1000 Latest Entries from 4127 Total Records
Date | JSP ID | PIC | Supervisor | Division | Panel / Equipment ID | Scope of Work |
---|---|---|---|---|---|---|
9/19/2025 7:18:10 | 4127 | Antonio collado | Delgado, Alex | Facilities | 723a/ 92 ahu 005 | Troubleshoot ahu 005 |
9/19/2025 7:07:56 | 4126 | Gerald Fowler | Delgado, Alex | Facilities | 25A1A10A/6 - 50BR007 | Low water cut off replacement |
9/18/2025 9:27:27 | 4125 | Avery J Turner | Cameron, Benjamin | Facilities | E460A5A1A10A-4; 5 | PMT Switching and LOTO support |
9/18/2025 8:57:14 | 4124 | Capeto | Delgado, Alex | Facilities | 25A1A/ 50 AC 017 | Troubleshooting controls |
9/18/2025 8:17:04 | 4123 | AndrewSouthward | Cameron, Benjamin | Facilities | E155A1A | Perform LP-5736 |
9/17/2025 9:12:13 | 4122 | AndrewSouthward | Cameron, Benjamin | Facilities | 33 DI skid | Check voltage for puretec |
9/17/2025 8:57:27 | 4121 | Juan Juárez | Delgado, Alex | Facilities | 72A7A3A/27 - 77AHU035 | Troubleshooting noise AHU |
9/17/2025 8:43:49 | 4120 | Alma Armenta | Cameron, Benjamin | Facilities | 47a3a69a-12 | Support with vacuum pump replacement 74-MP-009 |
9/16/2025 12:55:48 | 4119 | Balbino Mercadal | Keusch, Justen | Facilities | E542A9A | Perform Annual PM on emergency lighting |
9/16/2025 9:28:38 | 4118 | AndrewSouthward | Cameron, Benjamin | Facilities | 37-ct-102 | Troubleshoot inspect possible cause for VFD overheating |
9/16/2025 6:52:44 | 4117 | AndrewSouthward | Cameron, Benjamin | Facilities | E700A1A | Swap ct wires on swgr E700A1A |
9/15/2025 13:04:06 | 4116 | Ari Harding | Other | Other | SHARP 1118H-CNC fed from 83A-27 | Commission replacement VFD for Sharp Lathe |
9/15/2025 12:13:21 | 4115 | AndrewSouthward | Cameron, Benjamin | Facilities | 420A7A1A | Verify correct ct orientation for bank 39 dent meter |
9/15/2025 9:09:06 | 4114 | Justin Solos | Delgado, Alex | Facilities | Em357a1a7a1ac3a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
9/15/2025 9:47:45 | 4113 | Alma Armwnta | Cameron, Benjamin | Facilities | 309A | Install conduit for 34-ARU-3 |
9/15/2025 7:47:06 | 4112 | Larry Antles | Delgado, Alex | Facilities | 218A2AC3A1A/B43 KC 004 | Replace B43 ADR 004 |
9/15/2025 7:14:22 | 4111 | AndrewSouthward | Cameron, Benjamin | Facilities | 66A2A | Establish LP-5863 |
9/12/2025 8:07:35 | 4110 | Ben Cameron | Hendrick, Jeffery | Facilities | E719A27 | Establish LOTO |
9/11/2025 13:28:12 | 4109 | Balbino Mercadal | Keusch, Justen | Facilities | 230A | Perform Monthly PM on emergency lighting |
9/11/2025 10:41:09 | 4108 | Justin walker | Delgado, Alex | Facilities | 309A2/34 Ari 003 | Assist JCI with running chiller and checking new vsd opertions. |
9/11/2025 8:38:54 | 4107 | Capeto | Delgado, Alex | Facilities | 66A/ 62 ARU 007 | Replace flow switch on condenser loop |
9/11/2025 8:08:55 | 4106 | Alma Armenta | Cameron, Benjamin | Facilities | 66A | Rack out ARU-007 breaker for HVAC |
9/10/2025 11:27:26 | 4105 | AndrewSouthward | Cameron, Benjamin | Facilities | E700A1A2A2A/10A | Verify panel feeders |
9/9/2025 10:17:34 | 4104 | Alma Armenta | Cameron, Benjamin | Facilities | 77-SKD-1 | Troubleshoot VFD for GP-53 |
9/9/2025 9:52:30 | 4103 | Christopher Nelson | Keusch, Justen | Facilities | 302A4A | Release LOTO |
9/8/2025 14:27:08 | 4102 | Capeto | Delgado, Alex | Facilities | 147A1A/ 46A AC 011 | Replace indoor fan motor |
9/8/2025 12:57:14 | 4101 | Avery Turner | Cameron, Benjamin | Facilities | 38A | Switching |
9/8/2025 8:50:53 | 4100 | AndrewSouthward | Cameron, Benjamin | Facilities | 217A1A1A | Replace dames cable on conveyor belt |
9/8/2025 8:03:20 | 4099 | S Sechak | Ramer, Robert | Facilities | 215A | Switch, rack out, ZVV, pull wire, install breaker, release. |
9/8/2025 7:49:21 | 4098 | Avery Turner | Cameron, Benjamin | Facilities | M460a1a | Arc flash study |
9/8/2025 7:15:11 | 4097 | Shane Miller | Combs, Everett | Facilities | 311A | Loto panel 311A,ZVV panel 311A. Pull in new feeders panel 311A34A |
9/8/2025 7:09:47 | 4096 | Alma Armenta | Cameron, Benjamin | Facilities | 99A8A ckt 4 | Establish LP-5884 |
9/5/2025 10:31:34 | 4095 | Alma Armenta | Cameron, Benjamin | Facilities | M309A7A | Replace comm card on VFD 2 34 for GP-006 |
9/5/2025 7:28:19 | 4094 | Alma Armenta | Cameron, Benjamin | Facilities | 357A3A | Replace sealtight on 86-BR-002 |
9/5/2025 7:22:37 | 4093 | Kevin hope | Combs, Everett | ALS | 302a3a | Punch hole and install conduit wire and circuit breaker in panel 315a |
9/5/2025 6:55:04 | 4092 | Ben Cameron | Cameron, Benjamin | Facilities | PNL 670A | Wreck out breaker number five for HES switch for E650858 |
9/4/2025 14:06:25 | 4091 | Balbino Mercadal | Keusch, Justen | Facilities | Q47A1B | Perform Annual PM on emergency lighting |
9/4/2025 13:59:16 | 4090 | Balbino Mercadal | Keusch, Justen | Facilities | 49A2A6A | Perform Annual PM on emergency lighting |
9/4/2025 13:49:53 | 4089 | Balbino Mercadal | Grounds, Jeff | Facilities | 621A | Replace bad wall sensor switch |
9/4/2025 13:19:24 | 4088 | Alma Armenta | Cameron, Benjamin | Facilities | 342A1A19A46A | Establish loto for PMT’s to replaced circulating hot water pump |
9/4/2025 11:03:23 | 4087 | Egon Hampton | Keusch, Justen | Facilities | 38A12A34A | Remove and replace ballast |
9/4/2025 9:35:15 | 4086 | Alma Armenta | Cameron, Benjamin | Facilities | E35B15A1A40A | Establish LP-567 |
9/4/2025 8:17:42 | 4085 | Gerald afowler | Delgado, Alex | Facilities | 420A6A1A/72-AC-006 | Perform leak inspection at outdoor unit |
9/4/2025 8:10:35 | 4084 | Andrew Southward | Cameron, Benjamin | Facilities | 33X1A3A | Install Data Logger in Panel |
9/4/2025 7:03:41 | 4083 | Ed Bekheet | Baird, Shawn | Facilities | E564A10A. Switch 11 | Flip breaker off for 24 hour panel power shutdown to test batteries |
9/3/2025 13:25:43 | 4082 | Avery Turner | Cameron, Benjamin | Facilities | PNL – 130–02 | Switching for the pmt crew identify the equipment the circuit turn to VFD to off position down the proper PPE energize a circuit verified breakers, and off position apply my lock and xanybody’s lock who’s working on the circuit.zvv and verify the power is de energized. |
9/3/2025 13:03:17 | 4081 | Balbino Mercadal | Keusch, Justen | Facilities | 33B39 A | Perform Monthly PM on emergency lighting |
9/3/2025 12:54:11 | 4080 | Balbino Mercadal | Keusch, Justen | Facilities | 33A | Perform Annual PM on emergency lighting |
9/3/2025 12:45:02 | 4079 | Balbino Mercadal | Keusch, Justen | Facilities | E536A | Perform Annual PM on emergency |
9/3/2025 8:20:18 | 4078 | Avery Turner | Cameron, Benjamin | Facilities | PNL-131-92 | Motor Replacement |
9/2/2025 7:49:44 | 4077 | Alma Armenta | Cameron, Benjamin | Facilities | 15-BL-004 DISC | Install motor for BL-04 |
9/2/2025 6:58:02 | 4076 | Amsouthward | Cameron, Benjamin | Facilities | 38A12A | Install data logger |
8/29/2025 12:01:17 | 4075 | AndrewSouthward | Hendrick, Jeffery | Facilities | 80A | Open and rack out breakers 80A10A and 80A6A |
8/29/2025 11:02:09 | 4074 | Balbino Mercadal | Keusch, Justen | Facilities | 30A2A1B | Replace lights out |
8/29/2025 10:52:18 | 4073 | AndrewSouthward | Hendrick, Jeffery | Facilities | 90 Temp generator/House generator | Inspect junction box and take pictures |
8/29/2025 7:43:11 | 4072 | Gerald Fowler | Delgado, Alex | Facilities | 650A9A/6W-AC-001 6W-AC-003 | Pm for split system heating/cooling |
8/29/2025 7:34:34 | 4071 | Gerald Fowler | Delgado, Alex | Facilities | 650A9A/6W-AC-002 6W-AC-004 | Pm for split system cooling/heating |
8/28/2025 10:31:52 | 4070 | Alma Armenta | Cameron, Benjamin | Facilities | 30-GP-010 disc | Troubleshoot 30-VFD-017 |
8/28/2025 8:46:39 | 4069 | Capeto | Delgado, Alex | Facilities | 44A1B/ 46 AC 046 | Replace reversing valve |
8/28/2025 8:16:15 | 4068 | Colmenares | Cameron, Benjamin | Facilities | Autoclave steam Jen number one | Autoclave maintenance |
8/28/2025 8:08:44 | 4067 | AndrewSouthward | Cameron, Benjamin | Facilities | 59-GP-002 VFD disconnect | Replace GP-2 |
8/28/2025 8:03:20 | 4066 | Larry Antles | Delgado, Alex | Facilities | 305A3A/B48 AC 006 | PM B48 AC 006 |
8/28/2025 8:02:14 | 4065 | Juan juarez | Delgado, Alex | Facilities | 305A3A/22 - 48AC005 | Preventive maintenance |
8/28/2025 7:52:54 | 4064 | Gerald Fowler | Delgado, Alex | Facilities | 513A1A13A/63-AC-001 | Troubleshoot refrigerant leak at reversing valve |
8/28/2025 7:33:34 | 4063 | Colmenares | Cameron, Benjamin | Facilities | KC-001 | Swiss support for an annual service p.m. for air compressor K001 |
8/28/2025 7:28:40 | 4062 | Colmenares | Cameron, Benjamin | Facilities | 92-MP-001-Disc | Switching support for air compressor MP 001 for semi annual p.m. inspection |
8/27/2025 8:02:45 | 4061 | Justin Solis | Delgado, Alex | Facilities | E30a5a7a31a-21/br-17-70 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/27/2025 7:45:09 | 4060 | AndrewSouthward | Cameron, Benjamin | Facilities | M72 | Replace VFD for CT-4 |
8/27/2025 7:35:54 | 4059 | Colmenares | Cameron, Benjamin | Facilities | M309A7A | PMT support |
8/26/2025 7:10:56 | 4058 | Gerald Fowler | Delgado, Alex | Facilities | 66A8A/62-AC-011 | Replace outdoor fan motor |
8/25/2025 13:49:19 | 4057 | Balbino Mercadal | Keusch, Justen | Facilities | E37D | Perform Monthly PM on emergency lighting |
8/25/2025 7:19:46 | 4056 | AndrewSouthward | Cameron, Benjamin | Facilities | 37A1A6A10A | Replace GP-16 |
8/25/2025 6:48:57 | 4055 | Colmenares | Cameron, Benjamin | Facilities | E642A15A | LOTO for contractors |
8/24/2025 14:44:28 | 4054 | Michel Kireeff Covo | Other | Other | CR A2111 chain | Dee voltage trips without lathing any alarm |
8/22/2025 7:18:28 | 4053 | Justin Solis | Delgado, Alex | Facilities | 218a2ac3a1a-22/ac-002-43 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/22/2025 7:10:55 | 4052 | Justin Solis | Delgado, Alex | Facilities | 218a2ac3a1a-9/ac-001-43 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/21/2025 13:17:23 | 4051 | Balbino Mercadal | Keusch, Justen | Facilities | 35A5B | Replace buzzing ballast |
8/21/2025 10:41:35 | 4050 | Cameron | Cameron, Benjamin | Facilities | 35B16C and 35B16B And 35B26A | Install data logger |
8/21/2025 7:59:36 | 4049 | Gerald Fowler | Delgado, Alex | Facilities | 420A6A1A11A | Pm for 72-AHU-001 |
8/21/2025 7:01:50 | 4048 | Colmenares | Cameron, Benjamin | Facilities | 640A | Remove data logger |
8/20/2025 13:21:54 | 4047 | Balbino Mercadal | Keusch, Justen | Facilities | 90A5A | Switch light not working |
8/20/2025 10:19:40 | 4046 | Colmenares | Cameron, Benjamin | Facilities | ARU-07-62 | Switching support for HVAC |
8/20/2025 7:57:22 | 4045 | Kevin Hope | Combs, Everett | Facilities | Switch 302A2A / ZVV 314A | Switch At Panel 302A2A circuit 4 bank 314 ZVV @ pnl314A demo circuit 39 for BA rack |
8/19/2025 8:20:34 | 4044 | Alma Armenta | Cameron, Benjamin | Facilities | 02U-VFD-004 / 02U-VFD-005 / 238A9A1A | Troubleshoot GP-004/GP-005 |
8/18/2025 13:14:28 | 4043 | Balbino Mercadal | Keusch, Justen | Facilities | 73A1A39A | Perform Monthly PM on emergency lighting |
8/18/2025 12:54:43 | 4042 | Pica | Cameron, Benjamin | Facilities | 218A2AC3A1A | Circuit survey |
8/18/2025 9:35:54 | 4041 | Alma Armenta | Cameron, Benjamin | Facilities | 306A4A | Verify rotation at 306A4A |
8/18/2025 8:35:48 | 4040 | Juan juarez | Delgado, Alex | Facilities | 229A-90AC035 | Preventive maintenance |
8/18/2025 8:31:13 | 4039 | Juan juarez | Delgado, Alex | Facilities | 92A5A-90AC031 | Preventive maintenance |
8/17/2025 14:24:27 | 4038 | Andrew Southward | Cameron, Benjamin | Facilities | 305A3A | Perform rotation check on 305A3A panel |
8/17/2025 13:57:34 | 4037 | Ben Cameron | Cameron, Benjamin | Facilities | 305A/8 | Inspect the backside of 480 volt substation 305A |
8/15/2025 12:51:50 | 4036 | Larry Antles | Delgado, Alex | Facilities | 44A1B/46 AC 46 | troubleshot AC 46 |
8/15/2025 12:11:03 | 4035 | Erik Line | Keusch, Justen | Facilities | See P4E-4 | Establishing LOTO P4E-4 |
8/15/2025 10:49:37 | 4034 | Kevin hope | Combs, Everett | ALS | Pnl-015-80 | Change bad breaker in panel 342a1a11a |
8/15/2025 7:45:26 | 4033 | Capet | Delgado, Alex | Facilities | 225A/ 55 AC 043 | PM |
8/15/2025 7:25:51 | 4032 | Larry Antles | Delgado, Alex | Facilities | 38A11A/B50B BL 034 | remove and replace B50B BL 034 |
8/15/2025 7:25:39 | 4031 | Capeto | Delgado, Alex | Facilities | 225A/ 55 AC 042 | PM |
8/13/2025 12:37:21 | 4030 | Balbino Mercadal | Keusch, Justen | Facilities | 178A | Perform Monthly PM on emergency lighting |
8/13/2025 12:01:31 | 4029 | Gerald Fowler | Delgado, Alex | Facilities | 172A34A/71K -AC-001 | Replacement of outdoor fan motor |
8/13/2025 10:19:05 | 4028 | Colmenares | Cameron, Benjamin | Facilities | 70A EL-001 | Remove and replace door, Operator |
8/13/2025 9:59:38 | 4027 | Egon Hampton | Keusch, Justen | Facilities | E542A10A | Replace existing bugeyes replace new |
8/13/2025 9:51:27 | 4026 | Egon Hampton | Keusch, Justen | Facilities | E542A9A | Remove and replace bugeye |
8/12/2025 9:13:23 | 4025 | Egon Hampton | Keusch, Justen | Facilities | E567A3A | Remove and replace ballast |
8/12/2025 9:03:25 | 4024 | Egon Hampton | Keusch, Justen | Facilities | 566A3A | Repair outages |
8/12/2025 8:20:44 | 4023 | Gerald Fowler | Delgado, Alex | Facilities | 251A/02-ARU-001 | Perform mode two troubleshooting on purge unit |
8/12/2025 7:18:06 | 4022 | Larry Antles | Delgado, Alex | Facilities | DP-671A12A/B91U ARU001 | PM B9U ARU 001 |
8/11/2025 8:20:55 | 4021 | David Davis | Keusch, Justen | Facilities | 301A2 | Establish LOTO at 301A2 that feeds 301A2A. ZVV at panel 301A2A. Wand cables in trench. |
8/8/2025 12:34:40 | 4020 | Larry Antles | Delgado, Alex | Facilities | 38A/B50B ARU 007 | Troubleshoot B50B ARU 007 |
8/7/2025 8:40:10 | 4019 | Justin Solis | Delgado, Alex | Facilities | 185a-10/ac-10-69 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
8/7/2025 8:37:16 | 4018 | Juan juarez | Delgado, Alex | Facilities | 217A1A3A/10 - 69AC008 | Preventive maintenance |
8/7/2025 8:32:14 | 4017 | Juan juarez | Delgado, Alex | Facilities | 217A1A3A/10 - 69AC008 | Preventive maintenance |
8/7/2025 8:28:27 | 4016 | Juan jaurez | Delgado, Alex | Facilities | 217A1A3A/15 | Preventive maintenance |
8/7/2025 8:23:26 | 4015 | Juan juarez | Delgado, Alex | Facilities | 217A1A3A/3 - 69AC005 | Preventive maintenance |
8/7/2025 6:28:08 | 4014 | Peter combs | Baird, Shawn | Facilities | Panel B by rm 110 | Power down fire alarm control panel and sub panels |
8/6/2025 21:24:37 | 4013 | Balbino Mercadal | Keusch, Justen | Facilities | E250A | Replace bad multiple emergency lighting fixtures |
8/6/2025 8:10:28 | 4012 | Justin walker | Delgado, Alex | Facilities | 596A1A2A39A-4/59Ac 002 | Replace controller for compressor 1 |
8/6/2025 7:39:10 | 4011 | Robert Ralph | Combs, Everett | Facilities | 302A4A, 320A, 320A39A, BA panels S0801-S0825 | Open CB to turn off two panels perform ZVV, at panels remove CB from panels and ZVV 10 BA panels. |
8/5/2025 12:09:49 | 4010 | Antonio collado | Delgado, Alex | Facilities | Mcc51a8a/ aru 004 -064 | Troubleshoot aru 004 |
8/5/2025 8:08:55 | 4009 | Gerald Fowler | Delgado, Alex | Facilities | 266A40A3A/5 - 64BR008 | Replacement of actuators and sensors |
8/5/2025 7:21:13 | 4008 | Kevin hope | Combs, Everett | ALS | 310A | Turn off breakers 28,33 in pnl-077-06 |
8/4/2025 13:16:51 | 4007 | Balbino Mercadal | Keusch, Justen | Facilities | E589A | Perform Monthly PM on emergency lighting |
8/4/2025 9:54:42 | 4006 | Erik Line | Keusch, Justen | Facilities | 124A1A | Installing new breaker. |
