | Pm on ac 10 |
9/19/2024 8:24:23 | 2947 | Ben cameron | Hendrick, Jeffery | Facilities | 596A1A5A | Establish LP-5419 |
9/19/2024 8:04:38 | 2946 | Colmenares | Cameron, Benjamin | Facilities | 357A1A | Test emergency generator |
9/19/2024 7:54:21 | 2945 | Andrew Southward | Cameron, Benjamin | Facilities | E65A4A | Perform Lp-5423 |
9/18/2024 11:51:56 | 2944 | Amsouthward | Cameron, Benjamin | Facilities | 753A | Inspect main breaker 753A and panel for cause of trip |
9/18/2024 9:11:47 | 2943 | Pica | Cameron, Benjamin | Facilities | M70A4A8A | Switching support PMT |
9/18/2024 8:00:59 | 2942 | Andrew Southward | Cameron, Benjamin | Facilities | 305A4A1A1A | Install Data Logger in Panel |
9/18/2024 7:45:45 | 2941 | Andrew Southward | Cameron, Benjamin | Facilities | 456A1A | Remove data loggers |
9/18/2024 7:44:50 | 2940 | Ben Reynolds / Joko | Cameron, Benjamin | Facilities | 503A5A | Rotation and Voltage Check Panel 503A5A Busway |
9/18/2024 6:51:57 | 2939 | Andrew Southward | Cameron, Benjamin | Facilities | M305A4A6A | Install Data Logger in Panel |
9/17/2024 7:07:26 | 2938 | Ben Cameron | Cameron, Benjamin | Facilities | 36A3A10A/46 | LOTO Ion meter |
9/16/2024 13:40:24 | 2937 | Balbino Mercadal | Keusch, Justen | Facilities | E542A10A | Perform Annual PM on emergency lighting |
9/16/2024 7:21:31 | 2936 | AndrewSouthward | Cameron, Benjamin | Facilities | 66A1A | Replace starter for ahu-6 |
9/13/2024 13:09:51 | 2935 | Balbino Mercadal | Keusch, Justen | Facilities | E410A22A1A | Perform Annual PM on emergency lighting |
9/13/2024 13:07:06 | 2934 | Shane Miller | Secheck, Stephen | Facilities | 200A ckt 11 | Installing new fixtures on roof to light pathway to elevator machine room |
9/13/2024 7:10:17 | 2933 | Andrew Southward | Cameron, Benjamin | Facilities | 652A1A | Install Data Logger in Panel |
9/13/2024 6:44:18 | 2932 | Travis Ray and Ed Bekheet | Baird, Shawn | Facilities | 79A-PNL-002. E732A | Swap out heat detector in shed 79L. |
9/12/2024 13:19:43 | 2931 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2B2A | Perform Monthly PM on emergency and replace bad emergency lighting fixture |
9/12/2024 8:34:34 | 2930 | AndrewSouthward | Cameron, Benjamin | Facilities | 64-AHU-003 DISC | Switching support for PMT’s |
9/12/2024 8:21:05 | 2929 | Alma Armenta | Cameron, Benjamin | Facilities | 562A | Replace 67-BL-015 |
9/11/2024 13:26:51 | 2928 | Balbino Mercadal | Keusch, Justen | Facilities | 147A1B | Perform Annual PM on emergency lighting |
9/11/2024 13:11:22 | 2927 | Balbino Mercadal | Keusch, Justen | Facilities | 262A4A | Perform Annual PM on emergency lighting |
9/11/2024 8:00:49 | 2926 | Cameron | Cameron, Benjamin | ALS | HVJO1 | Enter manhole and pull DC Cable through |
9/11/2024 7:41:43 | 2925 | Alma Armenta | Cameron, Benjamin | Facilities | 238A9A | Establish LP-5390 |
9/10/2024 13:00:40 | 2924 | AndrewSouthward | Cameron, Benjamin | Facilities | 546A7A | Troubleshoot VFD for AHU-2-15 return |