8/4/2025 8:20:17 | 4005 | Juan juarez | Delgado, Alex | Facilities | 631A21A/1 - 56AAC001 | Preventive maintenance |
8/4/2025 8:12:52 | 4004 | Juan juarez | Delgado, Alex | Facilities | 631A3A/1 - 56AAC002 | Preventive maintenance |
8/4/2025 8:08:15 | 4003 | Juan juarez | Delgado, Alex | Facilities | 631A4A/1 - 56AAC003 | Preventive maintenance |
8/4/2025 8:01:52 | 4002 | Juan Juárez | Delgado, Alex | Facilities | 631A9A/1 - 56AC004 | Preventive maintenance |
8/4/2025 7:50:56 | 4001 | Juan juarez | Delgado, Alex | Facilities | 631A10A/1 - 56AC005 | Preventive maintenance |
8/4/2025 7:45:57 | 4000 | Juan juarez | Delgado, Alex | Facilities | 631A15A/1 - 56AC006 | Preventive maintenance |
8/4/2025 7:40:36 | 3999 | Juan juarez | Delgado, Alex | Facilities | 631A16A/1 - 56AC007 | Preventive maintenance |
8/4/2025 7:26:42 | 3998 | Colmenares | Cameron, Benjamin | Facilities | 638A22A | Provide lotta support for contractors removing receptacles |
8/4/2025 7:21:22 | 3997 | Colmenares | Cameron, Benjamin | Facilities | 638A21A | Removal of receptacles and installation of other receptacles |
8/1/2025 11:49:56 | 3996 | Alma Armenta | Cameron, Benjamin | Facilities | 306A3A | Visual inspection on rear cell for 306A3A |
8/1/2025 8:09:49 | 3995 | Juan Juárez | Delgado, Alex | Facilities | 491A4A/1 - 85BAC004 | Preventive maintenance |
8/1/2025 8:03:48 | 3994 | Juan juarez | Delgado, Alex | Facilities | 491A10A/3- 85BAC003 | Preventive maintenance |
8/1/2025 7:59:28 | 3993 | Juan juarez | Delgado, Alex | Facilities | 411A9A/3- 85BAC002 | Preventive maintenance |
8/1/2025 7:54:22 | 3992 | Juan Juárez | Delgado, Alex | Facilities | 491A3A/1 -84BAC001 | Preventive maintenance |
7/31/2025 9:56:19 | 3991 | Justin walker | Delgado, Alex | Facilities | 700A5A/ 92Hp106 | Perform scheduled repairs with vendor on heat pump 106 |
7/31/2025 9:36:25 | 3990 | Egon Hampton | Keusch, Justen | Facilities | 262A1A | Repair outages |
7/31/2025 9:19:51 | 3989 | Capeto | Delgado, Alex | Facilities | 70A AC 004/ 31A3B | PM |
7/31/2025 7:55:44 | 3988 | Alma Armenta | Cameron, Benjamin | Facilities | E513A7A, aEG 69-55, 90A4A | Establish LP-5778 |
7/30/2025 16:17:26 | 3987 | Ben Cameron | Hendrick, Jeffery | Facilities | 513A7A / 410/22 | Verify rotation and voltage for temp generators. |
7/30/2025 9:36:42 | 3986 | AndrewSouthward | Cameron, Benjamin | Facilities | TSW-001-92 | Take pictures of 92-TSW-001 |
7/30/2025 9:05:52 | 3985 | Antonio collado | Delgado, Alex | Facilities | M238a4a/ aru 3-03 | Troubleshoot aru 3 ckt 1 |
7/29/2025 12:07:55 | 3984 | Antonio collado | Delgado, Alex | Facilities | 35c1a10a/br007 50a | Replace low water cut out |
7/29/2025 10:58:30 | 3983 | Egon Hampton | Keusch, Justen | Facilities | E43A2A | Arcing Ballast |
7/29/2025 10:32:13 | 3982 | AndrewSouthward | Cameron, Benjamin | Facilities | 75-TSW-001 | Take pictures of ATS |
7/29/2025 9:26:34 | 3981 | Gerald Fowler | Delgado, Alex | Facilities | EM357A1A7A1AC3A/86-AC-002 | Pm for 86-AC-002 |
7/29/2025 9:04:34 | 3980 | Justin walker | Delgado, Alex | Facilities | EM357A1A7A1AC3A / 86 Ac 001 | Perform scheduled pm |
7/29/2025 7:22:18 | 3979 | AndrewSouthward | Cameron, Benjamin | Facilities | 306A4A | Take rotation reading at panel 306A4A |
7/29/2025 5:40:30 | 3978 | Egon Hampton | Keusch, Justen | Facilities | 215A3A3A ct 5 | Remove two fixtures for plumbers |
7/28/2025 13:55:34 | 3977 | Balbino Mercadal | Keusch, Justen | Facilities | 100A | Replace overhead lights |
7/28/2025 13:47:46 | 3976 | Balbino Mercadal | Keusch, Justen | Facilities | E45A33A | Perform Monthly PM on emergency lighting |
7/28/2025 9:09:28 | 3975 | Larry Antles | Delgado, Alex | Facilities | 38A2A4A/B50B AHU 037 | PM B50B AHU 037 |
7/28/2025 8:18:31 | 3974 | Antonio collado | Delgado, Alex | Facilities | 550a1a/ aru 001 -67 | Replacing comm card on chiller |
7/28/2025 7:57:20 | 3973 | Erik Line | Keusch, Justen | Facilities | 82A12A | Install Data Logger on circuit 27 |
7/28/2025 7:51:37 | 3972 | AndrewSouthward | Cameron, Benjamin | Facilities | 304,305,306 | Rotation checks at banks 304,305 and 306 |
7/28/2025 7:39:22 | 3971 | Sayee Chea | Keusch, Justen | Facilities | E43A1A4A | Annual PM |
7/28/2025 7:05:15 | 3970 | Pica | Cameron, Benjamin | Facilities | 72A5A ckt4. CR-1-77 | Crane LOTO for Kone |
7/26/2025 13:33:05 | 3969 | Noel Cuffee | Baird, Shawn | Facilities | N/A used and LOTO switch by damper | Swap out FSD for new FSD |
7/26/2025 10:27:00 | 3968 | Noel Cuffee | Baird, Shawn | Facilities | Panel E656A1A10A- Circuit 36 | Replace the fire smoke damper on the 3rd floor of B30 by the stairwell |
7/26/2025 6:09:02 | 3967 | Sayee Chea | Keusch, Justen | Facilities | E374A1A | Installing LED street light fixtures |
7/25/2025 13:06:38 | 3966 | Balbino Mercadal | Keusch, Justen | Facilities | 27A21A3A | Perform Annual PM on emergency lighting |
7/25/2025 12:55:21 | 3965 | Balbino Mercadal | Keusch, Justen | Facilities | E468A | Perform Annual PM on emergency lighting |
7/25/2025 12:25:22 | 3964 | AndrewSouthward | Cameron, Benjamin | Facilities | E700A1A | Investigate faulty current readings on meter |
7/25/2025 12:23:39 | 3963 | Alma Armenta | Cameron, Benjamin | Facilities | 700A3A | Perform troubleshooting on 700A3A due to current fluctuations |
7/25/2025 11:37:42 | 3962 | Egon Hampton | Keusch, Justen | Facilities | 238A38A1A | Repair outages in handrails |
7/25/2025 11:15:11 | 3961 | Sayee Chea | Keusch, Justen | Facilities | 238A3A1A | Replace ballasts under stairs railing |
7/25/2025 10:52:43 | 3960 | Alma Armenta | Cameron, Benjamin | Facilities | 411A | Establish Lp-5817 |
7/25/2025 9:38:27 | 3959 | Sayee Chea | Keusch, Justen | Facilities | 238A3A4A | Installing 1 power pack and 2 ballasts |
7/25/2025 9:28:29 | 3958 | Justin walker | Delgado, Alex | Facilities | 176a21A-14/ 90 P ac 001 | Perform scheduled maintenance |
7/25/2025 9:05:39 | 3957 | A.J.Turner | Cameron, Benjamin | Facilities | MCC 70A4A10A | LOTO LCW 70A-GP-47 |
7/25/2025 7:41:44 | 3956 | Justin walker | Delgado, Alex | Facilities | 342a1a7a40a | Performed scheduled pm |
7/24/2025 12:51:10 | 3955 | Balbino Mercadal | Keusch, Justen | Facilities | E536A | Perform Monthly PM on emergency lighting |
7/24/2025 12:45:18 | 3954 | Gerald Fowler | Delgado, Alex | Facilities | M338a6a. / Ahu 25 | Perform scheduled pm |
7/23/2025 9:49:05 | 3953 | Gerald Fowler | Delgado, Alex | Facilities | E700A1A4A9A/92-DHPT-001/92-IHTP-001 | Replace controllers for 92-IHPT-001 & 92-DHPT-001 |
7/23/2025 7:39:08 | 3952 | Juan Juárez | Delgado, Alex | Facilities | 66A8A-23/ 62AC011 | Preventive maintenance |
7/23/2025 6:50:20 | 3951 | Alma Armenta | Cameron, Benjamin | Facilities | 31A5C | Install Data Logger in Panel |
7/22/2025 8:03:14 | 3950 | Greg Neidiger | Secheck, Stephen | Facilities | 246A4A-11 | Run Conduit and wire for new dedicated receptacle utilizing 246A4A-11 |
7/22/2025 8:00:03 | 3949 | Juan juarez | Delgado, Alex | Facilities | 354A2A/71JAC004 | Preventive maintenance |
7/22/2025 7:31:45 | 3948 | Juan Juárez | Delgado, Alex | Facilities | 354A2A/71JAC003 | Preventive maintenance |
7/22/2025 7:12:17 | 3947 | Larry Antles | Delgado, Alex | Facilities | 172A34A/71K AC 002 | PM 71K AC 002 |
7/22/2025 6:50:40 | 3946 | Alma Armenia | Cameron, Benjamin | Facilities | 43KC06 | LOTO for Vendor |
7/21/2025 10:33:58 | 3945 | nick gripe | Keusch, Justen | ALS | 302A1A/9 BTS Dipole Power Supply | LOTO for carol |
7/21/2025 10:27:12 | 3944 | Mayumi Taylor | Keusch, Justen | ALS | 319A | Reenergize circuits 3,4,9,10,15,16,21,22,33, leave off ct 27, 28 and 40. |
7/21/2025 8:10:05 | 3943 | Alma Armenta | Cameron, Benjamin | Facilities | E72A9B | Install Data Logger in Panel |
7/21/2025 7:50:06 | 3942 | Antonio collado | Delgado, Alex | Facilities | 514a6a/ 71 aru 008 | Pm aru 008 |
7/21/2025 7:19:37 | 3941 | Alma Armenta | Cameron, Benjamin | Facilities | 72A4A ckt 21 | Establish LP-5768 |
7/21/2025 7:03:16 | 3940 | Pica | Cameron, Benjamin | Facilities | 72A10A1A | KC08 & ADR07 |
7/18/2025 10:09:48 | 3939 | Alma Armenta | Cameron, Benjamin | Facilities | E465A3A9A | Remove Data Logger in Panel |
7/18/2025 8:02:44 | 3938 | Gerald Fowler | Delgado, Alex | Facilities | 305A4A1A1A/80-AC-029 | Pm for 80-AC-029 |
7/18/2025 7:55:12 | 3937 | Justin Solis | Delgado, Alex | Facilities | 305a4a1a1a-39/ac-28-80 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
7/18/2025 7:38:40 | 3936 | Alma Armenta | Cameron, Benjamin | Facilities | E30Q5A7A | Establish LP-5753 |
7/18/2025 7:37:07 | 3935 | David Davis | Keusch, Justen | ALS | 727A | Pull in branch wiring for HPA units |
7/17/2025 9:09:12 | 3934 | Christopher Nelson | Combs, Everett | Facilities | S0213 S0214 | ZVV previously switched BA Rack S0213 / S0214 |
7/17/2025 8:45:52 | 3933 | Pica | Cameron, Benjamin | Facilities | 66AHU03 | PMT Switching Support |
7/17/2025 8:22:10 | 3932 | Gerald Fowler | Delgado, Alex | Facilities | 239A/ nitrogen fill station | Troubleshoot nitrogen fill station issues |
7/17/2025 8:10:55 | 3931 | Christopher Nelson | Combs, Everett | Facilities | 314A | Switch and ZVV for work in ba panel S021314 |
7/16/2025 8:59:19 | 3930 | Sayee Chea | Keusch, Justen | Facilities | E567A3A | Replacing 2 emergency light fixtures |
7/16/2025 6:49:55 | 3929 | Larry Antles | Delgado, Alex | Facilities | E644A//Chiller RM Refrigeration Detection PNL | Remove and Replace Refrigerant Monitor |
7/15/2025 21:21:06 | 3928 | Patrick Coleman | Other | Other | Modulator | To render 'Mod room' safe to enter to reset breakers. |
7/15/2025 12:27:23 | 3927 | Shane Miller | Combs, Everett | Facilities | 321A | Cable cataloging |
7/15/2025 12:09:08 | 3926 | Alma Armenta | Cameron, Benjamin | Facilities | E410A22A | Verify phase rotation in transfer switxb |
7/15/2025 9:39:19 | 3925 | Sayee Chea | Keusch, Justen | Facilities | E542A9A | Replacing defective Exit Signs and Bug Eyes |
7/15/2025 7:29:44 | 3924 | Gerald Fowler | Delgado, Alex | Facilities | 480A5A/50B-AC-012 | Pm for 50B-AC-012 |
7/14/2025 12:41:37 | 3923 | Christopher Nelson | Combs, Everett | Facilities | 311A | ZVV panel 311A for removal of circuit feeding panel 311A34A |
7/14/2025 10:49:42 | 3922 | Christopher nelso | Combs, Everett | Facilities | 302A2A | Switch transformer 311 for 311A ZVV |
7/11/2025 12:09:56 | 3921 | Larry Antles | Delgado, Alex | Facilities | 49A2A3A/46 AC 27 | Troubleshoot B46 AC 27 |
7/11/2025 7:45:13 | 3920 | Erik Line | Keusch, Justen | Facilities | 80A | Pulling wire from bank 80 to the building. |
7/11/2025 6:36:17 | 3919 | Gerald Fowler | Delgado, Alex | Facilities | E635a1A33A/33-AHU-002 | PM for 33-AHU-002 |
7/11/2025 6:30:14 | 3918 | Gerald Fowler | Delgado, Alex | Facilities | E635A1A33A/33-AHU-001 | Pm for 33-AHU-001 |
7/10/2025 10:33:26 | 3917 | Erik L | Keusch, Justen | Facilities | E65A4A | Install temp cord on FA panel |
7/10/2025 9:46:21 | 3916 | Stephan Sechek | Ramer, Robert | Facilities | 244A2A | Mode 2 work. Open panel identify circuit 23 has wire on breaker. |
7/10/2025 7:07:59 | 3915 | Robert Ralph | Combs, Everett | Facilities | 319A | Turn off Circuit Breaker, LOTO, ZVV BA panels |
7/10/2025 6:59:03 | 3914 | Gerald Fowler | Delgado, Alex | Facilities | 635A1A2A /33-AHU-003 | Pm for 33-AHU-003 |
7/10/2025 6:47:55 | 3913 | Gerald Fowler | Delgado, Alex | Facilities | 635A1A2A/33-AHU-003 | Pm for 33-AHU-003 |
7/10/2025 6:34:17 | 3912 | Alma Armenta | Cameron, Benjamin | Facilities | 331A-ckt 4 | Remove Data Logger in Panel |
7/9/2025 12:01:33 | 3911 | Robert Ralph | Combs, Everett | Facilities | 318A | Turn off CIrcuit breakers and verify conductors in Wireway are not energized |
7/9/2025 8:43:44 | 3910 | Colmenares | Cameron, Benjamin | Facilities | MCC - 001 - 70 | Switching and LOTO support |
7/9/2025 7:41:39 | 3909 | Colmenares | Cameron, Benjamin | Facilities | M218A1A-15, E231A-15 | Support Motor Bearing Replacement |
7/9/2025 7:41:18 | 3908 | Larry Antles | Delgado, Alex | Facilities | 47A1A1A/83 ARU 002 | Remove and Replace Condenser coil |
7/8/2025 10:09:58 | 3907 | Christopher Nelson | Combs, Everett | Facilities | 313A 28, 27, 34 | Complex LOTO ZVV for ba panels cable catalog/cable removal |
7/8/2025 9:56:53 | 3906 | Christopher Nelson | Combs, Everett | Facilities | 314 A | LOTO and ZVV for cable removal catalogs |
7/8/2025 7:44:00 | 3905 | Colmenares | Cameron, Benjamin | Facilities | 637A | Contractors to wire into J boxes and ceiling LBL electricians to perform lotto and ZVV |
7/8/2025 7:30:42 | 3904 | AndrewSouthward | Cameron, Benjamin | Facilities | ATS—1-55 | Rotation check at ATS |
7/7/2025 12:30:30 | 3903 | Colmenares | Hendrick, Jeffery | Facilities | 72A2A16A | Remove the log |
7/7/2025 12:01:48 | 3902 | Colmenares | Hendrick, Jeffery | Facilities | 652A1A6A | Removed data locker |
7/7/2025 11:42:41 | 3901 | AndrewSouthward | Hendrick, Jeffery | Facilities | 710A | Reset Breaker |
7/7/2025 11:33:32 | 3900 | Robert Ralph | Combs, Everett | Facilities | 319A | Turn off circuits feeding BA panels, establish LOTO, ZVV at BA panel, trace cables through racks and wireways |
7/3/2025 13:14:26 | 3899 | Darren krans | Delgado, Alex | Facilities | 112A6A1B1A/55AC44 | Preventing maintenance |
7/3/2025 8:46:44 | 3898 | Antonio collado | Delgado, Alex | Facilities | 72A2A16A/31 shaking | Troubleshooting test chamber |
7/3/2025 8:22:28 | 3897 | Erik Line | Keusch, Justen | Facilities | 81A9A | Replacing three separate duplex receptacles. |
7/3/2025 8:18:56 | 3896 | Capeto | Delgado, Alex | Facilities | 513A1A1A/ 55A chiller | PM |
7/2/2025 7:38:20 | 3895 | Gerald Fowler | Delgado, Alex | Facilities | 501A6A/76-AC-005 AHU and Condenser | PM for 76-AC-005 |
7/2/2025 7:28:56 | 3894 | David Davis | Combs, Everett | Facilities | 342A1A19A51A | Re-energize CB 25 in panel 342A1A19A51A. Verify correct voltage at disconnect. |
7/2/2025 6:46:45 | 3893 | Colmenares | Hendrick, Jeffery | Facilities | 635A1A2A | Install day Logger |
7/1/2025 9:52:05 | 3892 | Larry Antles | Delgado, Alex | Facilities | 70A2A8A/70 AHU 19 | Troubleshoot B70 AHU 19 |
7/1/2025 8:53:06 | 3891 | Greg Neidiger | Secheck, Stephen | Facilities | 244A2A-23 | LOTO/ZVV 244A2A-23 and verify 21 has zero voltage |
7/1/2025 7:29:18 | 3890 | Gerald Fowler | Delgado, Alex | Facilities | 25A18A/50AC025 | Preventive maintenance |
7/1/2025 7:21:44 | 3889 | AndrewSouthward | Hendrick, Jeffery | Facilities | VFD-26-66 | Replace gp-26 |
7/1/2025 7:06:54 | 3888 | Christopher Nelson | Combs, Everett | Facilities | 342A1A19A And. 342A1A19A51A | Switch panel and ZVV panel to enter conduit in panel pull in new circuit for Sharp Lathe |
7/1/2025 6:58:07 | 3887 | Colmenares | Hendrick, Jeffery | Facilities | 86-BL001-Disc | Replace blower motors one and two |
6/30/2025 8:00:15 | 3886 | Jeff Hendrix | Hendrick, Jeffery | Facilities | 238A9A1A-20,22,24 | Troubleshoot why Gp 004 breaker has tripped twice. |
6/30/2025 7:47:23 | 3885 | Gerald Fowler | Delgado, Alex | Facilities | 514A1A7A/71-AHU-039 | PM for 71-AHU-039 |
6/30/2025 7:38:52 | 3884 | Capeto | Delgado, Alex | Facilities | 514A1A/71 AHU 036 | PM |
6/30/2025 7:32:55 | 3883 | Gerald Fowler | Delgado, Alex | Facilities | 514A1A/71-AHU-037 | Perform PM on air handler |
6/30/2025 6:53:03 | 3882 | Colmenares | Hendrick, Jeffery | Facilities | 33X1A3A | Remove data log |
6/27/2025 13:23:30 | 3881 | Gerald Fowler | Delgado, Alex | Facilities | 217A3A1A/76-AC-012 | Pm for 76-AC-012 |
6/27/2025 9:50:59 | 3880 | Colmenares | Cameron, Benjamin | Facilities | E447A3A | Assist contractors with troubleshooting of gas pump card reader |