9/10/2024 13:00:06 | 2923 | Balbino Mercadal | Keusch, Justen | Facilities | 49A3A3A | Perform Annual PM on emergency lighting |
9/10/2024 12:00:31 | 2922 | Gerald fowler | Delgado, Alex | Facilities | 25A18A/50-AC-027 | Pm for 50-AC-027 |
9/10/2024 9:10:18 | 2921 | Gerald Fowler | Delgado, Alex | Facilities | 66A8A/62-AC-011 | Pm on 62-AC-011 |
9/10/2024 8:13:52 | 2920 | Ben Cameron | Cameron, Benjamin | Facilities | 728AB | Switch on 77-ARU-6 |
9/10/2024 7:26:44 | 2919 | Joseph Colmenares | Cameron, Benjamin | Facilities | 31A15B | GP-007, 8, 6 pump replacement |
9/10/2024 7:08:43 | 2918 | Capeto | Delgado, Alex | Facilities | EM66A9A1A1A5KA/ 62 AC 010 | PM |
9/10/2024 6:53:52 | 2917 | Justin Solis | Delgado, Alex | Facilities | 172a12a/ac-002-71c | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
9/9/2024 12:56:13 | 2916 | Alma Armenta | Cameron, Benjamin | Facilities | M218A1A | Replace VFD for 37-GP-138 |
9/9/2024 9:08:44 | 2915 | Andrew Southward | Cameron, Benjamin | Facilities | M304A3A5A32A | Install Data Logger in Panel |
9/9/2024 7:23:30 | 2914 | Joe colmenares | Cameron, Benjamin | Facilities | 39A2A | Remove LOTTO. 5242 for emergency sign |
9/7/2024 6:10:04 | 2913 | Ben Cameron | Cameron, Benjamin | Facilities | 72A | Replace 600 amp main breaker in MCC 72A8B |
9/6/2024 13:37:16 | 2912 | Balbino Mercadal | Keusch, Justen | Facilities | 33A | Perform Annual PM on emergency lighting |
9/6/2024 13:28:59 | 2911 | Balbino Mercadal | Keusch, Justen | Facilities | E536A | Perform Annual PM on emergency lighting |
9/6/2024 13:09:24 | 2910 | Shane Miller | Secheck, Stephen | Facilities | 631A15A9A | Demo abandoned rigid conduit in walkway for future asphalt repairs. |
9/6/2024 13:04:07 | 2909 | Alejandro Lopez | Ramer, Robert | Facilities | 35A2B | Troubleshoot roll up screen switch not working in main conference room on 5th floor. |
9/6/2024 12:55:16 | 2908 | Shane Miller | Secheck, Stephen | Facilities | 654A | LOTO circuit to replace bad GFCI device |
9/6/2024 12:21:56 | 2907 | Juan juarez | Delgado, Alex | Facilities | 147A1A/46AAC014 | Replacement of compressor connectors |
9/6/2024 8:05:42 | 2906 | Andrew Southward | Cameron, Benjamin | Facilities | 501A1A | Install Data Logger in Panel |
9/6/2024 7:42:25 | 2905 | Colmenares | Cameron, Benjamin | Facilities | 25A4C | Switching support for PMT’s |
9/6/2024 7:18:21 | 2904 | Colmenares | Cameron, Benjamin | Facilities | 36A3A Ckt 10 | Standby TO Assist contractors on troubleshooting ION meter. |
9/5/2024 13:24:49 | 2903 | Shane Miller | Secheck, Stephen | Facilities | 638A3A | Shut down panel and pull in new circuits for cubicles |
9/5/2024 12:12:34 | 2902 | Andrew Southward | Cameron, Benjamin | Facilities | VFD-71-CT004 | Troubleshoot no power to VFD control cabinet |
9/5/2024 8:48:14 | 2901 | Colmenares | Cameron, Benjamin | Facilities | 308A | Assist FMCS with power meter replacement |