6/27/2025 8:32:11 | 3879 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A | Turn off two circuit breakers in order to turn off two panels so demo can be performed and new conduit installed. |
6/27/2025 8:30:24 | 3878 | Alma Armenta | Cameron, Benjamin | Facilities | 25A1A | Replace motor for GP-32 |
6/27/2025 7:34:15 | 3877 | Ben Cameron | Hendrick, Jeffery | Facilities | E546A9A1A | Replace 15-BL-3/4 |
6/26/2025 13:38:18 | 3876 | Shane Miller | Secheck, Stephen | Facilities | 148A1A ckt 18 | Loto panel 148A1A, disconnect 2 furniture whips in 76L. Reconnect after furniture is replaced |
6/26/2025 12:40:21 | 3875 | Capeto | Delgado, Alex | Facilities | 27A/ 78 AC 001 | PM |
6/26/2025 9:04:25 | 3874 | Gerald Fowler | Delgado, Alex | Facilities | 585A1A/15-BL-005 | Pm for 15-BL-005 |
6/26/2025 9:03:21 | 3873 | Capeto | Delgado, Alex | Facilities | 546A/ 15 AHU 008 | PM |
6/26/2025 8:09:52 | 3872 | Alma Armenta | Cameron, Benjamin | Facilities | 96A | Troubleshoot BL-39 |
6/25/2025 12:06:02 | 3871 | Gerald Fowler | Delgado, Alex | Facilities | 50A1A/46B-AC-003 | Pm on 46B-AC-003 |
6/25/2025 8:37:51 | 3870 | Shane Miller | Secheck, Stephen | Facilities | E468A-13 | Remove and replace light fixtures and upgrade switch to dimmer. |
6/25/2025 7:43:17 | 3869 | Larry Antles | Delgado, Alex | Facilities | 28A2AAC3A1A/KC 004 | inspect ADR 004 for leaks |
6/24/2025 9:46:01 | 3868 | A.Turner | Cameron, Benjamin | Facilities | EM551A4A1A15A | Replace blower 6 motor |
6/24/2025 7:45:07 | 3867 | Larry Antles | Delgado, Alex | Facilities | 49A2A6A/B46 AC 22 | PM B46 AC 22 |
6/24/2025 7:36:18 | 3866 | Justin walker | Delgado, Alex | Facilities | 49a3a-15 | Perform scheduled maintenance |
6/23/2025 11:47:36 | 3865 | Alma Armenta | Cameron, Benjamin | Facilities | M309A7A | Establish FLP-731 to replace 34-VFD-008 |
6/23/2025 10:45:54 | 3864 | Larry Antles | Delgado, Alex | Facilities | 38A6A/B50B AHU 007 | PM AHU 007 |
6/23/2025 10:41:14 | 3863 | Larry Antles | Delgado, Alex | Facilities | 38A6A/B50B AHU 006 | PM AHU 006 |
6/23/2025 9:28:33 | 3862 | Colmenares | Cameron, Benjamin | Facilities | 305A3A | Check face rotation in electrical panel 305 A3 a |
6/23/2025 8:23:53 | 3861 | Justin walker | Delgado, Alex | Facilities | M38a6a-4c | Perform scheduled maintenance |
6/23/2025 8:02:09 | 3860 | Justin walker | Delgado, Alex | Facilities | 38A13A-22 | Perform scheduled maintenance |
6/23/2025 7:49:33 | 3859 | Justin walker | Delgado, Alex | Facilities | 38A13A-16 | Perform scheduled pm |
6/23/2025 7:37:23 | 3858 | Colmenares | Cameron, Benjamin | Facilities | E700A1A4A9A | Heater fan is going in the wrong direction swapping phases |
6/23/2025 6:47:42 | 3857 | Colmenares | Cameron, Benjamin | Facilities | E655A and E655 | Lock out house generator for contractors |
6/20/2025 12:04:53 | 3856 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A46A | Perform Monthly PM on emergency lighting |
6/20/2025 11:42:12 | 3855 | Balbino Mercadal | Keusch, Justen | Facilities | E22A64B | Perform Monthly PM on emergency lighting |
6/20/2025 11:27:58 | 3854 | Balbino Mercadal | Keusch, Justen | Facilities | 354A1A1A1A | Perform Annual PM on emergency lighting |
6/20/2025 11:16:15 | 3853 | Balbino Mercadal | Keusch, Justen | Facilities | 566A3A | Replace flashing LED fixture 1st floor hallway |
6/20/2025 8:06:30 | 3852 | Colmenares | Cameron, Benjamin | Facilities | 30A3A2A Ckt 16 | Troubleshoot chattering contactor for BL-177 |
6/20/2025 7:19:51 | 3851 | Alma Armenta | Cameron, Benjamin | Facilities | 230A | Replace block heater for 37-EG-111 |
6/18/2025 13:36:16 | 3850 | Balbino Mercadal | Keusch, Justen | Facilities | 178A | Perform Monthly PM on emergency lighting |
6/18/2025 8:41:08 | 3849 | AndrewSouthward | Cameron, Benjamin | Facilities | EM460A5A1A9A | Replace VFD for BL-3 |
6/18/2025 7:52:58 | 3848 | Larry Antles | Delgado, Alex | Facilities | 342A1A11A26A/80 AC 15 | Replace Compressor and Outdoor Fan Motor |
6/18/2025 7:35:18 | 3847 | Colmenares | Cameron, Benjamin | Facilities | 72D disconnect | Contractor lotto support for crane five |
6/18/2025 7:16:48 | 3846 | Andrew Southward | Cameron, Benjamin | Facilities | E643A | Install Data Logger in Panel |
6/18/2025 6:40:11 | 3845 | Andrew Southward | Cameron, Benjamin | Facilities | 279A | Install Data Logger in Panel |
6/17/2025 9:45:53 | 3844 | Capeto | Delgado, Alex | Facilities | E155c1A/ 48 SSI 004 | Duct cleaning |
6/17/2025 9:39:09 | 3843 | Capeto | Delgado, Alex | Facilities | E305AA3A39A1A1A/ 48 SSI 002 | Duct cleaning |
6/17/2025 8:20:11 | 3842 | Capeto | Delgado, Alex | Facilities | E305A3A39A1A1A/48 SSI 001 | Duct cleaning |
6/17/2025 7:50:12 | 3841 | Larry Antles | Delgado, Alex | Facilities | 305A3A/48 AC 005 | LOTO B48 AC units for duct cleaners |
6/17/2025 7:45:45 | 3840 | Larry Antles | Delgado, Alex | Facilities | 305A3A/48 AC 006 | Secure B48 AC units |
6/17/2025 6:54:43 | 3839 | Colmenares | Cameron, Benjamin | Facilities | E642A4A | LOTO for contractors to add outlets |
6/17/2025 6:41:02 | 3838 | Alma Armenta | Cameron, Benjamin | Facilities | 229A3B | Remove Data Logger in Panel |
6/16/2025 13:29:31 | 3837 | Balbino Mercadal | Keusch, Justen | Facilities | 66A4A4A | Perform Monthly PM on emergency lighting |
6/16/2025 9:21:54 | 3836 | Larry Antles | Delgado, Alex | Facilities | 596A1A1A39A/59 AC 007 | PM AC 007 |
6/16/2025 8:55:17 | 3835 | Colmenares | Cameron, Benjamin | Facilities | EM30A5A3A | Switching support for PMT’s |
6/16/2025 7:39:57 | 3834 | Antonio collado | Delgado, Alex | Facilities | 596a1a3a / 59 aru 001 | Pm aru 001 |
6/16/2025 7:29:22 | 3833 | Larry Antles | Delgado, Alex | Facilities | 596A1A7A/59 AC 005 | PM AC 005 |
6/16/2025 7:24:20 | 3832 | Andrew Southward | Cameron, Benjamin | Facilities | E465A3A9A | Install Data Logger in Panel |
6/16/2025 6:48:39 | 3831 | Andrew Southward | Cameron, Benjamin | Facilities | 286A | Install Data Logger in Panel |
6/13/2025 9:56:29 | 3830 | Larry Antles | Delgado, Alex | Facilities | E590A&A/B59 AC 006 | PM AC 006 |
6/13/2025 8:32:52 | 3829 | Avery Turner | Cameron, Benjamin | Facilities | EM30A5A3A | Switching Support |
6/13/2025 8:21:18 | 3828 | Erik Line | Keusch, Justen | Facilities | 124A1A | Install a Data Logger |
6/13/2025 7:44:33 | 3827 | Ben Cameron | Hendrick, Jeffery | Facilities | 661A | Reset Breaker |
6/13/2025 7:25:22 | 3826 | Capeto | Delgado, Alex | Facilities | 596A1A1A39A/ 59AC 004 | PM |
6/12/2025 14:39:36 | 3825 | Larry Antles | Delgado, Alex | Facilities | 596A1A2A39A/59 AC 008 | PM B59 AC 008 |
6/12/2025 8:23:52 | 3824 | Capeto | Delgado, Alex | Facilities | 596A1A12A39A/ AC 001 | PM |
6/12/2025 8:14:47 | 3823 | Justin Solis | Delgado, Alex | Facilities | 596a1a1a39a-3/59-ac-003 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
6/12/2025 7:54:03 | 3822 | AndrewSouthward | Cameron, Benjamin | Facilities | EM460A5A1A9A | Replace failed breaker in EM460A5A1A9A mcc |
6/11/2025 13:42:08 | 3821 | Balbino Mercadal | Keusch, Justen | Facilities | 212A | Perform Annual PM on emergency lighting |
6/11/2025 10:11:46 | 3820 | Larry Antles | Delgado, Alex | Facilities | 635A2A/B33U ARU 002 | Leak check Chiller |
6/11/2025 8:10:32 | 3819 | Shane Miller | Ramer, Robert | Facilities | 72A10A1A | Arc flash study |
6/11/2025 7:01:54 | 3818 | Robert Ralph | Combs, Everett | Facilities | 305A4A2A | Open circuit breaker to shut down panel in order to torqueand merger for inspection. |
6/11/2025 7:00:11 | 3817 | Mayumi Taylor | Keusch, Justen | Facilities | 579A | Loto, zvv, megger and torque breaker 4. May require troubleshooting which would result in turning on and off breakers. |
6/10/2025 12:43:43 | 3816 | Andrew Southward | Cameron, Benjamin | Facilities | E447A3A | Troubleshoot fuel alarm |
6/10/2025 9:08:43 | 3815 | Peter combs | Baird, Shawn | Facilities | E363A1A #20 | Replace power supply |
6/10/2025 7:02:00 | 3814 | Alma Armenta | Cameron, Benjamin | Facilities | E31A18A “old yeller” | Check rotation for E31A18A ckt 1, 2, 3, 4, 6 |
6/10/2025 7:00:15 | 3813 | Colmenares | Cameron, Benjamin | Facilities | 690A1A, 693A5A, 628A4A | Contractor support for LP 5693 demo PDU four and six |
6/9/2025 8:51:40 | 3812 | Colmenares | Cameron, Benjamin | Facilities | 70 MCC 001 | Switching Support for PMTs |
6/9/2025 8:26:20 | 3811 | Colmenares | Cameron, Benjamin | Facilities | 30A3A6D | Switching support for PMT’s |
6/9/2025 7:24:54 | 3810 | Capeto | Delgado, Alex | Facilities | 485A/ 76 AC 006 | PM |
6/9/2025 7:02:53 | 3809 | RobertRalph | Combs, Everett | Facilities | 319A | 1. Turn off circuit breakers 2.) ZVV at BA panels 3.) trace cables from equipment through wire wire ways |
6/6/2025 8:36:43 | 3808 | Colmenares | Hendrick, Jeffery | Facilities | M66A4A-3B | Motor replacement |
6/6/2025 7:57:52 | 3807 | Gerald Fowler | Delgado, Alex | Facilities | 484A3A/71-AC-018 | Perform PM on 71-AC-018 |
6/5/2025 13:15:26 | 3806 | Balbino Mercadal | Keusch, Justen | Facilities | 650A1A | Perform Annual PM on emergency lighting |
6/5/2025 13:07:00 | 3805 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A | Perform Annual PM on emergency lighting |
6/5/2025 12:57:35 | 3804 | Balbino Mercadal | Keusch, Justen | Facilities | 635A2A1A | Perform Annual PM on emergency lighting |
6/5/2025 12:42:00 | 3803 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A51A | Remove jbox with 2 receptacles, demo conductors to closest box, replace single receptacle with two |
6/5/2025 12:35:43 | 3802 | Antonio collado | Delgado, Alex | Facilities | 304a7a3a / 06 ac 001 | Troubleshoot ac unit 001 |
6/5/2025 12:13:00 | 3801 | Shane Miller | Secheck, Stephen | Facilities | 31A3D ckt 16 | Air gap existing glove box |
6/5/2025 9:47:02 | 3800 | Capeto | Delgado, Alex | Facilities | 15A15A63A/ 53 AC 001 | PM |
6/5/2025 8:30:25 | 3799 | Joseph Colmenares | Cameron, Benjamin | Facilities | GP-58-64 Disconnect | Switch and LOTO for PMTs |
6/4/2025 13:33:31 | 3798 | Alma Armenta | Cameron, Benjamin | Facilities | E465A3A-9 | Install Data Logger in Panel |
6/4/2025 12:27:46 | 3797 | Christopher Nelson | Combs, Everett | Facilities | 585A6A | Plug in mo box and test receptacle for proper voltage |
6/4/2025 10:17:36 | 3796 | Justin Solis | Delgado, Alex | Facilities | 217a3a3a-4/ac-11-76 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
6/4/2025 10:16:36 | 3795 | Shane Miller | Secheck, Stephen | Facilities | 701A ckt 40,42 | Install new EV charger for building 92 |
6/4/2025 10:14:41 | 3794 | Alejandro Lopez | Ramer, Robert | Facilities | 701A | Install new EV charger around back of building 92. |
6/4/2025 9:09:28 | 3793 | Justin walker | Delgado, Alex | Facilities | M23844a | Perform electrical inspection on aru 003 |
6/4/2025 8:07:43 | 3792 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A | Turn off circuits, ZVV, terminate liquid tite at outlet box and connect conductors to receptacles and drill press |
6/4/2025 7:35:22 | 3791 | Capeto | Delgado, Alex | Facilities | 22A/ 76 AC 009 | PM |
6/4/2025 7:31:09 | 3790 | Colmenares | Cameron, Benjamin | Facilities | 237A | Support for PMT‘s |
6/4/2025 7:29:01 | 3789 | Capeto | Delgado, Alex | Facilities | 76 AC 004 | PM |
6/4/2025 7:04:27 | 3788 | Joseph Pica | Cameron, Benjamin | Facilities | 147A1B | LOTO circuits for demo |
6/3/2025 13:19:00 | 3787 | Alma Armenta | Cameron, Benjamin | Facilities | E465A3A9A | Install Data Logger in Panel |
6/3/2025 12:55:31 | 3786 | Balbino Mercadal | Keusch, Justen | Facilities | E250A | Perform Monthly PM on emergency lighting |
6/3/2025 12:42:24 | 3785 | Juan juarez | Delgado, Alex | Facilities | 25A18A/50AC027 | Preventive maintenance |
6/3/2025 9:54:09 | 3784 | Alma Armenta | Cameron, Benjamin | Facilities | 331A4A | Install Data Logger in Panel |
6/3/2025 9:46:57 | 3783 | Sayee chea | Keusch, Justen | Facilities | 460A4A3A | Replace fixtures in lobby |
6/3/2025 6:59:52 | 3782 | Andrew Southward | Cameron, Benjamin | Facilities | 72A2A16A | Install Data Logger in Panel |
6/2/2025 11:50:37 | 3781 | Antonio collado | Delgado, Alex | Facilities | M460a1a/ 84b aru 001 | Troubleshoot unit , blank screen |
6/2/2025 6:42:13 | 3780 | Alma Armenta | Cameron, Benjamin | Facilities | 652A1A6A | Install Data Logger in Panel |
5/31/2025 6:46:21 | 3779 | Alma Armenta | Cameron, Benjamin | Facilities | 92-EL-001 DISC, 92-EL-002 DISC, elev 1 ltg & rec disc, elev 2 ltg & rec disc | Establish LP-5708 |
5/30/2025 14:18:55 | 3778 | greg Neidiger | Ramer, Robert | Facilities | E657A-9 | Replace GFCI receptacle on roof. |
5/30/2025 11:05:20 | 3777 | Colmenares | Cameron, Benjamin | Facilities | 66A1B Ckt 5 | Switching support for PMT’s |
5/30/2025 9:42:31 | 3776 | avery Turner | Cameron, Benjamin | Facilities | 436,683,441,559 | Switching for the PMT Crew |
5/30/2025 9:33:24 | 3775 | Alejandro Lopez | Ramer, Robert | Facilities | 702A | Hook up furniture whip by cubicle 0231R at building 92 second floor. |
5/30/2025 7:28:14 | 3774 | Mayumi Taylor | Keusch, Justen | ALS | Pnl 727a | Loto and zvv panel |
5/29/2025 12:44:48 | 3773 | Alejandro Lopez | Ramer, Robert | Facilities | 31A17A | Check resistance on existing wires at two separate locations in room 1103 at building 70A. |
5/29/2025 9:02:37 | 3772 | Colmenares | Cameron, Benjamin | Facilities | Auto clave 2 Disc | Contractor support. Switching support |
5/29/2025 8:14:22 | 3771 | Alma Armenta | Cameron, Benjamin | Facilities | M550A1A4A disc | Replace motor for BL-006 |
5/29/2025 7:52:52 | 3770 | Greg Neidiger | Secheck, Stephen | Facilities | LTG Inverter 635A1A4A-2 | Measure incoming voltage of lightning inverter |
5/29/2025 7:52:45 | 3769 | Larry Antles | Delgado, Alex | Facilities | 90A9A/ 90 AC 43 and 44 | PM B90 AC 43 And 44 switch to summer mode |
5/29/2025 6:55:04 | 3768 | Alma Armenta | Cameron, Benjamin | Facilities | 33X1A3A | Install Data Logger in Panel |
5/28/2025 14:03:21 | 3767 | Balbino Mercadal | Keusch, Justen | Facilities | 460A4A4A | Remove lighting fixture for HVAC access |
5/28/2025 13:47:41 | 3766 | Balbino Mercadal | Keusch, Justen | Facilities | 27A | Perform Monthly PM on emergency lighting |
5/27/2025 13:42:28 | 3765 | Shane Miller | Combs, Everett | Facilities | 306A4A | Apply Loto at panel 306A4A, install grounding wiring to wire way. |
5/27/2025 9:41:36 | 3764 | Alma Armenta | Cameron, Benjamin | Facilities | 296A4A | Install Data Logger in Panel |
5/27/2025 9:01:01 | 3763 | Alejandro Lopez | Ramer, Robert | Facilities | 72A3A and 72A4A | Gather crane motor plate information. |
5/27/2025 8:56:10 | 3762 | Andrew Southward | Cameron, Benjamin | Facilities | E231A/ M218A2A | Perform FLP-331 |
5/27/2025 7:46:13 | 3761 | Alma Armenta | Cameron, Benjamin | Facilities | 280A | Install Data Logger in Panel |
5/27/2025 8:57:54 | 3760 | Robert Ralph | Combs, Everett | Facilities | 319A | Open circuit breakers establish LOTO ZVV at racks trace cables in wireways re lease LOTO and energize circuits |
5/27/2025 7:06:27 | 3759 | Alma Armenta | Cameron, Benjamin | Facilities | 637A / 637A28A / 635A1A4A31A | Establish LP-5714 & 5727 |
5/23/2025 7:26:08 | 3758 | Larry Antles | Delgado, Alex | Facilities | 196A1A1A1A22A/71Q AC 001 | PM 71Q AC 001 |
5/22/2025 12:32:44 | 3757 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A9A | Perform PM on 59-VFD-005 |
5/22/2025 9:09:56 | 3756 | Alma Armenta | Cameron, Benjamin | Facilities | E590A7A | Perform PM for 59-BL-003 & 59-BL-004 |
5/22/2025 8:14:01 | 3755 | Alma Armenta | Cameron, Benjamin | Facilities | 516A9A1A | Perform PM for BL-001 & BL-002 |
5/22/2025 7:45:52 | 3754 | Colmenares | Cameron, Benjamin | Facilities | 357A1A | Test emergency generator for transfer |