9/5/2024 6:31:10 | 2900 | AndrewSouthward | Cameron, Benjamin | Facilities | 66A2A | Perform LP-5365 |
9/4/2024 18:09:19 | 2899 | Keola Baclayon | Other | Other | 39A5A / PNL-022-72 | ZVV eConntect box for Group LOTO overlocking crafts admin lock |
9/27/2024 9:26:32 | 2898 | Ben Cameron | Cameron, Benjamin | Facilities | PNl EM357A1A7A1A/D2 | Belt replacement |
9/3/2024 7:47:56 | 2897 | Ben cameron | Hendrick, Jeffery | Facilities | 266A33A | Motor replacement |
9/3/2024 7:36:35 | 2896 | Antonio collado | Delgado, Alex | Facilities | 217A1A3A/69AC06 | Preventive maintenance |
9/3/2024 7:27:42 | 2895 | Justin walker | Delgado, Alex | Facilities | E389A-2 | Perform scheduled maintenance |
9/3/2024 7:13:01 | 2894 | Colmenares | Cameron, Benjamin | Facilities | 266A33A | Replace motor |
8/30/2024 7:33:24 | 2893 | Gerald Fowler | Delgado, Alex | Facilities | 251A/02-ARU-001 /CH-1A | Loto breaker and valves then replace flow switch |
8/30/2024 7:29:26 | 2892 | Andrew Southward | Cameron, Benjamin | Facilities | 87D | Install Data Logger in Panel |
8/30/2024 7:13:34 | 2891 | Colmenares | Cameron, Benjamin | Facilities | E238a1a1a6a34a Ckt 9 | Replace and test Blower 7 VFD |
8/30/2024 6:27:43 | 2890 | Andrew Southward | Cameron, Benjamin | Facilities | VFD-001-70 | Install Data Logger in Panel |
8/29/2024 12:23:13 | 2889 | Alma Armenta | Cameron, Benjamin | Facilities | E238A1A1A6A34A | Troubleshoot VFD & motor for 2-BL-07 |
8/29/2024 8:29:33 | 2888 | Andrew Southward | Cameron, Benjamin | Facilities | 193A2A21A | Demo transformer in room 167A |
8/29/2024 7:23:05 | 2887 | Alma Armenta | Cameron, Benjamin | Facilities | EM304A3A1A | Install data logger in EM304A3A1A transfer switch |
8/29/2024 7:17:09 | 2886 | Ben Cameron | Cameron, Benjamin | Facilities | 72A4A/20 | Simple LOTO, roll up door installation inspection |
8/29/2024 6:02:43 | 2885 | Alma Armenta | Cameron, Benjamin | Facilities | M218A1A | Troubleshoot 37-GP-138 |
8/28/2024 9:08:00 | 2884 | Brendan Ford | Other | Other | CB 15 in panel 80A4A6A | Open Gyrotron cabinet and remove Magnet power Supply for inspection and repair. |
8/28/2024 8:24:12 | 2883 | AndrewSouthward | Cameron, Benjamin | Facilities | 420A6A1A11A | Repair/replace VFD for ahu-1 |
8/28/2024 8:02:17 | 2882 | Capeto | Delgado, Alex | Facilities | 99A6A/90 AC 031 | PM |
8/28/2024 7:57:46 | 2881 | Colmenares | Cameron, Benjamin | Facilities | 72A4A-20 | Contractors replacing motor on rollup door |
8/28/2024 7:08:57 | 2880 | Colmenares | Cameron, Benjamin | Facilities | E65A | Air gap panels 65 a and 65B to allow for demolition |
8/28/2024 6:38:44 | 2879 | AndrewSouthward | Cameron, Benjamin | Facilities | 66A2A | Implement LP-5366 |
8/27/2024 13:23:46 | 2878 | Balbino Mercadal | Keusch, Justen | Facilities | 491A10A | Replace lights out B88-236 |
8/27/2024 10:16:48 | 2877 | Antonio Collado | Delgado, Alex | Facilities | 550a1a/ aru -001 -67 | Troubleshoot aru 001 |
8/27/2024 10:11:33 | 2876 | Justin Solis | Delgado, Alex | Facilities | E30a5a7a31a-21/br-17-70a | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/27/2024 8:34:53 | 2875 | Gerald Fowler | Delgado, Alex | Facilities | E43A1A/26-A/C-017 | Pm on A/C unit |
8/27/2024 7:34:00 | 2874 | AndrewSouthward | Cameron, Benjamin | Facilities | 478A | Troubleshoot tripped breaker for BL-128 |
8/27/2024 6:58:45 | 2873 | AndrewSouthward | Cameron, Benjamin | Facilities | 59-VFD-001 | Replace BL-001 |
8/26/2024 10:17:36 | 2872 | Andrew Southward | Cameron, Benjamin | Facilities | 31A7G1A | Install Data Logger in Panel |
8/26/2024 9:39:18 | 2871 | Andrew Southward | Cameron, Benjamin | Facilities | EM66A9A1A | Install Data Logger in Panel |
8/26/2024 9:08:40 | 2870 | Andrew Southward | Cameron, Benjamin | Facilities | 559A | Install Data Logger in Panel |
8/23/2024 12:48:36 | 2869 | Balbino Mercadal | Keusch, Justen | Facilities | 491A10A | Perform Monthly PM on emergency lighting |
8/23/2024 11:26:14 | 2868 | Colmenares | Cameron, Benjamin | Facilities | 77A | Release Crane LOTO |
8/23/2024 9:19:57 | 2867 | Colmenares | Cameron, Benjamin | Facilities | 238A | Stand by switchgear in case RI needs power off in an emergency |
8/23/2024 7:16:51 | 2866 | AndrewSouthward | Cameron, Benjamin | Facilities | E38A9A | Take rotation checks on all loads leaving E38A9A |
8/22/2024 9:19:38 | 2865 | Colmenares | Cameron, Benjamin | Facilities | PNL -001-77A | Lock out crane number four for contractors to replace festoon wiring |
8/22/2024 9:16:35 | 2864 | Andrew Southward | Cameron, Benjamin | Facilities | 59-VFD-003 | Replace motor for BL-3 |
8/21/2024 9:51:35 | 2863 | Andrew Southward | Cameron, Benjamin | Facilities | 245A5A28A | Reset Breaker |
8/21/2024 9:30:13 | 2862 | Larry Antles | Delgado, Alex | Facilities | 99A2A/90 AC32 | PM B90 AC 32 |
8/21/2024 7:38:52 | 2861 | Chris Nelson | Combs, Everett | ALS | 302A3A/317A | Switch panel 302A3A circuit 3 Bank 317. ZVV Panel 317A for Demo re configuration of BA racks S504-S508 |
8/20/2024 12:07:13 | 2860 | Balbino Mercadal | Keusch, Justen | Facilities | 100A | Perform Annual PM on emergency |
8/20/2024 10:10:19 | 2859 | Balbino Mercadal | Keusch, Justen | Facilities | 15A15A57A | Perform Annual PM on emergency lighting |
8/20/2024 7:48:04 | 2858 | Amsouthward | Cameron, Benjamin | Facilities | M550A1A4A | Pm VFD for cooling tower 1 |
8/20/2024 7:22:27 | 2857 | Alejandro Lopez | Combs, Everett | Facilities | 310A | Air gap cooling fan inside ALS pit area. |
8/19/2024 12:57:26 | 2856 | Williams | Other | Other | HP-101, HP-102 | Enter Multistack HP-101 and HP-103 and make observations |
8/19/2024 12:41:36 | 2855 | Williams | Other | Other | 92-HP-104, 105, 106 | Visual observations HP-104, HP-105, HP-106 |
8/19/2024 10:58:45 | 2854 | Capeto | Delgado, Alex | Facilities | 492A6A/55 AC 21 | Replacing IFM |