5/22/2025 7:00:11 | 3753 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A5A | Perform PM for 59-VFD-30 and 59-VFD-31 |
5/21/2025 12:22:05 | 3752 | Colmenares | Cameron, Benjamin | Facilities | 596A1A9A | VFD PM |
5/21/2025 10:10:09 | 3751 | Gerald fowler | Delgado, Alex | Facilities | 550A1A/67AARU003 | Troubleshooting refrigerant leak |
5/21/2025 8:33:16 | 3750 | Colmenares | Cameron, Benjamin | Facilities | 72-GP-005 disc | GP five pump motor replacement |
5/21/2025 7:06:42 | 3749 | Alma Armenta | Cameron, Benjamin | Facilities | E700A1A4A9A Sec 2 / E720A Sec 2 | Establish LP-5710 |
5/20/2025 14:05:59 | 3748 | Colmenares | Cameron, Benjamin | Facilities | 44A1A | Replaced blower motor fan |
5/20/2025 9:09:06 | 3747 | AndrewSouthward | Cameron, Benjamin | Facilities | 147A1B | Establish LP-5747 |
5/20/2025 7:03:58 | 3746 | Andrew Southward | Cameron, Benjamin | Facilities | 596A1A4A | PM VFD-14 |
5/19/2025 8:51:03 | 3745 | Colmenares | Cameron, Benjamin | Facilities | Local BL05 Switch | BL 05 motor replacement |
5/16/2025 8:12:46 | 3744 | Alma Armenta | Cameron, Benjamin | Facilities | 229A3B | Install Data Logger in Panel |
5/16/2025 7:37:34 | 3743 | Justin solis | Delgado, Alex | Facilities | 513A7A11B1B/55AC043 | Troubleshooting unit ac |
5/15/2025 12:27:05 | 3742 | Shane Miller | Secheck, Stephen | Facilities | 217A1A3A | Loto, ZVV, investigate existing branch circuit wiring and install new raceways and jboxes for cubicle rearrangement. Pull in new conductors, inspect. |
5/15/2025 12:14:03 | 3741 | Colmenares | Hendrick, Jeffery | Facilities | 267A | Troubleshoot sump controller |
5/15/2025 10:36:43 | 3740 | Alma Armenta | Cameron, Benjamin | Facilities | 72A2A16A | Remove Data Logger in Panel |
5/15/2025 9:08:34 | 3739 | Alma Armenta | Cameron, Benjamin | Facilities | 47A3A34A40A | Install Data Logger in Panel |
5/15/2025 7:56:03 | 3738 | Alma Armenta | Cameron, Benjamin | Facilities | EM357A1A7A1AC3A / E570A | Remove Data Logger in Panel |
5/14/2025 13:07:40 | 3737 | Ben | Hendrick, Jeffery | Facilities | EMM551A4A1A15A | Take pictures of the elevators conductors entering the MCC |
5/14/2025 12:41:04 | 3736 | Alma Armenta | Cameron, Benjamin | Facilities | E657A | Install GFCI cover on roof GFCI |
5/14/2025 12:14:40 | 3735 | Alma Armenta | Cameron, Benjamin | Facilities | 653A | Install GFCI cover in outside GFCI |
5/14/2025 10:25:05 | 3734 | J Colmenares | Cameron, Benjamin | Facilities | MCC 51A8A | Switching Support |
5/14/2025 9:44:19 | 3733 | Brendan Ford | Other | Other | Station A 1400 Helium Refrigerator | LOTO the 1400 Helium Refrigerator and inspect/repair. |
5/14/2025 8:38:32 | 3732 | Justin solis | Delgado, Alex | Facilities | 253B1A33A/46AC050 | Preventive maintenance |
5/14/2025 8:14:54 | 3731 | Shane Miller | Secheck, Stephen | Facilities | 66A2A14A | Dawn the proper PPE and set up barricades, Loto @panel 66A2A14A ckt9, hang red locks. ZVV at bank 96 and panel 96A. Check connection/terminals. Mode 2 release loto and live voltage reading from each phase to neutral and ground at bank 96. Close and secure bank 96. Release LOTO |
5/14/2025 7:27:09 | 3730 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A | VFD Preventive maintenance |
5/14/2025 7:11:15 | 3729 | Alma Armenta | Cameron, Benjamin | Facilities | DP EPP125 / 671A12A | Establish LP-5697 |
5/12/2025 13:34:04 | 3728 | Colmenares | Cameron, Benjamin | Facilities | N218A2A5D | Switching support for PMT |
5/12/2025 11:04:10 | 3727 | Alma Armenta | Cameron, Benjamin | Facilities | 279A | Install Data Logger in Panel |
5/12/2025 10:30:01 | 3726 | Alma Armenta | Cameron, Benjamin | Facilities | 285A33A | Install Data Logger in Panel |
5/12/2025 9:13:42 | 3725 | Alma Armenta | Cameron, Benjamin | Facilities | DP E671A11A | Reset lighting inverter circuit in EU671A11A2A |
5/12/2025 8:47:36 | 3724 | Gerald Fowler | Delgado, Alex | Facilities | 49A2A6A/46-AC-022 | Troubleshoot 46-AC-022 not cooling |
5/12/2025 8:33:38 | 3723 | Larry Antles | Delgado, Alex | Facilities | 38A1A/AHU 030 | PM AHU 030 |
5/12/2025 8:28:13 | 3722 | Larry Antles | Delgado, Alex | Facilities | 38A1A/50B AHU 029 | PM AHU 029 |
5/12/2025 8:03:55 | 3721 | Greg Neidiger | Combs, Everett | Facilities | 727A39A | Replace stripped bussing of B phase circuit 9. Ground A0804, A0805, A0806, A0807 to building steel by bonding bare ground to panelboard enclosure using a through-bolt Kerney. |
5/9/2025 13:00:35 | 3720 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-013 | Pm for 50A-AHU-010 |
5/9/2025 12:52:32 | 3719 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-012 | Pm for 50A-AHU-012 |
5/9/2025 11:02:10 | 3718 | Gerald Fowler | Delgado, Alex | Facilities | 147A1A/46-AC-010 | PM for 46-AC-010 |
5/9/2025 10:55:44 | 3717 | Gerald Fowler | Delgado, Alex | Facilities | 147A1A/46-AC-009 | Pm for 46-AC-009 |
5/9/2025 7:58:02 | 3716 | Christopher Nelson | Combs, Everett | Facilities | 342A1A7A4A | ZVV Panel we Switched and LOTO to Remove A circuit in the room of this panel demo of circuit 5 receptacle |
5/9/2025 7:30:45 | 3715 | Capeto | Delgado, Alex | Facilities | M38A6A/ 50B AHU 024 | PM |
5/9/2025 7:28:38 | 3714 | Christopher Nelson | Combs, Everett | Facilities | 342A1A7A | Switch Panel 342A1A7A circuit 4 to ZVV panel 342A1A7A4A |
5/8/2025 13:16:34 | 3713 | Shane Miller | Secheck, Stephen | Facilities | 217A3A5A10A ckt 15 | Connect whip to new table saw |
5/8/2025 12:23:51 | 3712 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A11B1A/55-AC-041 | Pm on 55-AC-041 |
5/8/2025 7:40:11 | 3711 | Alma Armenta | Cameron, Benjamin | Facilities | E191A1A2A | Replace motor for 66-BL-65 |
5/7/2025 9:46:17 | 3710 | Colmenares | Cameron, Benjamin | Facilities | 70 MCC003 | Switching support for vacuum pumps |
5/7/2025 8:30:49 | 3709 | Colmenares | Cameron, Benjamin | Facilities | 217A3A1A | Replace blower one motor on roof |
5/7/2025 7:19:18 | 3708 | Mayumi Taylor | Keusch, Justen | Facilities | Pnl 279A | Assemble so cable with cord caps. |
5/6/2025 13:33:53 | 3707 | Shane Miller | Ramer, Robert | Facilities | EM22A-13 | MM replace receipt. |
5/6/2025 12:26:15 | 3706 | Antonio collado | Delgado, Alex | Facilities | 35a -50a aru 006 | Replacing contractors on aru 006 |
5/6/2025 12:16:03 | 3705 | Balbino Mercadal | Keusch, Justen | Facilities | 235A | Perform Annual PM on emergency lighting |
5/6/2025 9:39:07 | 3704 | Alejandro Lopez | Ramer, Robert | Facilities | 566A9A | Apply simple LOTO and ZVV exterior lighting on third floor mezzanine south side at building 67. |
5/6/2025 6:58:16 | 3703 | Colmenares | Cameron, Benjamin | Facilities | UE 592A Ckt 14 | Provide contractor support for door opener |
5/6/2025 6:45:17 | 3702 | Alma Armenta | Cameron, Benjamin | Facilities | E65A | Remove Data Logger in Panel |
5/5/2025 18:22:20 | 3701 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A2A | Replace emergency lighting fixture |
5/5/2025 13:18:21 | 3700 | Greg Neidiger | Secheck, Stephen | Facilities | 242A-5 | Reset 120V circuit breaker |
5/5/2025 7:37:24 | 3699 | Capeto | Delgado, Alex | Facilities | E536A/ 28 AC 002 | Replace OFM |
5/2/2025 12:44:55 | 3698 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A | Replace emergency lighting fixtures |
5/2/2025 9:53:09 | 3697 | Scott Small | Other | Other | Station B 1430 | Establish electrically safe work condition on Station B 1430 Helium Compressor for contractor work - LOTO Permit # 5721 |
5/1/2025 16:21:56 | 3696 | Ari Harding | Other | Other | N/A | Bench top testing of experimental DC-DC power supply |
5/1/2025 13:30:38 | 3695 | Balbino Mercadal | Keusch, Justen | Facilities | E43A1A4A | Replace emergency lighting fixture. |
5/1/2025 9:25:05 | 3694 | Mayumi Taylor | Keusch, Justen | Facilities | 342a1a19a | Loto,zvv and remove power from bridgepoint drill press, |
5/1/2025 8:54:45 | 3693 | Colmenares | Cameron, Benjamin | Facilities | 635A1A2A | I just set points to vacuum pump one and 2 Mode 2 work |
5/1/2025 8:34:51 | 3692 | Sayee Chea | Keusch, Justen | Facilities | 38A4A2A | Installing additional ballast in each of the 5 light fixtures |
5/1/2025 7:41:54 | 3691 | Jared Tissot | Ramer, Robert | Facilities | E374A1A-2 | Investigate loss of power inside the gate house which provided power for networking. Restore power to breaker that was in the off position likely by being bumped as the panel is in a very low spot. The door of the sub panel is taped open due to 2 loto devices on circuit breakers not allowing the panel door to close. |
4/30/2025 14:19:44 | 3690 | Beau Erwin | Ramer, Robert | Facilities | 559A3A | Demo a few receptacles and remove wire mold |
4/30/2025 8:41:38 | 3689 | Antonio collado | Delgado, Alex | Facilities | 671a9a12a/ 91 ac 002 | Pm on ac 2 at 91 |
4/30/2025 8:27:24 | 3688 | Larry Antles | Delgado, Alex | Facilities | DP671A12A/91 AC 001 | PM AC 001 |
4/30/2025 8:04:58 | 3687 | Colmenares | Cameron, Benjamin | Facilities | 193A1A | Troubleshoot blower 12 |
4/30/2025 7:52:54 | 3686 | Sayee Chea | Keusch, Justen | Facilities | E43A1A | Replacing Bug eye fixture |
4/30/2025 7:48:30 | 3685 | Robert Ralph | Combs, Everett | Facilities | MO box | Install 30 A two pole receptacle in MO box |
4/29/2025 17:59:12 | 3684 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2A3A, | Replace lamps outage rm2275 |
4/29/2025 13:14:42 | 3683 | Egon Hampton | Keusch, Justen | Facilities | 239A | Repace fixtue |
4/29/2025 8:43:52 | 3682 | Colmenares | Cameron, Benjamin | Facilities | 525A | Troubleshoot, grizzly gate, inbound outbound |
4/29/2025 8:33:08 | 3681 | Gerald Fowler | Delgado, Alex | Facilities | 47A3A39A/74-AC-029 | Pm for 74-AAC-029 |
4/29/2025 7:43:43 | 3680 | AndrewSouthward | Cameron, Benjamin | Facilities | 72A7A9A | Replace VFD for AHU-28 |
4/28/2025 12:19:30 | 3679 | Balbino Mercadal | Keusch, Justen | Facilities | 84B | Perform Annual PM on emergency lighting |
4/28/2025 11:54:41 | 3678 | Balbino Mercadal | Keusch, Justen | Facilities | 696A | Perform Annual PM on emergency lighting |
4/28/2025 10:09:05 | 3677 | Sayee Chea | Keusch, Justen | Facilities | 566A3A | Will be replacing LED light fixtures |
4/28/2025 9:10:31 | 3676 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A4A | Troubleshoot and repair backwards spinning fan for AHU-17 |
4/28/2025 9:06:05 | 3675 | Alejandro Lopez | Ramer, Robert | Facilities | 555A15A4A | Air gap LIBRA microscope in room 1209A at building 67. |
4/28/2025 8:58:14 | 3674 | Alejandro Lopez | Ramer, Robert | Facilities | 72A5A | Assist with LP-5635 at building 77 room 0141. |
4/28/2025 7:54:16 | 3673 | Robert Ralph | Combs, Everett | Facilities | 319A | Performing switching on several circuit breakers, establishing LOTO, ZVV at equipment racks, trace cables, release LOTO , close circuit breakers. |
4/28/2025 7:38:06 | 3672 | Capeto | Delgado, Alex | Facilities | 546A/ 15 AHU 008 | PM |
4/28/2025 14:01:57 | 3671 | Mayumi Taylor | Keusch, Justen | ALS | 319A | Cable tracing in sector 7 |
4/28/2025 6:44:02 | 3670 | Andrew Southward | Cameron, Benjamin | Facilities | M218A1A | Disconnect GP-139 |
4/25/2025 12:17:08 | 3669 | Mayumi Taylor | Keusch, Justen | ALS | 347a28a | Add receptacle on 2nd floor lobby wall near break room. |
4/25/2025 6:41:34 | 3668 | Balbino Mercadal | Keusch, Justen | Facilities | 25A12A | Replace ballast as needed |
4/24/2025 13:22:03 | 3667 | Erik Line | Keusch, Justen | Facilities | 80A3A1A | Establish LOTO for base shack vacuum pump PM. |
4/24/2025 12:01:58 | 3666 | Andrew Southward | Cameron, Benjamin | Facilities | EM551A4A1A15A | Take pictures of circuit breaker |
4/24/2025 11:29:22 | 3665 | Larry Antles | Delgado, Alex | Facilities | 513A7A5A/55 AC 24 | remove and replace econimizer |
4/24/2025 7:50:47 | 3664 | Colmenares | Cameron, Benjamin | Facilities | 357A1A | Test emergency generator |
4/24/2025 7:37:41 | 3663 | Alma Armenta | Cameron, Benjamin | Facilities | E31A18A3F | Replace motor/pump for GP-029 |
4/23/2025 13:24:17 | 3662 | Balbino Mercadal | Keusch, Justen | Facilities | 30A3A5E | Replace Exit Sign |
4/23/2025 11:41:01 | 3661 | AndrewSouthward | Cameron, Benjamin | Facilities | M460A1A | Inspect conductors within M460A1A |
4/23/2025 8:39:38 | 3660 | Pica | Cameron, Benjamin | Facilities | 66A1A | Install overhead motor |
4/23/2025 7:32:14 | 3659 | Colmenares | Cameron, Benjamin | Facilities | 309A switchgear | Support Luis Soto RI by wrecking out and locking out breaker for ARU-4 |
4/22/2025 9:58:49 | 3658 | Larry Antles | Delgado, Alex | Facilities | DP 671A9A/ 91 AC 004 | PM AC 004 |
4/22/2025 7:20:57 | 3657 | Mayumi Taylor | Keusch, Justen | Facilities | 579a | Turn on breaker 1,3,5 and c10 |
4/22/2025 7:11:26 | 3656 | Justin walker | Delgado, Alex | Facilities | E35B15A1A/50AAC010 | Preventive maintenance |
4/22/2025 7:06:19 | 3655 | Mayumi Taylor | Keusch, Justen | Facilities | pnl305a4a2a | Turn circuit 1 in pnl305a4a2a on which feeds pnl 579a |
4/22/2025 14:12:40 | 3654 | Alma Armenta | Cameron, Benjamin | Facilities | E650A5A1A2A | Replace VFD for BL-23 |
4/21/2025 12:03:00 | 3653 | Balbino Mercadal | Keusch, Justen | Facilities | 263A2A | Replace emergency lighting fixture |
4/21/2025 11:52:05 | 3652 | Larry Antles | Delgado, Alex | Facilities | 185A/B69 AC 10 | PM AC 10 |
4/21/2025 11:45:48 | 3651 | Justin Solis | Delgado, Alex | Facilities | 217a1a3a/ac-006-69 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/21/2025 9:44:24 | 3650 | Brendan Ford | Other | Other | 80A3A5A9A CB 5 and 1430 Disconnect. | LOTO and electrical troubleshooting of the 1430 compressor PLC module. |
4/21/2025 7:21:23 | 3649 | Larry Antles | Delgado, Alex | Facilities | 25a17a40a/50A AC 28 | PM AC 28 |
4/21/2025 6:48:54 | 3648 | Andrew Southward | Cameron, Benjamin | Facilities | 79A | Install Data Logger in Panel |
4/18/2025 10:50:08 | 3647 | Todd Wood | Other | Other | PP1-8 | Disconnect wiring between heater ring and Heater control boxes. Unmount boxes and return them to LBL |
4/18/2025 6:59:54 | 3646 | AndrewSouthward | Cameron, Benjamin | Facilities | EM460A5A1A9A | LOTO and ZVV bl-2 for motor repair and VFD screen replacement |
4/17/2025 11:17:50 | 3645 | Balbino Mercadal | Keusch, Justen | Facilities | E250A | Replace emergency fixture |
4/17/2025 9:57:45 | 3644 | Colmenares | Cameron, Benjamin | Facilities | E47A2A2A22A | PMT SUPPORT |
4/17/2025 8:32:10 | 3643 | Antonio collado | Delgado, Alex | Facilities | 38a/ 50b aru 007 | Replaced compressor temp module inside compressor electrical housing |
4/16/2025 15:20:18 | 3642 | Todd Wood | Other | Other | Piezo Rack | Place an electrical rack (Piezo Rack) into an electrically safe condition following steps outlined in CLP-413. Rack contains multiple sources of energy including hazardpus capacitors. Remove components from rack and prepare to ship back to LBL from Pinion Flats field site |
4/16/2025 9:12:17 | 3641 | Alejandro Lopez | Ramer, Robert | Facilities | 501A6A | Replace damage power receptacle by room 207B. |
4/16/2025 9:03:29 | 3640 | Colmenares | Cameron, Benjamin | Facilities | 266A33A | Replace blower motor 18 in room 297 |
4/16/2025 8:42:31 | 3639 | Juan juarez | Delgado, Alex | Facilities | M47A3A69A3A/74AC027 | Preventive maintenance |
4/16/2025 7:47:23 | 3638 | Mayumi Taylor | Keusch, Justen | Facilities | 727A39A | Loto |
4/15/2025 13:05:36 | 3637 | Antonio collado | Delgado, Alex | Facilities | M47a3a69a3a/ 74 ac 028 | Pm ac 28 |
4/15/2025 12:39:06 | 3636 | Alma Armenta | Cameron, Benjamin | Facilities | EU671A11A2A | Energize ckt 11 in EU671A11A2A |
4/15/2025 12:03:17 | 3635 | Juan juarez | Delgado, Alex | Facilities | 47A5A9A4A/74BAC001 | Preventive maintenance |