8/19/2024 9:18:38 | 2853 | AndrewSouthward | Cameron, Benjamin | Facilities | 31A | Troubleshoot ARU-2-70A |
8/19/2024 8:49:25 | 2852 | Cameron | Cameron, Benjamin | Facilities | 303Aswitchgear | Rockin breaker 303 A2 |
8/19/2024 7:49:22 | 2851 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A11A/55-AC-035 | Troubleshoot unit not functioning correctly |
8/16/2024 10:49:03 | 2850 | Gerald Fowler | Delgado, Alex | Facilities | 218A2Ac3A1A-22/ 43 ac 002 | Perform scheduled pm |
8/16/2024 10:45:33 | 2849 | Alejandro Lopez | Ramer, Robert | Facilities | 482A | Fix broken latch on EV charger and replace EV charger. |
8/16/2024 10:37:18 | 2848 | Justin walker | Delgado, Alex | Facilities | 218a2Ac3A1A-16/ 43 ac001 | Perform scheduled pm |
8/16/2024 7:12:05 | 2847 | Colmenares | Hendrick, Jeffery | Facilities | 188A1A | Loto out Fune hood |
8/15/2024 12:45:54 | 2846 | Gerald Fowler | Delgado, Alex | Facilities | M70A4A8A1A/70A -ARU-006 | Pm for small chiller |
8/15/2024 9:27:13 | 2845 | Gerald Fowler | Delgado, Alex | Facilities | 49A2A3A /46-AC-48 | Pm on rooftop unit |
8/15/2024 9:24:21 | 2844 | Larry Antles | Delgado, Alex | Facilities | 49A2A3A, B46 AC 47 | PM AC 47 |
8/15/2024 9:14:58 | 2843 | Gerald Fowler | Delgado, Alex | Facilities | 49A3A3A/46-AC-49 | Pm for rooftop ac unit |
8/15/2024 8:25:56 | 2842 | Gerald Fowler | Delgado, Alex | Facilities | 48A45A/46-A/C-026 | Pm on wall hung A/C unit |
8/14/2024 15:19:35 | 2841 | Larry Antles | Delgado, Alex | Facilities | 251A/B2 ARU001 | Replace ARU001 flow switch |
8/14/2024 13:29:44 | 2840 | Antonio Collado | Delgado, Alex | Facilities | 229a/ ac 35-90 | Pm on ac unit |
8/14/2024 10:37:45 | 2839 | Larry Antles | Delgado, Alex | Facilities | 37EA/B75 AC 17 | leak check equipment |
8/14/2024 10:25:57 | 2838 | Alejandro Lopez | Ramer, Robert | Facilities | M66A4A-4 POWER DISCONNECT | Assist PMT's with replacing an air compressor pressure switch. |
8/14/2024 9:21:34 | 2837 | Andrew Southward | Cameron, Benjamin | Facilities | 456A1A | Install Data Logger in Panel |
8/14/2024 9:06:01 | 2836 | Alma Armenta | Cameron, Benjamin | Facilities | 305A4A1A1A | Install data logger in panel 305A4A1A1A |
8/14/2024 7:43:23 | 2835 | Colmenares | Cameron, Benjamin | Facilities | 18A9A Ckt 26 | Replace motor for AHU 26 |
8/14/2024 6:59:53 | 2834 | Capeto | Delgado, Alex | Facilities | 50A1A/ 46B AC 003 | Replace OFM |
8/13/2024 12:57:32 | 2833 | Justin Solis | Delgado, Alex | Facilities | 90a9a-10/ac-28-90 | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/13/2024 8:59:03 | 2832 | Antonio collado | Delgado, Alex | Facilities | E679a1a5a/ 262 condenser / control panel | Pm walk in 262 |
8/13/2024 7:59:14 | 2831 | Sayee Chea | Keusch, Justen | Facilities | 72D39A | Replacing LED light fixtures in the highbay |
8/13/2024 6:05:18 | 2830 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A4A | Perform Monthly PM on emergency lighting |
8/12/2024 13:42:37 | 2829 | Alejandro Lopez | Ramer, Robert | Facilities | 555A3A | Install new power booster transformer in room 1208 at building 67. |
8/12/2024 11:47:18 | 2828 | Antonio Collado | Delgado, Alex | Facilities | E679a1a5a/ envir cond / control | Pm on walk in cooler |
8/12/2024 7:58:56 | 2827 | Justin walker | Delgado, Alex | Facilities | E38A9A-4/ 50B ac 29 | Perform scheduled maintenance |
8/9/2024 13:35:42 | 2826 | Balbino Mercadal | Keusch, Justen | Facilities | 230A | Emergency lighting fixture stuck to an on position will not turn off |
8/9/2024 10:52:02 | 2825 | AndrewSouthward | Cameron, Benjamin | Facilities | 306A4A | Perform switching for ALS |
8/9/2024 8:18:47 | 2824 | Capeto | Delgado, Alex | Facilities | 388698/ 90A9A | PM |
8/9/2024 8:12:41 | 2823 | Capeto | Delgado, Alex | Facilities | 90 A9A/ 90 AC 048 | PM |
8/9/2024 7:41:22 | 2822 | Capeto | Delgado, Alex | Facilities | 92A4A/ 90 AC 030 | PM |
8/9/2024 6:57:35 | 2821 | Gerald Fowler | Delgado, Alex | Facilities | 514A1A/71-AHU-037 | Replace failed blower motor |
8/8/2024 13:27:09 | 2820 | Balbino Mercadal | Keusch, Justen | Facilities | 230A | Perform Annual PM on emergency lighting |
8/8/2024 13:18:48 | 2819 | Balbino Mercadal | Keusch, Justen | Facilities | 218A2AC3A1A | Perform Monthly PM on emergency lighting |
8/8/2024 12:55:58 | 2818 | Gerald Fowler | Delgado, Alex | Facilities | 212A/55A-AC-003 | Pm for 55A-AC-003 |
8/8/2024 9:54:09 | 2817 | Justin walker | Delgado, Alex | Facilities | 84b ac 002 / 491a9a-3 | Perform scheduled maintenance |
8/8/2024 9:52:02 | 2816 | Justin Solis | Delgado, Alex | Facilities | 491a4a | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/8/2024 9:46:12 | 2815 | Justin walker | Delgado, Alex | Facilities | 85b ac 001 | Perform scheduled maintenance |
8/8/2024 9:43:53 | 2814 | Justin Solis | Delgado, Alex | Facilities | 491a10a/ac-003-85b | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/7/2024 14:44:26 | 2813 | 045577 | Delgado, Alex | Facilities | ARU009 | Troubleshoot circuit#2 not working |
8/7/2024 13:45:39 | 2812 | Alejandro Lopez | Ramer, Robert | Facilities | UE590A8A4A | Install new lights under catwalks at building 59 room 1001. |
8/7/2024 8:23:12 | 2811 | Justin Solis | Delgado, Alex | Facilities | 513a7a11b1a/Ac-46-55 | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/7/2024 8:21:29 | 2810 | Colmenares | Cameron, Benjamin | Facilities | 650A2A -7 | Replace solenoid valve MP 1 and MP2 |
8/7/2024 7:54:24 | 2809 | Ernie Jew | Grounds, Jeff | Comp Sci | 590A21A | Replace power module for PDU 26 display |
8/6/2024 9:01:12 | 2808 | Capeto | Delgado, Alex | Facilities | 413A7A11B1A/379228 | PM |
8/6/2024 7:51:59 | 2807 | Capeto | Delgado, Alex | Facilities | 55 AC 046/ 513A7A11B1A | PM |
8/6/2024 7:17:55 | 2806 | Andrew Southward | Cameron, Benjamin | Facilities | 296A | Install Data Logger in Panel |