4/15/2025 10:01:46 | 3634 | Juan juares | Delgado, Alex | Facilities | 47A5A9A1A/74AAC001 | Preventive maintenance |
4/15/2025 9:14:45 | 3633 | Alma Armenta | Cameron, Benjamin | Facilities | 650A2A ckt 11 | Provide loto support for fire alarm |
4/15/2025 7:40:00 | 3632 | Alma Armenta | Cameron, Benjamin | Facilities | 637A10A, 635A1A4A31A, 637A, 637A10A | Establish LP-5662, LP-5671, LP-5675 |
4/14/2025 10:19:47 | 3631 | Colmenares | Cameron, Benjamin | Facilities | PNL-003-78 | Adjust compressor start stop settings |
4/14/2025 12:22:09 | 3630 | Robert Ralph | Combs, Everett | Facilities | 319A | Perform switching on 3 pole 208 v Circuit breakers and ZVV at equipment racks fed from circuit breakers being turned off |
4/14/2025 9:34:06 | 3629 | Alma Armenta | Cameron, Benjamin | Facilities | 86-TSW-001/ E570A | Install Data Logger in Panel |
4/14/2025 12:22:43 | 3628 | Mayumi Taylor | Keusch, Justen | ALS | Pnl 319A | Loto and zvv |
4/14/2025 8:06:30 | 3627 | Colmenares | Cameron, Benjamin | Facilities | E642A3A Ckt 18 | Assist fire alarm crew to identify shunt trip circuit for elevator one and two |
4/14/2025 7:24:21 | 3626 | Alma Armenta | Cameron, Benjamin | Facilities | 235A | Install Data Logger in Panel |
4/14/2025 7:20:24 | 3625 | Justin Solis | Delgado, Alex | Facilities | 31-ac-002-disc | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/14/2025 7:12:50 | 3624 | Justin walker | Delgado, Alex | Facilities | 513A1A1/B55CHILLER | Preventive maintenance and solenoid replacement |
4/14/2025 7:04:00 | 3623 | Capeto | Delgado, Alex | Facilities | 25A1A45A/ 50 AC 021 | Replace failed IFM |
4/14/2025 7:02:21 | 3622 | Gerald Fowler | Delgado, Alex | Facilities | 368A1A/environmental chamber | Pm on environmental chamber |
4/14/2025 6:52:52 | 3621 | Alma Armenta | Cameron, Benjamin | Facilities | 290A | Remove Data Logger in Panel |
4/11/2025 12:56:20 | 3620 | Capeto | Delgado, Alex | Facilities | PNL-003-71C | PM |
4/11/2025 12:51:17 | 3619 | Capeto | Delgado, Alex | Facilities | PNL-003-71C/ 71C AC 001 | PM |
4/11/2025 12:45:23 | 3618 | Justin walker | Delgado, Alex | Facilities | 514A6A-3/ 71 ac 009 | Perform scheduled maintenance |
4/11/2025 12:37:32 | 3617 | Alejandro Lopez | Ramer, Robert | Facilities | 244A2A | Airgap fume hood in room 247B at building 2 |
4/11/2025 11:37:55 | 3616 | Justin Walker | Delgado, Alex | Facilities | 514A2A4A/ 71 AC 007 | PM AC 007 |
4/11/2025 11:33:22 | 3615 | Justin Walker | Delgado, Alex | Facilities | 514a2a4a/71 AC 008 | PM 71 AC008 |
4/11/2025 7:44:47 | 3614 | Capeto | Delgado, Alex | Facilities | EM66A9A1A1A5KA/ 62 AC 010a | PM |
4/10/2025 11:31:42 | 3613 | Jeff Hendrick | Cameron, Benjamin | Facilities | 198A1A/9 | Switch tripped breaker |
4/10/2025 10:40:59 | 3612 | Capeto | Delgado, Alex | Facilities | 50A AC 009 | PM |
4/10/2025 9:55:25 | 3611 | Alejandro Lopez | Ramer, Robert | Facilities | 245A5A28A | Reset tripped main breaker in electrical panel 245A5A28A on 2nd floor building 2 |
4/10/2025 9:53:10 | 3610 | AndrewSouthward | Cameron, Benjamin | Facilities | EM31A18A2A | Troubleshoot VFD for 70A-bl-90 |
4/10/2025 9:13:46 | 3609 | Michal capeto | Delgado, Alex | Facilities | 38A12A34A/50FAC001 | Preventive maintenance |
4/10/2025 8:48:08 | 3608 | Sayee Chea | Keusch, Justen | Facilities | 635A1A4A32A | Will be replacing Exit lights and Bug eye fixtures |
4/10/2025 8:47:58 | 3607 | Justin walker | Delgado, Alex | Facilities | 404A-9/ 75B ac003 | Performed scheduled maintenance |
4/10/2025 8:42:15 | 3606 | Justin walker | Delgado, Alex | Facilities | 404A-3/ 75B ac 001 | Perform scheduled maintenance |
4/10/2025 8:24:47 | 3605 | Gerald Fowler | Delgado, Alex | Facilities | 404A/75B-AC-004 | Pm on wall mounted AC unit |
4/10/2025 8:19:39 | 3604 | Gerald Fowler | Delgado, Alex | Facilities | 404A/75B-AC-002 | Pm on wall mounted ac unit |
4/10/2025 7:06:04 | 3603 | Alma Armenta | Cameron, Benjamin | Facilities | 637A-ckt 16, 637A15A-ckt 31, 635A1A4A31A-ckt 1, 637A21A-ckt 4, 8, 12, 29, 31, 33, E642A-ckt4. | Establish LP-5588, LP-5593, LP-5590, LP-5451 |
4/9/2025 13:11:07 | 3602 | Capeto | Delgado, Alex | Facilities | 33 AC 001/ E642A3A | PM |
4/9/2025 11:54:30 | 3601 | Capeto | Delgado, Alex | Facilities | E642A3A/ 33 AC 003 | PM |
4/9/2025 10:20:09 | 3600 | Alejandro Lopez | Ramer, Robert | Facilities | 634A1A3A | Investigate feeder wire size and power disconnect fuse size feeding dishwasher in room 0236 at building 33 |
4/9/2025 10:12:27 | 3599 | Capeto | Delgado, Alex | Facilities | E642A3A/ 33 AC 005 | PM |
4/9/2025 9:12:54 | 3598 | Justin walker | Delgado, Alex | Facilities | E642a3a-5/33 ac 4 disconect | Perform scheduled maintenance |
4/9/2025 9:02:10 | 3597 | Capeto | Delgado, Alex | Facilities | 33 AC 006 | PM |
4/9/2025 7:17:12 | 3596 | Mayumi Taylor | Keusch, Justen | Facilities | PNL 305a4a2a | Turn off panel 305a4a2a ct 1 feeding transformer bank 579 and pnl 579A, Loto, zvv and pull wires to new equipment. |
4/9/2025 6:38:01 | 3595 | AndrewSouthward | Cameron, Benjamin | Facilities | 671A12A | Open main breaker 671A12A |
4/8/2025 12:38:53 | 3594 | Balbino Mercadal | Keusch, Justen | Facilities | 147A1B | Perform Monthly PM on emergency lighting |
4/8/2025 7:36:47 | 3593 | Capeto | Delgado, Alex | Facilities | 002-86/ 86 AC 002 | PM |
4/8/2025 7:26:46 | 3592 | Alma Armenta | Cameron, Benjamin | Facilities | 33B | Remove Data Logger in Panel |
4/8/2025 7:11:08 | 3591 | Gerald fowler | Delgado, Alex | Facilities | 305A3A/48AC006 | Preventive maintenance |
4/8/2025 7:05:19 | 3590 | Gerald fowler | Delgado, Alex | Facilities | 305A3A/48AC005 | Preventive maintenance |
4/8/2025 7:02:21 | 3589 | Mayumi Taylor | Keusch, Justen | Facilities | 579A | Loto and zvv |
4/8/2025 7:02:08 | 3588 | Christopher Nelson | Combs, Everett | Facilities | 342A1A19A | Investigate old receptacle in room 011A so we can LOTO it to change it to a quad receptacle |
4/8/2025 6:45:35 | 3587 | Alma Armenta | Cameron, Benjamin | Facilities | 501A6A | Remove Data Logger in Panel |
4/7/2025 8:25:19 | 3586 | Balbino Mercadal | Keusch, Justen | Facilities | EM304A3A1A1A | Replace ballast on inductive lamp |
4/7/2025 8:20:51 | 3585 | Mayumi Taylor | Keusch, Justen | Facilities | 342a1a19a52a | LOTO,ZVV |
4/7/2025 8:19:44 | 3584 | Christopher Nelson | Combs, Everett | Facilities | 579A | LOTO circuits to be relocated |
4/7/2025 8:18:28 | 3583 | Colmenares | Cameron, Benjamin | Facilities | 25A1A Ckt | Trouble shoot cause of GP 32 tripping |
4/7/2025 6:57:07 | 3582 | Alarmentaduran@lbl.gov | Cameron, Benjamin | Facilities | 36A2A1A | Install Data Logger in Panel |
4/4/2025 12:35:14 | 3581 | Shane Miller | Secheck, Stephen | Facilities | E160A | Add circuit and new breaker 2nd floor room 208 |
4/4/2025 8:45:08 | 3580 | Erik line | Keusch, Justen | Facilities | E80A3A17A28A1A | Install data logger on panel E80A3A17A28A1A for a 1 week load study. |
4/4/2025 7:53:24 | 3579 | Juan juarez | Delgado, Alex | Facilities | 25A18A/50AC025 | Preventive maintenance |
4/4/2025 7:12:01 | 3578 | Justin Solis | Delgado, Alex | Facilities | 67-vfd-20/ahu-003 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
4/4/2025 6:55:32 | 3577 | Andrew Southward | Cameron, Benjamin | Facilities | E65A | Install Data Logger in Panel |
4/3/2025 12:17:41 | 3576 | Capeto | Delgado, Alex | Facilities | 217A5A1A/ 26 AC 015 | PM |
4/3/2025 9:50:02 | 3575 | Justin walker | Delgado, Alex | Facilities | 513a7a11b1a-15. 55 ac 40 | Perform scheduled maintenance |
4/3/2025 9:42:01 | 3574 | Justin walker | Delgado, Alex | Facilities | 55 ac 35 disconnect | Perform scheduled maintenance |
4/3/2025 8:50:40 | 3573 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A11B1A/55-AC-036 | Pm for 55-AC-036 |
4/3/2025 8:32:23 | 3572 | Sayee Chea | Keusch, Justen | Facilities | 342A1A15C | Replacing existing light fixture with LED light fixture |
4/3/2025 8:22:31 | 3571 | Capeto | Delgado, Alex | Facilities | 513A7A11B1A/ 55 AC 046 | PM |
4/3/2025 8:03:46 | 3570 | Juan jaurez | Delgado, Alex | Facilities | 112A6A1B1A/4 | Preventive maintenance |
4/3/2025 7:57:16 | 3569 | Colmenares | Cameron, Benjamin | Facilities | 635A1A4A31A. Ckt 3 | Contractors to disconnect lights from junction boxes, and ceiling |
4/3/2025 7:50:22 | 3568 | Colmenares | Cameron, Benjamin | Facilities | 637A10A- 21 | Disconnect Lighting circuit for room 228 |
4/3/2025 7:42:51 | 3567 | AndrewSouthward | Cameron, Benjamin | Facilities | 84-EL-001 control panel | Perform LP-5651 |
4/2/2025 8:02:56 | 3566 | Colmenares | Cameron, Benjamin | Facilities | PNL-010-84 | Switching support for PMT‘s blower 18 |
4/2/2025 7:39:18 | 3565 | Antonio collado | Delgado, Alex | Facilities | E38a9a temp panel / want chiller aru 009 | Pm aru 009 |
4/1/2025 8:14:52 | 3564 | Colmenares | Cameron, Benjamin | Facilities | M70A4A8A | Switching support for PMT |
4/1/2025 7:20:25 | 3563 | Alma Armenta | Cameron, Benjamin | Facilities | 73A /73A1A | Establish LP-5579 |
4/1/2025 7:13:09 | 3562 | Colmenares | Cameron, Benjamin | Facilities | 525A | Assist contractors with troubleshooting of the outbound grizzly gate, provide Mo to work if necessary |
3/31/2025 10:36:32 | 3561 | Balbino Mercadal | Keusch, Justen | Facilities | 501A8A | Perform Monthly PM on the emergency lighting |
3/31/2025 10:25:11 | 3560 | Balbino Mercadal | Keusch, Justen | Facilities | 111A | Perform monthly PM on emergency lighting |
3/31/2025 9:21:44 | 3559 | AndrewSouthward | Cameron, Benjamin | Facilities | 91-AC-3 | Take current reading for AC-3 |
3/31/2025 8:15:30 | 3558 | Colmenares | Cameron, Benjamin | Facilities | 99A6A | Switching support for PMT’s |
3/31/2025 8:08:37 | 3557 | Jeff Hendrick | Cameron, Benjamin | Facilities | 25AC5/1 | GCJ is replacing 7 light fixtures |
3/31/2025 7:56:20 | 3556 | Mayumi Taylor | Keusch, Justen | ALS | 06-cr 002 disc | Loto and zvv disconnect |
3/31/2025 7:39:09 | 3555 | Walker juatin | Delgado, Alex | Facilities | 309A/34ARU004 | Annual preventative maintenance |
3/31/2025 7:35:41 | 3554 | Larry Antles | Delgado, Alex | Facilities | EM357A1A7A1AC3A/B86 AC 002 | Remove and clean burner assembly |
3/31/2025 7:31:12 | 3553 | Antonio collado | Delgado, Alex | Facilities | Em357a1a7a1ac3a/ ac 001 | 86 ac 001 clean burner assembly area |
3/31/2025 7:16:52 | 3552 | Colmenares | Cameron, Benjamin | Facilities | 637A15A Ckt 31 | Removal of a 208 receptacle |
3/31/2025 7:16:29 | 3551 | Alma Armenta | Cameron, Benjamin | Facilities | 116A1A40A / 116A1A | Install Data Logger in Panel |
3/31/2025 7:09:31 | 3550 | Mayumi Taylor | Keusch, Justen | ALS | Disconnect 546a5a-cb10 | Loto and zvv disconnect for crane |
3/28/2025 7:56:30 | 3549 | A Turner | Hendrick, Jeffery | Facilities | E671A11A1A cuts 4&6 | Demo GP 1&4 pumps and all electrical equipment associated with it wires pipes motors etc,etc,. |
3/28/2025 6:59:53 | 3548 | Alma Armenta | Cameron, Benjamin | Facilities | 596A1A9A | I’m perform PM on 59-BL-006 |
3/27/2025 13:24:45 | 3547 | Alma Armenta | Cameron, Benjamin | Facilities | E590A7A ckt 16 | Perform PM on 59-VFD-008 |
3/27/2025 13:18:07 | 3546 | Balbino Mercadal | Keusch, Justen | Facilities | W0430237 | Replace bug eyes emergency lighting fixtures |
3/27/2025 9:02:32 | 3545 | Alejandro Lopez | Ramer, Robert | Facilities | 674A | Replace damaged GFCI power outlet. |
3/27/2025 8:40:06 | 3544 | Colmenares | Hendrick, Jeffery | Facilities | E596A1A8A | Perform annual PM maintenance on VFD‘s |
3/27/2025 8:28:07 | 3543 | Larry Antles | Delgado, Alex | Facilities | 148A/76L AC 003 | replace drier and reversing valve |
3/27/2025 8:27:40 | 3542 | Colmenares | Hendrick, Jeffery | Facilities | 596A1A5A | Perform annual maintenance on VFD‘s |
3/27/2025 6:54:08 | 3541 | Alma Armenta | Cameron, Benjamin | Facilities | 671A12A | Support for 91U pump testing |
3/26/2025 11:49:52 | 3540 | Alma Armenta | Cameron, Benjamin | Facilities | 217A3A5A10A ckt. 3 | Remove Data Logger in Panel |
3/26/2025 8:55:58 | 3539 | Capeto | Delgado, Alex | Facilities | 72A AC 010 | PM |
3/26/2025 8:55:43 | 3538 | Justin Solis | Delgado, Alex | Facilities | 72a-ac-11 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/25/2025 11:51:28 | 3537 | Andrew Southward | Cameron, Benjamin | Facilities | 237A2A | Install Data Logger in Panel |
3/25/2025 10:42:08 | 3536 | Andrew Southward | Cameron, Benjamin | Facilities | 67A18A | Install Data Logger in Panel |
3/25/2025 7:44:56 | 3535 | Antonio collado | Delgado, Alex | Facilities | M238A4A/02ARU003 | Compressor replacement |
3/25/2025 6:28:36 | 3534 | Alma Armenta | Cameron, Benjamin | Facilities | 85E | Establish LP-5592 |
3/24/2025 12:37:47 | 3533 | Alma Armenta | Cameron, Benjamin | Facilities | 650A1A4A | Troubleshoot inverter 650A1A4A in bldg 30 |
3/24/2025 8:12:29 | 3532 | Gerald Fowler | Delgado, Alex | Facilities | M238A4A/02-ARU-003 | Replace failed compressor |
3/24/2025 7:38:37 | 3531 | Larry Antles | Delgado, Alex | Facilities | 99A6A/90 AC 31 | remove indoor fan motor |
3/21/2025 14:52:31 | 3530 | Ernie Jew | Grounds, Jeff | Comp Sci | 692A4A & 628A7A | Troubleshoot VFD alarms in CDUs D100 and D101 |
3/21/2025 9:39:51 | 3529 | Larry Antles | Delgado, Alex | Facilities | 36A2A9A8A/B58 AC 001 | PM B58 AC001 |
3/21/2025 8:07:08 | 3528 | Sayee Chea | Keusch, Justen | Facilities | 590A15A39A circuit 1 | Replacing ballasts |
3/20/2025 13:07:53 | 3527 | Larry Antles | Delgado, Alex | Facilities | 342A1A7A40A/B80A AC 001 | remove and replace outdoor fan motor |
3/20/2025 9:21:45 | 3526 | Alejandro Lopez | Ramer, Robert | Facilities | 25A5C | Identify lighting circuit feeding room 6005 at building 50. |
3/20/2025 8:25:20 | 3525 | Pica | Cameron, Benjamin | Facilities | MCC 001-85 and ATS 001 | Monthly Gen Test |
3/19/2025 12:20:33 | 3524 | Capeto | Delgado, Alex | Facilities | 212A/55A AC 003 | PM |
3/19/2025 9:06:43 | 3523 | Justin Solis | Delgado, Alex | Facilities | 25a18a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/19/2025 9:46:15 | 3522 | Greg Neidiger | Secheck, Stephen | Facilities | 25A18A10A-4 and 13 | Replace damaged receptacle |
3/19/2025 8:43:01 | 3521 | Sayee Chea | Keusch, Justen | Facilities | 467A2A /Crt 34 | Will be replacing bug eye fixtures |
3/19/2025 7:35:11 | 3520 | Mayumi Taylor | Keusch, Justen | ALS | 334a3a | Loto,zvv,replace receptacle |
3/19/2025 7:27:42 | 3519 | Alma Armenta | Cameron, Benjamin | Facilities | 85E | Replace floats for GP-25A, GP-25B, GP-28A, GP-28B |
3/18/2025 13:14:58 | 3518 | Shane Miller | Secheck, Stephen | Facilities | 25A6A | Reset tripped breaker |
3/18/2025 13:14:57 | 3517 | Capeto | Delgado, Alex | Facilities | E43A1A/ 26 AC 018 | PM |
3/18/2025 13:14:33 | 3516 | Balbino Mercadal | Keusch, Justen | Facilities | 253B1A33A | Replace ballast as needed |
3/18/2025 13:00:29 | 3515 | Balbino Mercadal | Keusch, Justen | Facilities | 491A9A | Lights out in the hallway outside r105 |
3/18/2025 12:54:50 | 3514 | Alma Armenta | Cameron, Benjamin | Facilities | 79A | Install Data Logger in Panel |
3/18/2025 10:50:12 | 3513 | Mayumi Taylor | Combs, Everett | Facilities | 319A | Switch Tripped. Breaker |
3/18/2025 10:47:32 | 3512 | Colmenares | Cameron, Benjamin | Facilities | MCC70A4A12A1A | Switching support for PMT‘s |
3/18/2025 9:33:57 | 3511 | Sayee Chea | Keusch, Justen | Facilities | E38A9A3A | Will be replacing Emergency Light fixtures |
3/18/2025 8:00:38 | 3510 | Gerald Fowler | Delgado, Alex | Facilities | E362A1A | Pm for 15-AC-001 |
3/18/2025 8:00:15 | 3509 | Capeto | Delgado, Alex | Facilities | E362A1A/ 15 AC 002 | PM |
3/18/2025 7:36:08 | 3508 | Avery Turner | Cameron, Benjamin | Facilities | 2388981ACKT – 52 | Establish LOTTO |
3/18/2025 7:00:04 | 3507 | Andrew Southward | Cameron, Benjamin | Facilities | 467A | Perform LP-5578 |
3/17/2025 8:37:31 | 3506 | Colmenares | Cameron, Benjamin | Facilities | M512A7A | Switching support for PMT’s |
3/17/2025 8:25:02 | 3505 | Colmenares | Cameron, Benjamin | Facilities | 266A33A | Switching support for PMT‘s |
3/17/2025 7:20:13 | 3504 | Justin Solis | Delgado, Alex | Facilities | 596a1a1a39a-3/rtu-004-59 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
3/15/2025 7:22:46 | 3503 | Sayee Chea | Keusch, Justen | Facilities | 671A11A9A | Will be replacing light fixtures |
3/14/2025 13:09:29 | 3502 | Balbino Mercadal | Keusch, Justen | Facilities | 190A9A | Perform Monthly PM on emergency lighting |
3/13/2025 13:28:42 | 3501 | Balbino Mercadal | Keusch, Justen | Facilities | 73A4B | Re-lamp paint room with LED lamps |
3/13/2025 9:54:36 | 3500 | Andrew Southward | Cameron, Benjamin | Facilities | 730A | Temp power feed to FAP |
3/13/2025 9:51:03 | 3499 | Mayumi Taylor | Keusch, Justen | ALS | 302A1A | Lotto,zvv |
3/13/2025 9:11:08 | 3498 | Mayumi Taylor | Keusch, Justen | ALS | 280A | Turn circuits 9&11 on |
3/13/2025 8:38:04 | 3497 | Alma Armenta | Cameron, Benjamin | Facilities | 344A3A ckt 16 | Isolate feed for fire alarm panel for FLP-641 |
3/13/2025 8:02:58 | 3496 | Antonio collado | Delgado, Alex | Facilities | Mcc38a6a/ ahu 007 rm 2265 | Remove beating from ahu , inspect drain pan |
3/13/2025 7:53:04 | 3495 | Andrew Southward | Cameron, Benjamin | Facilities | 15A15A | Temp up FAP |
3/12/2025 13:18:19 | 3494 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2A6A | Perform Monthly PM on emergency lighting fixtures. |
3/12/2025 8:27:50 | 3493 | Joseph Pica | Cameron, Benjamin | Facilities | 35B26A-1 | LOTO Lighting circuit to remove and safety fluorescent fixture |
3/12/2025 8:12:44 | 3492 | Justin walker | Delgado, Alex | Facilities | 80A3A17A-23. / 88Aru 012 | Perform scheduled maintenance |
3/12/2025 7:39:08 | 3491 | Gerald Fowler | Delgado, Alex | Facilities | 631A3A/56A-AC-002 | Replace defrost control |
3/11/2025 9:44:56 | 3490 | Alma Armenta | Cameron, Benjamin | Facilities | M550A2A-1 | Replace motor for 67-BL-13 |
3/11/2025 7:28:51 | 3489 | Capeto | Delgado, Alex | Facilities | 25A1A/ VFDs for BL 03 and BL 06 | Repair leak at heating coil |
3/11/2025 7:21:59 | 3488 | Alma Armenta | Cameron, Benjamin | Facilities | 546A7A | Troubleshoot return air for AHU-2 |
3/10/2025 13:17:49 | 3487 | Balbino Mercadal | Keusch, Justen | Facilities | E43A5A | Perform Monthly PM on emergency lighting |
3/10/2025 13:05:54 | 3486 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Perform Monthly PM on emergency lighting |
3/10/2025 9:28:05 | 3485 | Larry Amntles | Delgado, Alex | Facilities | 15A15A-65/Bm53 UH 11 | remove and replace B53 UH 11 blower motor |
3/10/2025 9:09:03 | 3484 | Robert Ralph | Combs, Everett | Facilities | 310A | Non hazardous switching |
3/10/2025 7:58:11 | 3483 | Alma Armenta | Cameron, Benjamin | Facilities | 290A | Install Data Logger in Panel |
3/7/2025 9:50:04 | 3482 | Christopher | Combs, Everett | Facilities | 314A/Ba So1314, 318A/, S061314, 322A/S01013 | Switch Safety Racks back on |
3/7/2025 8:32:39 | 3481 | Alma Armenta | Cameron, Benjamin | Facilities | 33B | Install Data Logger in Panel |
3/7/2025 7:18:45 | 3480 | Andrew Southward | Cameron, Benjamin | Facilities | 501A6A | Install Data logger |
3/6/2025 14:50:05 | 3479 | greg neidiger | Combs, Everett | ALS | 15A15A58A-11 | remove broken prong from receptacle |
3/6/2025 8:51:35 | 3478 | Alma Armenta | Cameron, Benjamin | Facilities | M70A2A6A | Support seal kit change out for motor 20 @70 for PMT’s. |
3/6/2025 8:12:37 | 3477 | Andrew Southward | Cameron, Benjamin | Facilities | MCC70A2A6A | Remove GP-20-70 for seal repair. |
3/5/2025 12:56:11 | 3476 | Colmenares | Cameron, Benjamin | Facilities | 70A4A12A1A | There’s been a complaint about noise coming from the ventilation system systematically shut down AU 39, 4041 and 33 to see if noise goes away |
3/5/2025 10:06:32 | 3475 | Christopher Nelson | Combs, Everett | Facilities | 323A / BA B0107 | Switch and LOTO and ZVV BA panel Rack B0107 for Data Workers to pull new network cable. |
3/5/2025 8:52:11 | 3474 | Colmenares | Cameron, Benjamin | Facilities | M34A19A10A | Replace GP 32 motor pump assembly with PMT’s |
3/5/2025 8:22:11 | 3473 | Alma Armenta | Cameron, Benjamin | Facilities | 91-AC-004 VFD DISC | Change out VFD for 91-AC-004 |
3/5/2025 8:17:33 | 3472 | Christopher Nelson | Combs, Everett | Facilities | 324A / B030714 | switch BA panel B030714 off and ZVV for ALS to have Data workers pull a new networking cable in This Rack. Via Breaker # 27 in Panel 324A |
3/5/2025 6:02:03 | 3471 | Balbino Mercadal | Keusch, Justen | Facilities | 29A15A1A | Replace battery on emergency lighting fixture |
3/4/2025 12:34:08 | 3470 | Mike Rose | Cameron, Benjamin | Facilities | Bus 101 | Complete Lotto LP 3248 |
3/4/2025 8:32:03 | 3469 | Avery J Turner | Cameron, Benjamin | Facilities | Blower 03, 04, AHU2 sup and Return | Switching and LOTO Support Roof Exh Blowers AHU02 |
3/4/2025 7:24:01 | 3468 | Alma Armenta | Cameron, Benjamin | Facilities | 85-AD-22 | Replace motor for 85-BL-022 |
3/4/2025 6:27:36 | 3467 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A1A | Perform Monthly PM on emergency lighting |
3/3/2025 18:36:12 | 3466 | Michel Kireeff Covo | Other | Other | Main Magnet Power Supply | Inspection BJ1--28/30 Air Flow Switch |
3/3/2025 11:30:01 | 3465 | Mayumi Taylor | Keusch, Justen | Facilities | 318A | Turn off breaker in PNL318A circuit 38 |
3/3/2025 9:36:54 | 3464 | Alma Armenta | Cameron, Benjamin | Facilities | 189A10A | Install Data Logger in Panel |
3/3/2025 7:48:44 | 3463 | Colmenares | Cameron, Benjamin | Facilities | 38A | Switching support for HVAC |
3/3/2025 7:38:57 | 3462 | Capeto | Delgado, Alex | Facilities | 38A/ 50B ARU 007 | PM |
3/3/2025 7:05:07 | 3461 | Alma Armenta | Cameron, Benjamin | Facilities | 635A1A3A | Establish LP-5607 |
2/28/2025 13:03:50 | 3460 | Balbino Mercadal | Keusch, Justen | Facilities | 454A | Perform Monthly PM on emergency lighting |
2/28/2025 10:35:28 | 3459 | Joko | Hendrick, Jeffery | Facilities | Bus 101 | ZVV install grounds complete cable termination in testing |
2/28/2025 9:31:17 | 3458 | Capeto | Delgado, Alex | Facilities | 514A1A/71 AHU 036 | PM |
2/28/2025 8:40:47 | 3457 | Gerald Fowler | Delgado, Alex | Facilities | 514A6A/71-ARU-008 | Perform leak inspection |
2/28/2025 8:38:24 | 3456 | Capeto | Delgado, Alex | Facilities | 514A1A7A/ 71 AHU 039 | PM |
2/28/2025 8:24:57 | 3455 | Andrew Southward | Cameron, Benjamin | Facilities | EU671A11A1A11A | Move circuits in panel EU671A11A1A11A according to engineer drawings |
2/28/2025 8:00:46 | 3454 | Colmenares | Cameron, Benjamin | Facilities | 30A4A5A | Switching support for PMT’s |
2/28/2025 7:45:16 | 3453 | Larry Antles | Delgado, Alex | Facilities | 90A9A/90 AC 43 | Remove and Replace B90 AC 43 Condenser Fan and Motor assembly |
2/27/2025 13:11:40 | 3452 | Shane Miller | Secheck, Stephen | Facilities | 138A | Add exit light in office |
2/27/2025 8:38:12 | 3451 | Larry Antles | Delgado, Alex | Facilities | E679A1A5A/RM 261 Enviro Cond | PM RF 261 |
2/27/2025 8:30:54 | 3450 | Capeto | Delgado, Alex | Facilities | E679A1A5A/91 RF 262 | PM |
2/27/2025 8:20:15 | 3449 | Justin walker | Delgado, Alex | Facilities | E38A9A-10 | Perform scheduled maintenance |
2/27/2025 8:03:26 | 3448 | Justin walker | Delgado, Alex | Facilities | 38A1A/50BAHU029 | Preventive maintenance |
2/27/2025 7:57:48 | 3447 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A2A Ckt 9 | VFD annual P.M’s |
2/26/2025 13:12:42 | 3446 | Luis Perez | Other | Other | TEST | TEST |
2/26/2025 11:54:20 | 3445 | Andrew Southward | Cameron, Benjamin | Facilities | E31A18A3F | Troubleshoot GP-40/41 |
2/26/2025 10:31:30 | 3444 | Andrew Southward | Cameron, Benjamin | Facilities | 35A10A | Troubleshoot gp-33 |
2/26/2025 10:31:07 | 3443 | Scott Small | Other | Other | B88 Cave 1 Beam Plug | Electrically disconnect Beam Plug DC Motor (150 VDC, 2A) |
2/26/2025 9:40:29 | 3442 | Alma Armenta | Cameron, Benjamin | Facilities | M218A1A | Troubleshoot 37-BL-102 |
2/26/2025 8:52:45 | 3441 | Capeto | Delgado, Alex | Facilities | 99A6A/ 90 AC 031 | PM |
2/26/2025 8:45:17 | 3440 | Alma Armenta | Cameron, Benjamin | Facilities | EM66A9A1A1A | Troubleshoot 62-BL-246 |
2/26/2025 8:34:19 | 3439 | Colmenares | Cameron, Benjamin | Facilities | 91 MP 001 | Vacuum Systems PM |
2/26/2025 8:21:16 | 3438 | Colmenares | Cameron, Benjamin | Facilities | 81-KC-001 Disc | Switching support for Contractor maintenance actions |
2/26/2025 7:57:26 | 3437 | Joe pica | Hendrick, Jeffery | Facilities | 70A EL 1 | Repair |
2/26/2025 7:42:17 | 3436 | Gerald walker | Delgado, Alex | Facilities | 44A1B/46AC044 | Compressor replacement |
2/26/2025 7:15:42 | 3435 | Alma Armenta | Cameron, Benjamin | Facilities | 637A21A / 642A4A / 63A15A | Establish LP-5590 and LP-5573 |
2/25/2025 14:21:15 | 3434 | Capeto | Delgado, Alex | Facilities | 229A/ 90 AC 035 | PM |
2/25/2025 11:04:28 | 3433 | Justin walker | Delgado, Alex | Facilities | 513A7A11B1A-2/4/6. 55 ac 37 | Replace faulty ck board |
2/25/2025 10:33:49 | 3432 | Colmenares | Cameron, Benjamin | Facilities | 650A2A Ckt 7 | Replace oil switch sensor for MP001 and 002 |
2/25/2025 10:08:08 | 3431 | Ernie Jew | Grounds, Jeff | Comp Sci | B59 Cooling Towers 1-7 | Installing float sensors at Cooling Towers |
2/25/2025 9:01:51 | 3430 | Erik Line | Keusch, Justen | Facilities | 88-VFD-020 (88-GP-62) | LOTO GP 062 for the Plumber |
2/25/2025 8:31:57 | 3429 | Colmenares | Cameron, Benjamin | Facilities | 99A5A | Switch support for PMT’s |
2/25/2025 7:54:02 | 3428 | Colmenares | Cameron, Benjamin | Facilities | 266A33A Ckt 8 | Airgap gap AHU 19 At building 64 |
2/25/2025 7:47:48 | 3427 | Capeto | Delgado, Alex | Facilities | 80A3A17A/ 88 ARU 012 | Insulation blanket install and installing crank case heaters |
2/25/2025 7:33:24 | 3426 | Alma Armenta | Cameron, Benjamin | Facilities | UE592A | Remove Data Logger in Panel |
2/25/2025 6:40:33 | 3425 | Andrew Southward | Cameron, Benjamin | Facilities | 246A4A | Install Data Logger in Panel |
2/24/2025 13:33:19 | 3424 | Balbino Mercadal | Keusch, Justen | Facilities | 420A8A1A | Perform Monthly PM on emergency lighting |
2/24/2025 13:13:56 | 3423 | Capeto | Delgado, Alex | Facilities | 92A4A/ 90 AC 030 | PM |
2/24/2025 9:42:15 | 3422 | Colmenares | Cameron, Benjamin | Facilities | E650A5A1A2A at 0.88 cal and 650A2A2A at 0.39 cal | Perform preventive maintenance to VFD’s |
2/24/2025 9:28:09 | 3421 | Capeto | Delgado, Alex | Facilities | 90 A9A/ 90 AC 048 | PM |
2/24/2025 9:12:51 | 3420 | Dave Davis | Combs, Everett | Facilities | M304A3A5A and 334A | Remove circuits 31& 33 unless conductors can be used for current project. Either way panel 334A has to be shutdown and ZVV in order to research existing conductors. |
2/24/2025 8:43:24 | 3419 | Andrew Southward | Cameron, Benjamin | Facilities | 217A3A5A10A | Install Data Logger in Panel |
2/24/2025 8:25:25 | 3418 | Capeto | Delgado, Alex | Facilities | 99A2A/ 90AC 032 | PM |
2/24/2025 8:24:50 | 3417 | Erik Line | Keusch, Justen | Facilities | GP-5-88 | Establish LOTO for PMT’s |
2/24/2025 7:57:52 | 3416 | Alma Armenta | Cameron, Benjamin | Facilities | 555A | Remove Data Logger in Panel |
2/24/2025 7:10:36 | 3415 | Ben Cameron | Hendrick, Jeffery | Facilities | 50A-CT-6 | Replace 50A CT 6 VFD bypass enclosure |
2/21/2025 14:58:07 | 3414 | Larry Antles | Delgado, Alex | Facilities | 513A1A1A/55A chiller | Troubleshoot phase monitor alarm |
2/21/2025 12:47:38 | 3413 | Alejandro Lopez | Ramer, Robert | Facilities | E594A 591A40A | Provide new power outlets for SES in room 3102 at building 59. |
2/21/2025 12:47:16 | 3412 | Shane Miller | Secheck, Stephen | Facilities | 595A40A | Loto Circuit and re-route power to access control panel |
2/21/2025 9:21:41 | 3411 | Justin walker | Delgado, Alex | Facilities | 90A90-10 | Perform scheduled maintenance |
2/21/2025 8:39:19 | 3410 | Alma Armenta | Cameron, Benjamin | Facilities | 67A18A | Remove Data Logger in Panel |
2/21/2025 8:02:32 | 3409 | Andrew Southward | Cameron, Benjamin | Facilities | 70A2A | Remove Data Logger in Panel |
2/21/2025 7:35:17 | 3408 | Alma Armenta | Cameron, Benjamin | Facilities | 38A2A | Remove Data Logger in Panel |
2/21/2025 7:31:49 | 3407 | Colmenares | Cameron, Benjamin | Facilities | E72A9B1A Ckt 1 and 2 | PMT support switching often on blower 68 and 69 |
2/21/2025 6:59:18 | 3406 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A3A | Remove Data Logger in Panel |
2/21/2025 6:33:47 | 3405 | Andrew Southward | Cameron, Benjamin | Facilities | 501A5A4A | Install Data Logger in Panel |
2/20/2025 9:11:51 | 3404 | Erik Line | Keusch, Justen | Facilities | 355A15A | Installing new breaker on a power supply |
2/20/2025 7:47:03 | 3403 | Alma Armenta | Cameron, Benjamin | Facilities | 35A11B | Establish FLP-600 to replace VFD for CT-6 |
2/20/2025 7:18:04 | 3402 | Colmenares | Cameron, Benjamin | Facilities | MCC ON ROOF | Support Kone elevator crew |
2/19/2025 13:28:08 | 3401 | Balbino Mercadal | Keusch, Justen | Facilities | 491A9A | Replace wall sensor light switch |
2/19/2025 13:19:49 | 3400 | Balbino Mercadal | Keusch, Justen | Facilities | 30A3A4E | Replace emergency lighting fixture |
2/19/2025 12:32:22 | 3399 | Colmenares | Cameron, Benjamin | Facilities | Autoclave1 and 2 disconnect PNL 671A1A3A Ckt 1,2,3,4,56 and | Perform ohm checks to heating elements power off and then amp readings mode 2 work to test auto clave heaters |
2/19/2025 9:31:39 | 3398 | Colmenares | Cameron, Benjamin | Facilities | M70A4A8A | PMT is switching support |
2/19/2025 7:40:55 | 3397 | Andrew Southward | Cameron, Benjamin | Facilities | 303A1A | Install Data Logger in Panel |
2/19/2025 7:16:34 | 3396 | Colmenares | Cameron, Benjamin | Facilities | 59-PNL-32 | Switching support for contractors |
2/18/2025 12:22:38 | 3395 | Shane Miller | Secheck, Stephen | Facilities | 87D | Loto,ZVV panel 87D. Pull in new circuit, change breaker, inspect work. |
2/18/2025 11:45:07 | 3394 | Balbino Mercadal | Keusch, Justen | Facilities | 38A2B2A | Perform Monthly PM on emergency lighting |
2/18/2025 11:27:58 | 3393 | Balbino Mercadal | Keusch, Justen | Facilities | 35B4A | Perform Monthly PM on emergency lighting |
2/18/2025 9:37:49 | 3392 | Sayee Chea | Keusch, Justen | Facilities | E250A | Installing Exit Light fixtures |
2/18/2025 8:31:05 | 3391 | Capeto | Delgado, Alex | Facilities | 001 70A/ 70A ARU 001 | PM |
2/18/2025 8:01:20 | 3390 | Larry Antles | Delgado, Alex | Facilities | 491A9A/B85B AC 002 | PM B85B AC 002 |
2/18/2025 7:59:40 | 3389 | Juan juarez | Delgado, Alex | Facilities | 491A4A/85bac004 | Preventive maintenance |
2/18/2025 7:56:29 | 3388 | Larry Antles | Delgado, Alex | Facilities | 491A3A/B85b AC001 | PM B85B AC 001 |
2/18/2025 7:55:17 | 3387 | Juan juarez | Delgado, Alex | Facilities | 491A10A/85BAC003 | Preventive maintenance |
2/18/2025 7:37:02 | 3386 | Antonio Collado | Delgado, Alex | Facilities | 85f/ anodize chiller | Troubleshoot chiller for plating shop |
2/18/2025 7:32:17 | 3385 | Colmenares | Cameron, Benjamin | Facilities | 613-A5A | Swishy support under LP 5577 |
2/14/2025 10:37:07 | 3384 | Erik Line | Keusch, Justen | Facilities | A3221 | Demoing one circuit feeding a receptacle. |
2/14/2025 10:27:21 | 3383 | Colmenares | Cameron, Benjamin | Facilities | 02 -BL-017 disc | Assist PMT,s with motor replacement BL-17 |