8/6/2024 6:48:52 | 2805 | Alejandro Lopez | Ramer, Robert | Facilities | 190A3A3A | Apply simple LOTO to circuit 7 in order to re-wire egress lighting in room 328. |
8/6/2024 6:38:19 | 2804 | Andrew Southward | Cameron, Benjamin | Facilities | M305A4A6A | Install Data Logger in Panel |
8/5/2024 13:57:10 | 2803 | Shane Miller | Secheck, Stephen | Facilities | 190A2A39A | Upgrade egress lighting and convert from 120v power, 277v power and tie them to existing lighting in lab 328 |
8/5/2024 12:33:37 | 2802 | Capeto | Delgado, Alex | Facilities | 27A / 78 AC 001 | Troubleshooting tripped CB |
8/5/2024 9:05:42 | 2801 | Ernie Jew | Grounds, Jeff | Comp Sci | 590A21A | Replace display power module for PDU 28 |
8/5/2024 6:52:25 | 2800 | Colmenares | Cameron, Benjamin | Facilities | E655A-17 | Replace block heater for generator at Bill and 30 |
8/2/2024 12:01:45 | 2799 | Colmenares | Cameron, Benjamin | Facilities | 80A3A | ZVV panel 80 Alpha three alpha for first exposure |
8/2/2024 8:43:07 | 2798 | Sayee Chea | Keusch, Justen | Facilities | 566A10A | Replacing lamps and ballasts |
8/2/2024 7:30:31 | 2797 | Larry Antles | Delgado, Alex | Facilities | 185A/69 AC001 | Pm ACoo1 |
8/1/2024 13:21:56 | 2796 | Balbino Mercadal | Keusch, Justen | Facilities | 253B1A33A39A | Perform Monthly PM on emergency lighting |
8/1/2024 12:02:26 | 2795 | Ernie Jew | Grounds, Jeff | Comp Sci | 590A21A | Replace display power module at PDU 28 |
8/1/2024 11:57:12 | 2794 | Ernie Jew | Grounds, Jeff | Comp Sci | 590A21A | Replace display power module for PDU 26 |
8/1/2024 9:59:34 | 2793 | Ben Cameron | Cameron, Benjamin | Facilities | 246A4A10A | Investigate water leak to wire mold circuit fed from panel 246A4A10A |
8/1/2024 8:34:14 | 2792 | Erik Line | Keusch, Justen | Facilities | Bank 82 Disconnect and Panel 82A | Establish LP 5325 for Contractor |
7/31/2024 8:41:55 | 2791 | Capeto | Delgado, Alex | Facilities | 631A4A/ 56A AC 003 | PM |
7/31/2024 8:34:26 | 2790 | Capeto | Delgado, Alex | Facilities | 631A21A/ 56A AC 001 | PM |
7/31/2024 8:24:18 | 2789 | Juan juarez | Delgado, Alex | Facilities | 631A15A/56AAC006 | Preventive maintenance |
7/31/2024 8:16:51 | 2788 | Juan juarez | Delgado, Alex | Facilities | 631A9A/56AAC004 | Preventive maintenance |
7/31/2024 8:09:05 | 2787 | Juan juarez | Delgado, Alex | Facilities | 631A3A/56AAC002 | Preventive maintenance |
7/31/2024 8:03:08 | 2786 | Sayee Chea | Keusch, Justen | Facilities | 514A2A4A14A | Will be replacing HID light fixtures with LED fixtures |
7/30/2024 7:12:03 | 2785 | Justin walker | Delgado, Alex | Facilities | 309A | replace wiring harness in control panel |
7/29/2024 11:55:23 | 2784 | Colmenares | Cameron, Benjamin | Facilities | 25A2B | Investigate cause of outlet arc flashing. |
7/29/2024 10:55:34 | 2783 | Juan juarez | Delgado, Alex | Facilities | 37EC | Installing filters and belt |
7/29/2024 8:32:20 | 2782 | Capeto | Delgado, Alex | Facilities | 200A | Troubleshooting chattering contactor |