2/14/2025 9:36:32 | 3382 | Erik Line | Keusch, Justen | Facilities | 81A9A | Replacing receptacle |
2/14/2025 8:08:59 | 3381 | Mayumi Taylor | Keusch, Justen | Facilities | 579A | Disconnecting bandsaw from power in building 80 room 011a |
2/14/2025 7:33:18 | 3380 | Larry Antles | Delgado, Alex | Facilities | E650A5A1A2A/30-AHU 006 | PM B30 AHU 006 |
2/14/2025 7:28:03 | 3379 | Larry Antles | Delgado, Alex | Facilities | E650A5A1A2A/30 AHU 001 | PM B30 AHU 001 |
2/14/2025 7:13:09 | 3378 | Alma Armenta | Cameron, Benjamin | Facilities | 85B28A | Remove Data Logger in Panel |
2/13/2025 11:28:37 | 3377 | Larry Antles | Delgado, Alex | Facilities | 247A1A/B2 AHU 002 | Troubleshoot AHU 002 |
2/13/2025 10:30:51 | 3376 | Capeto | Delgado, Alex | Facilities | 221A/ 55 AC 031 (55 SSI 001) | Switch |
2/13/2025 9:47:31 | 3375 | Alma Armenta | Cameron, Benjamin | Facilities | 72A4A | Establish simple loto for auger/conveyor system |
2/13/2025 8:38:03 | 3374 | Ben Cameron | Hendrick, Jeffery | Facilities | M550A1A4A | VFD pm |
2/13/2025 7:39:19 | 3373 | Alma Armenta | Cameron, Benjamin | Facilities | 38A1A6A10A | Remove Data Logger in Panel |
2/13/2025 7:03:58 | 3372 | Alma Armenta | Cameron, Benjamin | Facilities | 501A | Remove Data Logger in Panel |
2/12/2025 12:55:48 | 3371 | AndrewSouthward | Cameron, Benjamin | Facilities | AHU-36-71 | Troubleshoot run command for ahu-36 |
2/12/2025 10:49:10 | 3370 | Alma Armenta | Cameron, Benjamin | Facilities | E363A1A | Troubleshoot battery charger circuit for EG81 |
2/12/2025 8:46:05 | 3369 | Colmenares | Cameron, Benjamin | Facilities | 67-PNL-031 | Shut off power as per LP 5576 |
2/12/2025 7:26:04 | 3368 | Andrew Southward | Cameron, Benjamin | Facilities | 66A | Switching support for ARU-07-62 |
2/11/2025 11:51:32 | 3367 | Capeto | Delgado, Alex | Facilities | 218A2AC3A1A/ 43 AC 002 | PM |
2/11/2025 11:49:13 | 3366 | Juan juarez | Delgado, Alex | Facilities | 218A2AC3A1A/43AC002 | Preventive maintenance |
2/11/2025 9:27:47 | 3365 | AJTurner | Cameron, Benjamin | Facilities | MCC70A4A8A | ReleaseLOTO Energize Loads Confirm Rotation |
2/11/2025 8:32:47 | 3364 | AJ Turner | Cameron, Benjamin | Facilities | 266A40A9A-3 | Evaluate and Reset Tripped CB |
2/11/2025 8:11:11 | 3363 | Larry Antles | Delgado, Alex | Facilities | 512/ 91U Temp Chiller | Troubleshoot Pump Fault |
2/11/2025 7:15:58 | 3362 | Capeto | Delgado, Alex | Facilities | 513A11B11A/ 55 AC 042 | PM |
2/11/2025 7:11:00 | 3361 | Juan juarez | Delgado, Alex | Facilities | 513A7A11B1A/55AC043 | Preventive maintenance |
2/10/2025 13:53:18 | 3360 | David Davis | Keusch, Justen | Facilities | 310A | LOTO and ZVV BA panel |
2/10/2025 8:24:08 | 3359 | Ben cameron | Cameron, Benjamin | Facilities | 246A4A10A | Switching and motor replacement |
2/10/2025 7:49:24 | 3358 | Capeto | Delgado, Alex | Facilities | 631A3A/ 56A AC 002 | PM |
2/10/2025 7:46:03 | 3357 | Gerald Fowler | Delgado, Alex | Facilities | 631A4A/56A-AC-003 | Pm for 56A-AC-003 |
2/10/2025 7:28:06 | 3356 | Juan Juárez | Delgado, Alex | Facilities | 631A10A/ 56AAC005 | Preventive maintenance |
2/10/2025 7:22:31 | 3355 | Juan juarez | Delgado, Alex | Facilities | 631A21A/56AAC001 | Preventive maintenance |
2/10/2025 7:20:04 | 3354 | Antonio Collado | Delgado, Alex | Facilities | 631a9a/ 56a ac 004 | Pm ac 004 |
2/10/2025 7:16:18 | 3353 | Antonio collado | Delgado, Alex | Facilities | 631a16a/ 56a ac 007 | Pm on ac 007 |
2/7/2025 12:45:22 | 3352 | Antonio Collado | Delgado, Alex | Facilities | 513a7a5a/ 55 ac 052 | Inspect unit for burnt smell |
2/7/2025 12:35:59 | 3351 | Balbino Mercadal | Keusch, Justen | Facilities | 44A1A33A | Perform Monthly PM on emergency lighting |
2/7/2025 12:02:59 | 3350 | Andrew Southward | Cameron, Benjamin | Facilities | MCC72E | Troubleshoot VFD alarm for GP-51 |
2/7/2025 8:55:45 | 3349 | Colmenares | Cameron, Benjamin | Facilities | 2BL13 | PMT Switching Support |
2/7/2025 8:41:11 | 3348 | Antonio Collado | Delgado, Alex | Facilities | 513a7a5a/ 55 ac 024 | Troubleshoot ac 24 |
2/7/2025 7:21:45 | 3347 | Larry Antles | Delgado, Alex | Facilities | 47A3A/74 AC 19 | PM B74 AC 19 |
2/6/2025 13:32:37 | 3346 | Balbino Mercadal | Keusch, Justen | Facilities | 266A10A | Replace ballast as needed |
2/6/2025 10:54:26 | 3345 | Larry Antles | Delgado, Alex | Facilities | 38A11A | Check operations |
2/6/2025 9:14:58 | 3344 | Mayumi Taylor | Keusch, Justen | ALS | 277A | Replace GFCI in sector 12 on bench |
2/6/2025 8:11:43 | 3343 | Andrew Southward | Cameron, Benjamin | Facilities | 596A1A4A-15 | Troubleshoot ahu-19 |
2/6/2025 7:49:44 | 3342 | Alma Armenta | Cameron, Benjamin | Facilities | 35C | Troubleshoot 50A-GP-31 |
2/5/2025 12:53:08 | 3341 | Capeto | Delgado, Alex | Facilities | E305A3A39A1A1A/ 48 SSI 01 | Electrical troubleshooting |
2/5/2025 7:38:22 | 3340 | Alma Armenta | Cameron, Benjamin | Facilities | E191A1A2A | Replace motors for BL-74 & BL-75 |
2/5/2025 7:30:33 | 3339 | Beau erwin | Keusch, Justen | ALS | 334A/26 | Replace motor on roll up door |
2/5/2025 7:30:03 | 3338 | Walker justin | Delgado, Alex | Facilities | M215A5A/66AC002 | Annual maintenance chiller |
2/5/2025 7:12:14 | 3337 | Capeto | Delgado, Alex | Facilities | 514A1A/ 71 AHU 036 | Troubleshooting blower motor |
2/5/2025 6:59:31 | 3336 | Colmenares | Cameron, Benjamin | Facilities | PNL-010-69 | LP-5559 replace receptacle |
2/4/2025 13:15:02 | 3335 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A31A | Perform Monthly PM on emergency lighting |
2/4/2025 7:20:53 | 3334 | Beau Erwin | Keusch, Justen | ALS | 334A | Loto for roll up door work |
2/3/2025 13:06:03 | 3333 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Light sensor don't work.Replace sensor as needed |
2/3/2025 12:57:51 | 3332 | Alejandro Lopez | Ramer, Robert | Facilities | 33X1A3A | Replace damaged EV car charger |
2/3/2025 8:08:55 | 3331 | Andrew Southward | Cameron, Benjamin | Facilities | M550A1A4A | Troubleshoot pressure switch for KC-001 |
2/3/2025 7:40:34 | 3330 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL-20 | Demo circuit 19 and 25 to the nearest boxing ceiling |
2/3/2025 7:30:14 | 3329 | Colmenares | Cameron, Benjamin | Facilities | 635A1A Ckt 3 | Remove circuit four wires conduit to panel by contractors |
2/3/2025 7:24:08 | 3328 | Capeto | Delgado, Alex | Facilities | 215A5A/ 66 ARU 001 | PM |
2/3/2025 7:14:33 | 3327 | Colmenares | Cameron, Benjamin | Facilities | 33-PNL 005 | Lotto out Lighting circuit to Contractor Can separate circuit |
1/31/2025 12:12:20 | 3326 | Juan juarez | Delgado, Alex | Facilities | E362A1A/15AC002 | Preventive maintenance |
1/31/2025 12:08:27 | 3325 | Juan Juárez | Delgado, Alex | Facilities | E362A1A/15AC001 | Preventive maintenance |
1/31/2025 8:05:07 | 3324 | Justin walker | Delgado, Alex | Facilities | 564A-12 | Scheduled pm |
1/31/2025 7:39:41 | 3323 | Capeto | Delgado, Alex | Facilities | 99A6A/ 90 BR 005 | Diagnose failure on boiler |
1/30/2025 8:20:40 | 3322 | Colmenares | Cameron, Benjamin | Facilities | 34CT2 | CT 2 PM |
1/30/2025 7:31:23 | 3321 | Colmenares | Cameron, Benjamin | Facilities | 357A1A5 | LOTO / ZVV for contractors |
1/29/2025 9:21:27 | 3320 | Erik Line | Keusch, Justen | Facilities | 355A | De-energizing panel to re route power for receptacles. |
1/29/2025 6:34:15 | 3319 | Andrew Southward | Cameron, Benjamin | Facilities | VFD-BL-018-84 | Reset/troubleshoot BL-18-84 |
1/27/2025 13:59:37 | 3318 | Balbino Mercadal | Keusch, Justen | Facilities | 266A10A | Replace ballasts and lamps outages |
1/27/2025 13:20:12 | 3317 | Capeto | Delgado, Alex | Facilities | 176A21C/90 AC 002 | PM |
1/27/2025 10:08:30 | 3316 | Capeto | Delgado, Alex | Facilities | 305A4A1A1A/80 AC 029 | PM |
1/27/2025 10:07:32 | 3315 | Antonio Collado | Delgado, Alex | Facilities | 305a4a1a1a/ 80 ac 028 | Pm on ac 28 |
1/27/2025 9:24:02 | 3314 | Capeto | Delgado, Alex | Facilities | 25A1A25A/ 50 AC 021 | PM |
1/27/2025 8:02:37 | 3313 | Juan juarez | Delgado, Alex | Facilities | E363A1A/62BAC001 | High pressure control replacement |
1/27/2025 8:00:12 | 3312 | Justin Solis | Delgado, Alex | Facilities | 550a1a-39/aru-001-67a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/24/2025 9:13:44 | 3311 | Alma Armenta | Cameron, Benjamin | Facilities | 31A7G | Establish LP-5315 |
1/24/2025 8:20:54 | 3310 | Colmenares | Cameron, Benjamin | Facilities | 56-Vfd006, 005, 002, 004 | Switch blower two blower AHU 1&2 |
1/23/2025 13:21:02 | 3309 | Balbino Mercadal | Keusch, Justen | Facilities | 35B16B | Replace lamps and ballasts as needed |
1/23/2025 12:22:03 | 3308 | Gerald Fowler | Delgado, Alex | Facilities | 513A7A5A/55-AC-052 | Pm for 55-AC-052 |
1/23/2025 10:29:18 | 3307 | Erik Line | Keusch, Justen | Facilities | 124A2B28A ct-10 | Switching Breaker |
1/23/2025 9:49:52 | 3306 | Colmenares | Cameron, Benjamin | Facilities | PNL-83-74 | Troubleshoot MP 009 to find cause of tripping record current readings |
1/23/2025 8:42:15 | 3305 | Colmenares | Cameron, Benjamin | Facilities | 375A1A | Test emergency generator |
1/23/2025 8:34:05 | 3304 | Andrew Southward | Cameron, Benjamin | Facilities | 555A | Install Data Logger in Panel |
1/23/2025 8:10:57 | 3303 | Gerald Fowler | Delgado, Alex | Facilities | 179A/69-AC-011 | Pm for 69-AC-011 |
1/23/2025 8:08:00 | 3302 | Andrew Southward | Cameron, Benjamin | Facilities | 189A5A | Install Data Logger in Panel |
1/22/2025 13:32:23 | 3301 | Gerald Fowler | Delgado, Alex | Facilities | 185A/69-AC-001 | Pm for 69-AC-001 |
1/22/2025 12:09:18 | 3300 | Colmenares | Cameron, Benjamin | Facilities | 238A | HVAC switching support ARU2 |
1/22/2025 12:07:01 | 3299 | Juan juarez | Delgado, Alex | Facilities | 185A/69AC011 | Preventive maintenance |
1/22/2025 12:02:30 | 3298 | Capeto | Delgado, Alex | Facilities | 217A1A3A/ 69 AC 009 | PM |
1/22/2025 7:52:33 | 3297 | Juan Juárez | Delgado, Alex | Facilities | 217A1A3A/69AC007 | Preventive maintenance |
1/22/2025 7:51:37 | 3296 | Larry Antles | Delgado, Alex | Facilities | 217A1A3A/B69 AC 005 | PM B69 AC 005 |
1/22/2025 7:48:20 | 3295 | Capeto | Delgado, Alex | Facilities | 217A1A3A/ 69 AC 008 | PM |
1/22/2025 7:45:55 | 3294 | Justin Solis | Delgado, Alex | Facilities | 217a11a3a/ac-006-69 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/22/2025 6:46:05 | 3293 | Alma Armenta | Cameron, Benjamin | Facilities | E31A18A1A | Establish LP-5205 |
1/21/2025 15:19:33 | 3292 | Erik Line | Keusch, Justen | Facilities | 355A9A | Establish LOTO for AECR Ion Source RF Envelope Access Equipment |
1/21/2025 13:49:25 | 3291 | Balbino Mercadal | Keusch, Justen | Facilities | 178A | Perform Monthly PM on emergency lighting |
1/21/2025 12:07:34 | 3290 | Alma Armenta | Cameron, Benjamin | Facilities | UE592A | Install Data Logger in Panel |
1/21/2025 9:30:49 | 3289 | Alma Armenta | Cameron, Benjamin | Facilities | 246A4A | Install data logger in panel 246A4A |
1/21/2025 8:29:03 | 3288 | Colmenares | Cameron, Benjamin | Facilities | 81A2A | Switching support for PMT |
1/21/2025 8:21:53 | 3287 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A3A | Install data logger in panel 501A5A3A |
1/21/2025 8:04:51 | 3286 | Justin walker | Delgado, Alex | Facilities | SWGR238ACKT7 /02ARU002 | Preventive maintenance |
1/21/2025 8:03:46 | 3285 | Alma Armenta | Cameron, Benjamin | Facilities | 501A5A4A | Install data logger in panel 501A5A4A |
1/21/2025 6:59:28 | 3284 | Colmenares | Cameron, Benjamin | Facilities | 237A | Switching Support HVAC ARU-2 |
1/17/2025 8:11:27 | 3283 | Colmenares | Cameron, Benjamin | Facilities | M38A6A | Switching support PMT |
1/17/2025 8:04:57 | 3282 | Colmenares | Cameron, Benjamin | Facilities | MCC Mounted Disconnect 76KC07 | LOTO 76-KC-07 |
1/17/2025 7:51:27 | 3281 | Robert Ralph | Combs, Everett | Facilities | 331A15A | Remove switch controlling receptacle. |
1/17/2025 6:49:48 | 3280 | Andrew Southward | Cameron, Benjamin | Facilities | 70A2A8A | Install Data Logger in Panel |
1/16/2025 8:31:11 | 3279 | Colmenares | Cameron, Benjamin | Facilities | 345A | Switching support for PMT’s |
1/16/2025 8:20:09 | 3278 | Sayee Chea | Keusch, Justen | Facilities | M304A3A5A32A | Replacing light fixture with LED light fixture |
1/16/2025 7:31:44 | 3277 | Andrew Southward | Cameron, Benjamin | Facilities | 85B28A | Replace both motors for compressor at building 77 |
1/16/2025 6:39:26 | 3276 | Andrew Southward | Cameron, Benjamin | Facilities | 38A2A | Install Data Logger in Panel |
1/15/2025 13:45:19 | 3275 | Andrew Southward | Cameron, Benjamin | Facilities | 38A | Close breaker 38A5A |
1/15/2025 13:11:43 | 3274 | Balbino Mercadal | Keusch, Justen | Facilities | 66A4A4A | Perform Monthly PM on emergency lighting |
1/15/2025 10:07:16 | 3273 | Larry Antles | Delgado, Alex | Facilities | E35B15A1A/B50A AC 008 | PM AC 008 |
1/15/2025 8:40:00 | 3272 | Antonio Collado | Delgado, Alex | Facilities | 480a5a / ac-12-50b | Pm ac 12 |
1/15/2025 8:38:11 | 3271 | Andrew Southward | Cameron, Benjamin | Facilities | 33B39A | Install Data Logger in Panel |
1/15/2025 7:44:03 | 3270 | Juan Juárez | Delgado, Alex | Facilities | 513A7A11B1A/55AC038 | Preventive maintenance |
1/15/2025 7:29:05 | 3269 | Alma Armenta | Cameron, Benjamin | Facilities | 67A | Remove data logger in panel 67A |
1/15/2025 7:23:55 | 3268 | Capeto | Delgado, Alex | Facilities | E35B15A1A/ 50A AC 009 | PM |
1/15/2025 6:59:39 | 3267 | Andrew Southward | Cameron, Benjamin | Facilities | 38A3A | Install Data Logger in Panel |
1/14/2025 12:56:46 | 3266 | Balbino Mercadal | Keusch, Justen | Facilities | 215A3A1A | Replace ballast as needed |
1/14/2025 9:42:46 | 3265 | AndrewSouthward | Hendrick, Jeffery | Facilities | M305A4A6A | Troubleshoot OL on VFD for BL-49 |
1/14/2025 7:02:13 | 3264 | Capeto | Delgado, Alex | Facilities | 667A6A/ 90X ARU 001 | PM |
1/14/2025 6:51:47 | 3263 | AndrewSouthward | Cameron, Benjamin | Facilities | E460A5A1A10A | Perform LP-5488 |
1/13/2025 9:10:52 | 3262 | Christopher Nelson | Combs, Everett | Facilities | 306A4A | Switch panel 306A4A and Hang Red LOTO Locks for safety |
1/13/2025 8:36:48 | 3261 | Colmenares | Hendrick, Jeffery | Facilities | PNL 132 02 | Replace belts andSheves blower 15 |
1/13/2025 8:20:36 | 3260 | Larry Antles | Delgado, Alex | Facilities | 24A13A/B50 AC 20 | PM B50 AC 20 |
1/13/2025 8:14:25 | 3259 | Andrew Southward | Cameron, Benjamin | Facilities | 501A | Install Data Logger in Panel |
1/13/2025 8:05:11 | 3258 | Larry Antles | Delgado, Alex | Facilities | 25A17A40A/B50 AC 19 | PM AC 19 |
1/13/2025 7:39:16 | 3257 | Colmenares | Hendrick, Jeffery | Facilities | 238A | Support HVAC by Shutting off power and wrecking out breaker Utilizing chicken switch |
1/13/2025 7:20:35 | 3256 | Alma Armenta | Cameron, Benjamin | Facilities | E790A1A1A ckt 40 | Establish LP 5515 |
1/13/2025 7:12:18 | 3255 | Alma Armenta | Cameron, Benjamin | Facilities | 217A1A1A | Establish LP-5520 |
1/10/2025 10:26:36 | 3254 | Larry Antles | Delgado, Alex | Facilities | 217A3A3A/76 AC 11 | Replace B76 AC 11 outdoors fans and motors |
1/10/2025 8:26:25 | 3253 | Capeto | Delgado, Alex | Facilities | E38A9A/ 50B AHU 026 | PM |
1/10/2025 7:54:30 | 3252 | Christopher Nelson | Combs, Everett | Facilities | 335A | Install GFCI Receptacle for Water new water dispenser |
1/10/2025 7:29:20 | 3251 | Gerald Fowler | Delgado, Alex | Facilities | MCC38A6A/50B-AHU-025 | Pm for 50B-AHU-025 |
1/10/2025 7:21:16 | 3250 | AndrewSouthward | Cameron, Benjamin | Facilities | 671A9A | Change rating plug and downstream fuses for AC-3 and AC-4 |
1/10/2025 6:34:08 | 3249 | Andrew Southward | Cameron, Benjamin | Facilities | 85B28A | Install Data Logger in Panel |
1/9/2025 13:34:11 | 3248 | Balbino Mercadal | Keusch, Justen | Facilities | 345A | Perform Monthly PM on emergency lighting |
1/9/2025 13:20:27 | 3247 | Balbino Mercadal | Keusch, Justen | Facilities | E155B1A | Perform Annual PM on emergency lighting |
1/9/2025 11:02:10 | 3246 | Sayee Chea | Keusch, Justen | Facilities | M304A3A6A38A | Replaced lamps and ballasts |
1/8/2025 13:33:39 | 3245 | Balbino Mercadal | Keusch, Justen | Facilities | 238A3A3A | Perform Monthly PM on emergency lighting |
1/8/2025 10:16:30 | 3244 | Alma Armenta | Cameron, Benjamin | Facilities | 35C | Switching support for HVAC |
1/8/2025 9:32:19 | 3243 | Capeto | Delgado, Alex | Facilities | 35C/ 50A ARU 005 | PM |
1/8/2025 8:38:55 | 3242 | Gerald fowler | Delgado, Alex | Facilities | 659A9A/90XWH002 | Preventive maintenance |
1/7/2025 10:46:36 | 3241 | Balbino Mercadal | Keusch, Justen | Facilities | 33B39A | Perform Monthly PM on emergency lighting |
1/7/2025 10:32:08 | 3240 | Alejandro Lopez | Ramer, Robert | Facilities | 263A4A1A | Replace damaged 60amp pendant sleeve power receptacle along with circuit breaker |
1/7/2025 10:16:47 | 3239 | Capeto | Delgado, Alex | Facilities | 659A10A/ 90X ARU 002 | PM |
1/7/2025 9:59:30 | 3238 | Colmenares | Cameron, Benjamin | Facilities | PNL-028-50A | Disconnect GP 32 pump motor |
1/7/2025 6:49:15 | 3237 | Alma Armenta | Cameron, Benjamin | Facilities | 111A ckt 19 | Establish LP5517 |
1/6/2025 12:23:53 | 3236 | Shane Miller | Secheck, Stephen | Facilities | E38A9A1A | Troubleshoot light not working in cooridor 0239 |
1/6/2025 10:36:29 | 3235 | Capeto | Delgado, Alex | Facilities | 253A1A/ 46 AC 010 | PM |
1/6/2025 10:02:31 | 3234 | David Davis | Keusch, Justen | Facilities | 280A | LOTO and ZVV circuits 9 and 11 in panel 280A |
1/6/2025 8:03:50 | 3233 | Justin Solis | Delgado, Alex | Facilities | 35a-9/aru-006-50a | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/6/2025 7:33:00 | 3232 | Colmenares | Cameron, Benjamin | Facilities | 358A Ckt 7 & 8 | Established lotto for contractorsLP5507 |
1/6/2025 6:26:45 | 3231 | Andrew Southward | Cameron, Benjamin | Facilities | 652A1A1A | Install Data Logger in Panel |
1/3/2025 8:34:45 | 3230 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-005-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 8:31:05 | 3229 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-006-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 7:45:45 | 3228 | Colmenares | Cameron, Benjamin | Facilities | 37 GP 118 & 119 Disconnects & Controllers | Arc Flash Survey |
1/3/2025 7:44:39 | 3227 | Colmenares | Cameron, Benjamin | Facilities | Gp118 and 118 disconnect | Arc Flash study GP118 and 119 |
1/3/2025 7:42:17 | 3226 | Justin Solis | Delgado, Alex | Facilities | 95b-b21a/ac-008-62 | Analyze hazards. Define and implement controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
1/3/2025 7:10:38 | 3225 | AndrewSouthward | Cameron, Benjamin | Facilities | 215A3A2A | Remove data logger |
1/2/2025 7:08:47 | 3224 | AndrewSouthward | Cameron, Benjamin | Facilities | E217A2A2A | Troubleshoot/repair starter for bl-4 |
12/23/2024 8:14:33 | 3223 | Colmenares | Cameron, Benjamin | Facilities | E217A2A2A Ckt 4 | Troubleshoot blower for control circuit |
12/23/2024 7:19:16 | 3222 | Amsouthward | Cameron, Benjamin | Facilities | 90A8A | LOTO out 90A8, ZVV at mcc and repair bucket handles as needed |
12/20/2024 8:40:45 | 3221 | Nick g | Secheck, Stephen | Facilities | 501A7A/17 | Remove and replace juice box with xeal. |
12/20/2024 8:13:21 | 3220 | Colmenares | Cameron, Benjamin | Facilities | MCC35A10A | Arc flash for MCC 35A10A |
12/20/2024 7:02:28 | 3219 | Shane Miller | Secheck, Stephen | Facilities | 193A2A | Bring down panel, replace breaker for new microscope |
12/19/2024 12:37:49 | 3218 | Larry Antles | Delgado, Alex | Facilities | E38A9A/B50B ARU 009 | check amps on each circuit |
12/19/2024 10:25:23 | 3217 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A52A | Troubleshoot sander to find out why it’s not working. |
12/19/2024 9:41:18 | 3216 | Colmenares | Cameron, Benjamin | Facilities | M218a2a5d | Switching support |
12/19/2024 8:21:32 | 3215 | Juan Juárez | Delgado, Alex | Facilities | M238A4A/02ARU003 | Annual Preventive maintenance |
12/19/2024 8:02:14 | 3214 | AndrewSouthward | Cameron, Benjamin | Facilities | 357A1A | Perform monthly generator test |
12/18/2024 13:23:14 | 3213 | Robert Ralph | Combs, Everett | Facilities | 342A1A19A52A | Disconnect lathe |
12/18/2024 10:45:18 | 3212 | Robert Ralph | Combs, Everett | Facilities | 579A | Disconnect 2 drill presses and one lathe |
12/18/2024 10:10:14 | 3211 | Robert Ralph | Combs, Everett | Facilities | 347A28A | Add a receptacle to existing 120v circuit, remove existing receptacle and blank off. |
12/18/2024 9:38:26 | 3210 | Colmenares | Cameron, Benjamin | Facilities | E160A | Blower motor replacement 33 |
12/18/2024 9:09:02 | 3209 | Justin Solis | Delgado, Alex | Facilities | E679a-24/91-rf-102 | Analyzed hazards. Defined and implemented controls. LOTO. ZVV. Perform work. Remove LOTO. Restore power. |
12/18/2024 8:09:23 | 3208 | Larry Antles | Delgado, Alex | Facilities | 247A1A/B2 AC 002 | PM B2 AC 002 |
12/18/2024 6:01:52 | 3207 | Balbino Mercadal | Keusch, Justen | Facilities | 621A | Perform Monthly PM on emergency lighting |
12/17/2024 11:52:50 | 3206 | nick g | Secheck, Stephen | Facilities | 38A2A/5 | install a dent meter for panel 38A2A5A. |
12/17/2024 8:24:09 | 3205 | Andrew Southward | Cameron, Benjamin | Facilities | E363A1A | Switching support for fire alarm |
12/17/2024 7:40:21 | 3204 | Capeto | Delgado, Alex | Facilities | 49A3A3A/46 AC 019 | Replace IFM |
12/17/2024 7:25:05 | 3203 | Robert Ralph | Combs, Everett | Facilities | 647A7A | Get a measurement of the amperage of 120/208 v circuits in panel 647A7A |
12/17/2024 7:05:13 | 3202 | Larry Antles | Delgado, Alex | Facilities | DP-671A9A/91 AC 003 | Troubleshoot B91 AC 003 |
12/16/2024 10:00:03 | 3201 | Ari Harding | Other | Other | N/A | Safe off old 10kV capacitor found on mezzanine during cleanout |
12/16/2024 9:29:44 | 3200 | AndrewSouthward | Cameron, Benjamin | Facilities | M218A1A | Cycle power to VFD for GP-138 |
12/16/2024 9:27:51 | 3199 | Robert Ralph | Combs, Everett | Facilities | 302A3A | Open circuit Breaker 317 @ 302A3A and perform ZVV in order to replace 6x6” T with a straight piece of 6x6” wire way. |
12/16/2024 8:17:40 | 3198 | Capeto | Delgado, Alex | Facilities | 15A15A-65/53 UH 011 | Troubleshooting |
12/16/2024 7:25:44 | 3197 | Alma Armenta | Cameron, Benjamin | Facilities | 67A | Install data logger in panel 67A |
12/16/2024 7:20:57 | 3196 | Larry Antles | Delgado, Alex | Facilities | 200A/B55 AC 50 | Repair B55 AC 50 |
12/16/2024 7:08:24 | 3195 | Colmenares | Cameron, Benjamin | Facilities | AAC-002 disconnect | HVAC to replace circuit boards and air-conditioning unit number two |
12/16/2024 6:47:20 | 3194 | Alma Armenta | Cameron, Benjamin | Facilities | 38A3A | Install data logger |
12/14/2024 9:58:02 | 3193 | Balbino Mercadal | Keusch, Justen | Facilities | 30A2A4D | Perform Annual PM on emergency lighting |
12/14/2024 9:45:11 | 3192 | Balbino Mercadal | Keusch, Justen | Facilities | E31A18A3C | Perform Annual PM on emergency lighting |
12/13/2024 13:29:08 | 3191 | Balbino Mercadal | Keusch, Justen | Facilities | 635A1A4A | Perform Monthly PM on emergency lighting |
12/13/2024 8:52:17 | 3190 | Pica | Cameron, Benjamin | Facilities | 85-AD-16 (BL-16) | Restoration Switching |
12/13/2024 8:06:34 | 3189 | Gerald Fowler | Delgado, Alex | Facilities | 22A/76-AC-009 | Perform Pm on split system ac unit |
12/12/2024 13:17:46 | 3188 | Shane Miller | Secheck, Stephen | Facilities | 555A21A | Loto panel 555A21A, ZVV, Replace breaker for Microscope project |
12/12/2024 11:11:48 | 3187 | Colmenares | Cameron, Benjamin | Facilities | 38A switchboard | Switch to support for HVAC |
12/12/2024 7:34:13 | 3186 | Alma Armenta | Cameron, Benjamin | Facilities | EPP125A / 671A12A | Establish LP-5496 |
12/11/2024 13:30:16 | 3185 | Chris Nelson | Combs, Everett | Facilities | 295A4A | Replace GFCI RECEPTACLES |
12/11/2024 11:55:12 | 3184 | Alma Armenta | Cameron, Benjamin | Facilities | 263A1A ckt. 10 | Troubleshoot well pump EW-58-1 |
12/11/2024 10:12:19 | 3183 | David Davis | Combs, Everett | Facilities | 295A4A | LOTO circuits 1 and 5 in panel 295A4A to replace 4 malfunctioning GFCIs. |
12/11/2024 8:51:41 | 3182 | Alma Armenta | Cameron, Benjamin | Facilities | 217A1A1A ckt. 39 | Establish LP-5514 |
12/10/2024 13:24:56 | 3181 | Balbino Mercadal | Keusch, Justen | Facilities | E43A6A | Perform Monthly PM on emergency lighting |
12/10/2024 8:12:16 | 3180 | Andrew Southward | Cameron, Benjamin | Facilities | M80A7A | Replace valve controller on the sand filter |
12/9/2024 12:30:23 | 3179 | Larry Antles | Delgado, Alex | Facilities | 38A/50B ARU 007 | Replace Comp #1 |
12/9/2024 10:10:39 | 3178 | Alma Armenta | Cameron, Benjamin | Facilities | 650A2A2A | Troubleshoot VFD 30-VFD-19 |
12/9/2024 7:58:42 | 3177 | Alma Armenta | Cameron, Benjamin | Facilities | 33B39A | Install data logger in panel 33B39A |
12/9/2024 7:32:00 | 3176 | Andrew Southward | Cameron, Benjamin | Facilities | 95A40A | Install Data Logger in Panel |
12/9/2024 7:02:01 | 3175 | Andrew Southward | Cameron, Benjamin | Facilities | 696A | Install Data Logger in Panel |
12/6/2024 12:42:10 | 3174 | nick gripe | Secheck, Stephen | Facilities | 200A4A/7 | trace unknown circuit for future freezer. |
12/6/2024 12:16:13 | 3173 | Alma Armenta | Cameron, Benjamin | Facilities | W0406873 | Install data logger in panel 652A1A1A |
12/6/2024 11:17:38 | 3172 | Alejandro Lopez | Ramer, Robert | Facilities | 358A | Identify circuits feeding FH-001 AND FH-002 in room 0114 at building 85. |
12/6/2024 8:32:38 | 3171 | Colmenares | Hendrick, Jeffery | Facilities | MCC70A4A12A1A | Switching support |
12/6/2024 7:45:34 | 3170 | Capeto | Delgado, Alex | Facilities | DP 671A9A/91 AHU 001 | PM |
12/6/2024 6:25:32 | 3169 | Colmenares | Hendrick, Jeffery | Facilities | 85F39A | Lp-5495 |
12/5/2024 8:08:54 | 3168 | Colmenares | Cameron, Benjamin | Facilities | 650A2Ackt6&9 | Motor Replacements |
12/5/2024 7:59:59 | 3167 | Colmenares | Cameron, Benjamin | Facilities | MCC 001 70 | PMT Switching Support |
12/4/2024 11:57:39 | 3166 | Larry Antles | Delgado, Alex | Facilities | 217A3A1A/76 AC 12 | PM 76 AC 012 |
12/4/2024 9:12:11 | 3165 | Alejandro Lopez | Ramer, Robert | Facilities | 637A3A | Apply simple LOTO, ZVV and airgap furniture whip in order for contractor to install new power device on the partition wall for future phone booth. Release LOTO and test power devices. |
12/4/2024 8:45:06 | 3164 | Larry Antles | Delgado, Alex | Facilities | 217A3A3A/AC 11 | PM AC 11 |
12/4/2024 8:42:39 | 3163 | Dave Davis | Combs, Everett | ALS | 347A28A | Isolate energy source at panel 347A28A circuit 11 for receptacle on 2nd floor ALS building 6 lobby. LOTO, ZVV and remove receptacle faceplate. |
12/3/2024 8:25:12 | 3162 | Colmenares | Cameron, Benjamin | Facilities | 47A3A | Switching support |
12/3/2024 7:21:47 | 3161 | Larry Antles | Delgado, Alex | Facilities | 517A7ADA1A/B64 ARU 005 | PM 64 ARU 005 |
12/3/2024 8:17:28 | 3160 | Ben Agas and Ed Bekheet | Baird, Shawn | Facilities | E38A9A1A. 21,22,24 and 2 | Disconnect perm power and put temp power on all 4 FA panels off same breaker panel |
12/2/2024 13:56:46 | 3159 | Capeto | Delgado, Alex | Facilities | 148/ 76L AC 004 | PM |
12/2/2024 11:02:43 | 3158 | Alma Armenta | Cameron, Benjamin | Facilities | M70A4A8A | Establish LP-5317 / LP-5255 |
12/2/2024 10:35:31 | 3157 | Larry Antles | Delgado, Alex | Facilities | 47a5a9a4a/74B AC 001 | PM 74B AC 001 |
12/2/2024 10:35:31 | 3156 | Shane Miller | Secheck, Stephen | Facilities | E38A9A1A | Run temp power to FPU for up coming outage |
12/2/2024 9:27:31 | 3155 | Larry Antles | Delgado, Alex | Facilities | 47a5a9a1a/B74A AC 001 | PM B74A AC001 |
12/2/2024 8:08:33 | 3154 | Mike Chatham and Ed Bekheet | Baird, Shawn | Facilities | 38A2A6A, Circuit 4 | Disconnect perm power and hook up temp power to VESDA unit for Rm 2265 |
12/2/2024 7:30:06 | 3153 | Alma Armenta | Cameron, Benjamin | Facilities | E38A9A ckt 12 | Establish LP-5252 |
11/27/2024 8:30:49 | 3152 | Capeto | Delgado, Alex | Facilities | 35C10A/ 50A AHU 013 | PM |
11/27/2024 8:26:34 | 3151 | Larry Antles | Delgado, Alex | Facilities | M47A3A69A3A/ 74 AC 028 | PM B74 AC 28 |
11/27/2024 8:06:13 | 3150 | Gerald Fowler | Delgado, Alex | Facilities | 35C10A/50A-AHU-012 | Pm for 50A-AHU-012 |
11/27/2024 7:29:19 | 3149 | Antonio Collado | Delgado, Alex | Facilities | M47a3a69a3a, 74 ac 026 | Pm on ac 26 |
11/27/2024 7:18:57 | 3148 | Alma Armenta | Cameron, Benjamin | Facilities | 91-BL-002 VFD | Troubleshoot ground fault on 91-BL-002 |
11/27/2024 7:01:00 | 3147 | Juan juarez | Delgado, Alex | Facilities | 513A7A11B1A/46AC046 | Preventive maintenance |
11/26/2024 8:33:49 | 3146 | AndrewSouthward | Cameron, Benjamin | Facilities | 342A1A19A46A | Replace BL-02 |
11/26/2024 7:35:13 | 3145 | Colmenares | Cameron, Benjamin | Facilities | E359A | Switching support for Fire Alarm |
11/26/2024 7:31:37 | 3144 | AndrewSouthward | Cameron, Benjamin | Facilities | 754A | Perform LP-5314 |
11/25/2024 13:11:05 | 3143 | Alma Armenta | Cameron, Benjamin | Facilities | TSW 1 70A | Remove Installed Data Logger |
11/25/2024 11:32:34 | 3142 | Alejandro Lopez | Ramer, Robert | Facilities | 551A3A | Demo reactor glove box electrical feed from local disconnect to the unit in room 4206 at building 67. |
11/25/2024 9:28:33 | 3141 | Alma Armenta | Cameron, Benjamin | Facilities | EM30A5A3A | Provide switching support for PMT’s for several blowers on the roof |
11/25/2024 9:27:52 | 3140 | Larry Antles | Delgado, Alex | Facilities | 15A15A63A/ 53 AC 001 | LOTO, ZVV, Check and tighten electrical |
11/25/2024 9:17:43 | 3139 | Justin walker | Delgado, Alex | Facilities | 550A1a-16 | Perform annual pm |
11/25/2024 7:50:48 | 3138 | Alma Armenta | Cameron, Benjamin | Facilities | 85-TSW-01 / 357A1A | Replace timing relay on 85-TSW-01 and perform transfer test PM for EG-096-85 |
11/25/2024 6:48:21 | 3137 | Alma Armenta | Cameron, Benjamin | Facilities | 72A6A | Remove data logger in panel 72A6A ckt 17 |
11/23/2024 11:55:12 | 3136 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A33A | Perform Annual PM on emergency lighting |
11/23/2024 11:46:07 | 3135 | Balbino Mercadal | Keusch, Justen | Facilities | 116A1A46A | Perform Annual PM on emergency lighting. |
11/23/2024 11:37:45 | 3134 | Balbino Mercadal | Keusch, Justen | Facilities | E65A3A | Perform Annual PM on emergency lighting |
11/23/2024 11:27:34 | 3133 | Balbino Mercadal | Keusch, Justen | Facilities | 39A7A | Perform Annual PM on emergency lighting. Replace emergency fixture as needed. |
11/22/2024 13:40:12 | 3132 | Balbino Mercadal | Keusch, Justen | Facilities | 39A7A | Perform Monthly PM on emergency lighting |
11/22/2024 11:47:28 | 3131 | Shane Miller | Secheck, Stephen | Facilities | M460A1A | Troubleshoot disconnect handle at MCC panel |
11/22/2024 7:29:51 | 3130 | Cameron | Cameron, Benjamin | Facilities | 70A switchgear | Switching support |
11/22/2024 7:08:42 | 3129 | A. Armenta | Cameron, Benjamin | Facilities | 189A5A | Install Data Logger |
11/21/2024 12:47:23 | 3128 | Alejandro Lopez | Ramer, Robert | Facilities | 238A3A2A | Relocate FA horn strobe and lighting motion sensor in room 0247B at building 002. |
2024.12.19.3