7/28/2024 10:06:00 | 2781 | Ernie Jew | Grounds, Jeff | Comp Sci | UPS 1 & 2 | Repair UPS 2 UPM |
7/26/2024 13:48:00 | 2780 | Balbino Mercadal | Keusch, Justen | Facilities | 90A1A | Perform Monthly PM on emergency lighting |
7/26/2024 9:53:16 | 2779 | nick gripe | Secheck, Stephen | Facilities | 266A/27, 266A27A | remove wires that fed the range in the break room and update the panel schedule, making circuit 42 a spare breaker. |
7/26/2024 8:08:50 | 2778 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL- 040 | Clean inspect Magan test VFD 12&3 |
7/26/2024 6:58:19 | 2777 | AndrewSouthward | Cameron, Benjamin | Facilities | 301A2A | Remove logger from 301A2A |
7/25/2024 9:09:43 | 2776 | Christopher Nelson | Combs, Everett | ALS | 647A7A | LOTO and ZVV for work starting tomorrow |
7/25/2024 8:57:28 | 2775 | AndrewSouthward | Cameron, Benjamin | Facilities | 512A7AD1A | Replace motor BL-14 |
7/25/2024 8:48:59 | 2774 | Sayee Chea | Keusch, Justen | Facilities | 72A2B | Replacing |
7/25/2024 8:40:02 | 2773 | Ben Cameron | Cameron, Benjamin | Facilities | E30A5A7A31A circuits | Establish LOTOs LP-5323 & 5324 Boiler Repair |
7/25/2024 7:51:06 | 2772 | Andrew Southward | Cameron, Benjamin | Facilities | 559A4A | Install Data Logger in Panel |
7/24/2024 7:17:56 | 2771 | Alma Armenta | Cameron, Benjamin | Facilities | 38A11A / 38A11A27A | Establish LP-5251 |
7/23/2024 15:07:19 | 2770 | Larry Antles | Delgado, Alex | Facilities | 47A1A1A/83 ARU 002 | Troubleshoot B83 ARU 002 |
7/23/2024 14:00:38 | 2769 | greg neidiger | Ramer, Robert | Facilities | E155A1A/28 | Remove whip and unsecured floor receptacle. |
7/23/2024 8:21:44 | 2768 | Capeto | Delgado, Alex | Facilities | 671A9A/ 91 AC 004 | Leak repair on suction line accumulater |
7/23/2024 8:15:47 | 2767 | Colmenares | Cameron, Benjamin | Facilities | VFD-1-56 | Replace motor on roof because of bad variance |
7/22/2024 12:20:43 | 2766 | Gerald Fowler | Delgado, Alex | Facilities | M460A1A/portable chiller | Determine where to land low voltage start/stop and alarm wires for BMS system |
7/22/2024 10:27:43 | 2765 | Capeto | Delgado, Alex | Facilities | 83 ARU 002 | Troubleshooting |
7/22/2024 9:51:40 | 2764 | Greg Neidiger | Ramer, Robert | Facilities | 95A | Visual inspection of panel 95A |
7/22/2024 5:18:58 | 2763 | Colmenares | Cameron, Benjamin | Facilities | 217A1A1A | Perform Mechanical lotto for building 69 conveyor |
7/18/2024 7:36:19 | 2762 | Antonio Collado | Delgado, Alex | Facilities | 95b-b21a/ ac 007-62 | Replace blower motor |
7/18/2024 7:35:31 | 2761 | Ben Cameron | Cameron, Benjamin | Facilities | 85-TSW-001 | Replace U timer under EEWP-12 |
7/17/2024 13:56:41 | 2760 | Balbino Mercadal | Keusch, Justen | Facilities | 263A2A | Replace burnt sockets |
7/17/2024 7:38:38 | 2759 | Alma Armenta | Cameron, Benjamin | Facilities | KC-005-43 DISC / KC-006-43 DISC | Support for commissioning of KC-005-43 and KC-006-43 |
2024.12.19.3